A quick learner and effective team player, I excel in ensuring safety and quality standards while enhancing project efficiency. Proven ability to communicate clearly and build relationships, contributing to successful project outcomes.
Overview
9
9
years of professional experience
Work History
Roofer
Fast Response Plumbing
03.2025 - Current
Installed roofing materials efficiently, ensuring adherence to safety regulations and quality standards.
Conducted inspections to identify potential leaks and damage, recommending timely repairs to enhance roof longevity.
Collaborated with team members to complete projects on schedule, maintaining open communication throughout the process.
Operated power tools and equipment safely, performing routine maintenance to ensure optimal performance during projects.
Assisted in removal of old roofing materials and debris to prepare for application of new roofing.
Performed patching and resealing of roofs to provide maintenance, repairs and protection.
Inspected problem roofs to determine best repair procedures.
Traffic Control
Atlas Traffic Management
11.2016 - 02.2025
Assisted with traffic control efforts before and after school hours, ensuring the safe arrival and departure of students each day.
Coordinated with local authorities when necessary for road closures or traffic control measures during job site operations.
Contributed to efficient ground operations by coordinating with air traffic control, ramp agents, and other airport personnel.
Directed traffic control efforts during special events or emergencies, minimizing disruptions while ensuring public safety.
Ensured proper maintenance of traffic control equipment, identifying any issues and arranging for repairs or replacements as needed.
Provided training to new hires on company policies, procedures, and best practices in traffic control operations.
Demolition
AJAY DEMOLITIONS
01.2021 - 10.2021
Completed physically demanding tasks such as heavy lifting, digging, or demolition as required by each project''s needs.
Improved project efficiency by developing and implementing detailed demolition plans.
Minimized downtime due to unforeseen obstacles by proactively planning contingencies in advance for potential challenges during the demolition process.
Provided assistance during the demolition process, ensuring safe removal of debris from the worksite.