Dedicated Chartered Professional engineer with more than 18 years working experience, and history of meeting company goals utilizing consistent and organized practices. Detail-oriented team player, skilled in working under pressure, and adapting to new situations and challenges to best enhance the organizational brand and provide meaningful contributions to the project, company, and community.
Overview
19
19
years of professional experience
1
1
Certification
Work History
Methods Manager / Temporary Works Engineer
Bouygues Construction Australia
03.2018 - Current
Lead methods and temporary works team for CBD South Precinct (Town Hall Station)
Prepare work sequences, feasibility studies, and method studies in line with project programme for CBD South precinct which consists of 3 shafts, station tunnel (trinocular), 5 adits, cut & cover link tunnel to Flinders Station, underpass and Flinders station upgrades
Coordinate with permanent works designer, design consultants, external checking parties (i.e. Proof engineer, Independent Reviewer, etc.), and site construction teams
Implement temporary works process starting from temporary works design brief review until issuance for construction
Review AMS prepared by construction team
Inspect temporary works existing on site and ensure all are properly documented
Involve in research, design, delivery, and usage of lining formworks.
Accomplish multiple tasks within established timeframes.
Maximize performance by monitoring daily activities and mentoring team members.
Designed temporary works for TBM (tunnel boring machine) breakout operations and re-assembly
Prepared method statements for future operations and client submission
Prepared calculation notes for ICE and TWC checking
Assisted method and design to analyse problem and come out of best solution by manipulating 3D drawings
Prepared submission drawings to be passed to sub-contractors for tender
Produced fabrication drawings of various steel structures, complete with connection details and quantity take-off
Prepared plans and setting out for urgent site use
Worked with TBM team to have sequence drawings for assembly and manipulation of TBM parts
Prepared drawings for tender projects and presentation to clients.
Trained and mentored competent and flexible workforce to meet project needs and promote positive work environment.
Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.
Reviewed technical drawings developed by CAD technicians and drafters.
Wrote, reviewed and edited technical document in accordance with template requirements.
Senior Draftsman
Unison Projects Company Limited
07.2006 - 04.2008
Utilized AutoCAD to sketch cladding details and solutions to site problems
Studied architectural plans and structural plans for preparation of tender drawings
Prepared sets of drawings for submission to Building Department, Hong Kong
Drafted detailed engineering drawings using AutoCAD
Trained new employees in basic operations of AutoCAD
Quantity Take Off -steel and panels for cladding
Use 3D modelling for better view of structures
Prepared fabrication drawings of cladding for sub-contractors' reference
Prepared plans, layouts and setting out for site use.
Interpreted technical drawings, schematics and computer-generated reports to make revisions to CAD drawings.
Developed CAD drawings from hand sketches, verbal instructions, and site visits.
Calculated dimensions and allowances with accurate precision for project specifications.
Created CAD models and drawings for TBM and temporary work designs.
Draftsman
Acciona Infraestructuras S.A.
07.2005 - 07.2006
Drafted detailed engineering drawings using AutoCAD
Used Excel and CE2000 to calculate elongation of bridge tendons
Prepared fabrication drawings and quantity take off of steel required for construction
Prepared drawings for positioning of launching gantry during typhoons and ordinary days
Created drawings for erection sequence of bridge segments
Utilized spreadsheets to compute major volume computations and other works.
Designer / Cad operator
Tri-8 Builders Company Limited
07.2004 - 03.2005
Designed street, drainage system and water pipes with aid of AutoCAD
Drafted lots, contours, street slope for hydrology studies prior to street, drainage pipe and water pipes design
Trained new employees in basic operation of AutoCAD
Prepared plans, layouts and profiles of design street and pipes for drainage and water systems.
Education
Bachelor of Science - Civil Engineering
Mapua Institute of Technology
Manila, Philippines
04.2002
Skills
Policy Implementation
Verbal and Written Communication
Performance Evaluations
Time Management
Strategic Planning
Staff Development
Accomplishments
Lead a team of 5 in the development of site installations, works sequences, feasibility studies, and temporary works of Town Hall Station (CBD South Precinct) consisting of 600m trinocular cavern, 3 major adits, complex smaller adits, and 3 shafts situated in a very busy business district of Melbourne.
Achieved successful delivery of projects Hong Kong West Drainage Project (HKWDP), Express Rail Link Project (XRL820) and Shatin-Central Link (SCL1128) through effectively helping with development of methods in assembly and dismantlement of TBMs.
Certification
Chartered Professional Engineer, 2021, The Institution of Engineers Australia