FENCE LABORER
Esuarve
- Installed fencing posts and rails using a variety of tools.
- Performed daily maintenance checks on all equipment used for fence installation.
- Operated various power tools including saws, drills, and nail guns.
- Measured distances accurately for post placement.
- Unloaded trucks with necessary materials for job sites.
- Ensured that all tools were properly stored after each shift.
- Attended mandatory training sessions related to fence installation techniques.