Detail-oriented, organized and meticulous employee. Works at fast pace to meet tight deadlines. Enthusiastic team player ready to contribute to company success.
Overview
22
22
years of professional experience
Work History
Project Engineer
Noske-Kaeser Marine
07.2022 - Current
Assisting the Project Manager and Production Manager in various aspects of the project (SEA-1180):
engineering,
design,
production & manufacture,
planning & scheduling, product quality checks,
asset management,
quality management system
Attending work site checking production work including installation checks, equipment commissioning and set-to-work activities on each vessel
FAT (Factory Acceptance Testing)
Maintained records for each project and engineering discipline.
SWMS (Safe Work Method Statements)
ITP (Inspection Test Plan).
Ensured quality control for all aspects of the project, reducing defects and rework.
Senior QA Technician
Babcock
05.2011 - 07.2022
QC Inspection – against drawings and or Standards
Supply Chain/Spares Management
Security Clearance: NV1
Supplier Quality Assurance
QMS (Quality Management System)
MDR - creation, vetting and sign offs
Non-Conformance Reports
Corrective Action Reports
Raise Continuous Improvement initiatives
Sound knowledge of ISO 9001: 2015
Document Control – Configuration Control
Audits - Maintain/update Audit Schedule for the year
Root Cause Analysis; 5 Why's
Calibration – maintain register
S&TE (Support & Test Equipment) Development
Security Clearance – NV1
ITAR.
Maintained a safe work environment by strictly adhering to established safety protocols and guidelines.
Trained new technicians on standard operating procedures, ensuring consistency across the team.
Shift Production Controller
ASC
05.2005 - 06.2009
Material Control - reserve/allocate stock to Project
Vetting/issuing of work packs - check the test sheet results have been completed and signed off
Scheduling – weekly scheduling meeting with Procurement and Boat supervisors (SPOD)
Security Clearance: Confidential
Primavera P3 – scheduling
Document Control – make sure the drawings in the work packs are the correct revisions
Control - MRP
Microsoft Office
Senior First Aid.
Reviewed documents and data to give accurate presentations and forecasts to upper management.
Quality Planner
ASC
07.2003 - 05.2005
Work pack creation – assign NDT; weld procedures; forms on the Maintenance Control Record (MCR)
Auditing – check results and sign offs of completed work packs
ITP (Inspection Test Plan)
PMST.
Quality/OH&S Officer
Andy's Engineering
07.2002 - 02.2003
Quality Control – inspect parts against drawings and or Australian Standards
Order processing – customized data entry software
OH&S – organize training, run monthly OH&S meetings
Scheduling – weekly meeting with Operations Manager and Supervisors.
Attended personnel meetings and training sessions to improve skills and learn new policies and procedures.
Maintained strict adherence to industry regulations, minimizing risk exposure for the organization.
Coordinated operations with other emergency service groups.
Project Engineer at Silver Dragon Construction & Lumber & Glass Supply, INC.Project Engineer at Silver Dragon Construction & Lumber & Glass Supply, INC.
Project Engineer at Design Department / Public Authority for Electricity and WaterProject Engineer at Design Department / Public Authority for Electricity and Water