Summary
Overview
Work History
Education
Skills
Languages
References
Timeline
Generic

Jorge Luis Rodriguez Pinzon

Perth WA, Australia,WA

Summary

Mining and Metallurgy Engineer with over 5 years of experience in long-term strategic mine planning (LOM) for open pit mining projects during pre-feasibility studies, as well as Underground Mining in feasibility studies, with a specific focus on the Sub-Level Caving method. I have collaborated with interdisciplinary teams to ensure the seamless integration of the entire project and identify potential cost-saving opportunities for projects which estimated capital expenditure (CapEx) exceed 1 billion US dollars.

Overview

8
8
years of professional experience

Work History

Technician

Diamantina Laboratories,
Perth , WA
06.2023 - Current
  • Operating devices and equipment such us scales, splitters, crushers and sieves, respecting safety practices and ceasing to use of any hazardous equipment which may affect integrity of results
  • Following-up of sample preparation protocols
  • Ensuring accuracy, precision and traceability of prepared samples

Mine Planning Engineer

ETK Inc. & Gold X
Georgetown, Guyana
04.2022 - 10.2023
  • Conducted technical evaluations of proposals for mine operations during the bidding process.
  • Defined drill and blast parameters for operational blasting and boulders size reduction.
  • Elaborated protocols for blasting activities.
  • Developed strategies for explosives supply and storage.
  • Determined the location and area of platforms for the installation of operational support facilities.
  • Defined laboratory equipment requirements for the preparation of grade control samples.

Short Term Planning Engineer

Minera de Cobre Quebradona, AGA
Medellin , Colombia
11.2018 - 03.2022
  • Contributed to the development of value-driven projects aimed at reducing the estimated capital cost of the mine.
  • Collaborated with various company departments to define battery limits, prepare and integrate feasibility studies, Environmental Impact Assessments (EIA), and Mine Work Plans (PTO).
  • Designed portals and adjusted the mine design for enhanced efficiency.
  • Reviewed and updated the mine cost model, ensuring accuracy and relevance.
  • Evaluated mine development and production plans in order to establish their feasibility and subsequent update of reserve declaration.
  • Estimated explosives and blasting accessories, establishing optimal supply and storage strategies through collaboration with the Colombian Army.
  • Played a key role in the development and review of the scope of work for the execution contract of mine access tunnels (18 km horizontal developments and 3 km vertical developments).
  • Conducted technical reviews of proposals from bidders for tunnel construction, providing support during negotiation rounds.
  • Assisted the mine management in contract administration for technical studies and contributed to budget estimation and scheduling.

Teaching Assistant - Mining Geology

National University of Colombia
Medellin , Colombia
07.2018 - 10.2018
  • Assisted to students in managing geological modeling software (Leopfrog).
  • Developed workshops and assisted to students with assessments.

Undergraduate Student / Junior Mining Professional

Gramalote Colombia Limited, AGA
Medellin , Colombia
06.2016 - 12.2017
  • Developed mine designs for final pits, phases, and waste disposal areas, focusing in strategic planning.
  • Built the medium-term mine plan, ensuring a cohesive and efficient roadmap for the projected mine operation.
  • Calculated costs associated with earthmoving activities prior to mining execution, contributing to accurate budgeting.
  • Produced visually compelling graphical representations of the mine plan, enhancing communication and facilitating a clear understanding of operational strategies.

Education

Bachelor of Engineering - Mining And Metallurgical Engineer

National University of Colombia
Medellin, Colombia
04-2017

Skills

  • Feasibility Studies
  • Open Pit Designs
  • Sublevel Caving Design
  • Mine Cost Model
  • Datamine
  • Deswik

Languages

Spanish
Native/ Bilingual
English
Professional

References

Javier Santillan

Deputy General Manager / Lundin Gold Ecuador

(+593) 994 498 137 - Available by WhatsApp

-

Miguel Roldan 

Technical Services Manager / Aris Mining - Colombia

(+57) 312 452 0712 - Available by WhatsApp

Timeline

Technician

Diamantina Laboratories,
06.2023 - Current

Mine Planning Engineer

ETK Inc. & Gold X
04.2022 - 10.2023

Short Term Planning Engineer

Minera de Cobre Quebradona, AGA
11.2018 - 03.2022

Teaching Assistant - Mining Geology

National University of Colombia
07.2018 - 10.2018

Undergraduate Student / Junior Mining Professional

Gramalote Colombia Limited, AGA
06.2016 - 12.2017

Bachelor of Engineering - Mining And Metallurgical Engineer

National University of Colombia
Jorge Luis Rodriguez Pinzon