Summary
Overview
Work History
Education
Skills
Timeline
Generic

John Ashish Sandi

Cadet Estimator
Tarniet

Summary

Experienced Civil Engineer with a versatile background in academic and practical projects in India and Australia. Skilled in roles such as Civil Engineer, Construction Estimator, Civil Project Coordinator, and Site Engineer to effectively address evolving construction project requirements.

Overview

4
4
years of professional experience
7
7
years of post-secondary education
2
2
Languages

Work History

Cadet Estimator

Johns Lyng Group
01.2025 - Current
  • Attend sites and estimate for building reinstatement works.
  • Interpret the scope of work provided by consultants, and write scope of work documents when required.
  • Work in conjunction with supervisors to achieve set budgets.
  • Build new and leverage existing relationships with key insurance personnel within the industry.
  • Liaise with clients and insurers, and coordinate access to properties with insured parties.
  • Liaise with and engage subcontractors during the quotation stage. Ensure all work conforms to legislative and contractual OH&S requirements.
  • Ensure all inspections, certificates, and relevant documentation are signed off.
  • Travel around Wagga Wagga and surrounding areas.

CIVIL ENGINEERING INTERN

Flexible Pavement Construction Project
06.2021 - 03.2022
  • Company Overview: A ₹48-crore government-funded highway development project extending over 12.5 km, constructed over weak marine clay soils.
  • Conducted over 120 on-site material tests, including sieve analysis, modified Proctor tests, CBR evaluations, and bitumen extraction tests, ensuring compliance with MORTH quality standards.
  • Executed daily survey set-out alignments using total station and auto-level instruments across 12 km of roadway.
  • Interpreted over 75 technical drawings, including cross-sections, longitudinal profiles, and layer sequencing for GSB, WMM, DBM, and BC.
  • Documented as-built data and revised site layouts using AutoCAD to reflect on-ground deviations and material adjustments.
  • Participated in 30+ safety toolbox meetings, assisting with incident logging, and ensuring adherence to PPE and work-zone safety regulations.

Education

Masters - Construction and Infrastructure Management

Swinburne University of Technology
Hawthorn, Australia
02.2023 - 12.2024

Bachelors of Civil Engineering - B. Tech

Jawaharlal Nehru Technological University
07.2017 - 05.2022

Skills

AutoCAD (2D & 3D Drafting)

Reading Building Drawings

Building Estimation and Scoping

Client & Insurance Stakeholder Liaison

OH&S and Compliance Management

Budget & Cost Control

undefined

Timeline

Cadet Estimator

Johns Lyng Group
01.2025 - Current

Masters - Construction and Infrastructure Management

Swinburne University of Technology
02.2023 - 12.2024

CIVIL ENGINEERING INTERN

Flexible Pavement Construction Project
06.2021 - 03.2022

Bachelors of Civil Engineering - B. Tech

Jawaharlal Nehru Technological University
07.2017 - 05.2022
John Ashish SandiCadet Estimator