Summary
Overview
Work History
Education
Certification
AWARDS AND ACKNOWLEDGEMENTS
Timeline
Generic

Joshua Duck

Redbank

Summary

I have worked on major tier 1 sites always been safety aware I have travelled to multiple places for work

Overview

2025
2025
years of professional experience
1
1
Certification

Work History

Bulk water carting

Acciona energy
2024 - 2024

Excavating HV trenches

HV Cable Installations

Miriat technologies
01.2023
  • Operations were Excavator operator loader operator tipper driver Acciona energy Windfarm project Warwick QLD

Paraburdoo Rio Tinto Site Bulk Water Cartage

CPB Western Ranges
01.2023
  • Most positions I have done are shut down work hence the number of changes in job fronts as majority of my major construction work has been shut down work

Carting Concrete Culverts

Robinsons Heavy Haulage
01.2021
  • For The Inland Rail Project Northstar to Narrabri

CPB Project dubbo truck and dog owner operator

PPN Precision Pipe Network
01.2020
  • Sub contracted through PPN Precision Pipe Network

Hotel manager

falveys Irish heart hotel
01.2010

Bulk Water Semi Water Cart

Vikon Constructions
01.2024 - 12.2024

Semi water cart Clarke creek wind farm project

Spray Seal Team Water Cart and Broom

Transport NSW Dubbo
01.2019 - 2020

Transport NSW spray seal travelling repairing roads

Education

Year 9 - undefined

Certification

Front end loader cert

Excavator cert

Workers on foot cert

4x4 off road cert

Bulk water cert

AWARDS AND ACKNOWLEDGEMENTS

Deck hand certificate tafe new, Small motors certificate tafe new, Metal manufacturing engineers tafe nsw, Nsw white card, Hc licence, RIW Card, Excavator ticket, Front end loader ticket, Bulk water cart ticket, 4x4 Driving ticket, I have done multiple remote work and worked along side of some big names in the industry I have done everything from road to rail remote and city work I’m not afraid of FIFO positions either have lived and worked out of plenty camps currently Rio inducted into the western ranges project aswell

Timeline

Bulk Water Semi Water Cart

Vikon Constructions
01.2024 - 12.2024

HV Cable Installations

Miriat technologies
01.2023

Paraburdoo Rio Tinto Site Bulk Water Cartage

CPB Western Ranges
01.2023

Carting Concrete Culverts

Robinsons Heavy Haulage
01.2021

CPB Project dubbo truck and dog owner operator

PPN Precision Pipe Network
01.2020

Spray Seal Team Water Cart and Broom

Transport NSW Dubbo
01.2019 - 2020

Hotel manager

falveys Irish heart hotel
01.2010

Year 9 - undefined

Bulk water carting

Acciona energy
2024 - 2024
Joshua Duck