Summary
Overview
Work History
Education
Skills
Work Availability
Quote
Timeline
Generic

Kavaia Buck Navunisinu

Bankstown,NSW

Summary

Organized and motivated employee eager to apply time management and organizational skills in various environments. Seeking entry-level opportunities to expand skills to develop my career in a cross-cultural environment. It allows me to gain abroad experiences across various area of expertise.

To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level carpenter position. Ready to help team achieve company goals.

Overview

5
5
years of professional experience

Work History

Carpenter

THE ARTFUL DORGER
10.2022 - 12.2022
  • Checked measurements and completed accurate cuts to prevent materials waste and maintain cost controls.
  • Completed installations of building structures, trim, flooring and cabinetry.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Completed precise joining and high-quality finish work by properly anchoring and bracing structures.
  • Shaped or cut materials to specified measurements using hand tools, machines and power saws.
  • Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.

Carpenter

LUMAS CONSTRUCTION
03.2013 - 05.2014
  • Shaped materials to exact measurements for job requirements with hand tools and power equipment.
  • Cut timber, panels and other wooden materials according to measured dimensions.
  • Installed floor joists, trusses and rafters.
  • Identified and requested PPE necessary to perform tasks.
  • Covered subfloors to prevent moisture buildup and protect flooring installations.
  • Planned work based on blueprints and individual project specifications.

General Carpenter

BUCK CONSTRUCTION
03.2019 - 02.2021
  • Examined buildings and project specifications to determine measurements and dimensions.
  • Installed building windows, trim and cabinetry alone or with assistants to meet job deadlines.
  • Installed floor joists, trusses and rafters.
  • Promoted team safety by keeping work areas free of hazards.
  • Used band, circular, jig, reciprocating, chop and compound miter saws.
  • Organized assigned tasks for completion on individual and team levels.
  • Cut timber, panels and other wooden materials according to measured dimensions.
  • Shaped materials to exact measurements for job requirements with hand tools and power equipment.
  • Covered subfloors to prevent moisture buildup and protect flooring installations.
  • Painting and tiling
  • Work safety and certain heights.

Carpenter

NORTHERN PROJECTS FIJI LIMITED
10.2007 - 03.2008
  • Used band, circular, jig, reciprocating, chop and compound miter saws.
  • Installed floor joists, trusses and rafters.
  • Work safety at certain heights.
  • Promoted team safety by keeping work areas free of hazards.
  • Identified and requested PPE necessary to perform tasks.

Finishing Carpenter

FLETCHER CONSTRUCTION
10.2006 - 08.2007
  • Maintained high standards of workmanship with accurate, detail-oriented finishing work.
  • Produced high-quality work in full compliance with project standards and good carpentry practices.
  • Took accurate measurements to calculate size and amount of materials needed for project completion.
  • Kept worksites organized and tidy to reduce hazards.
  • Maintained clean and organized workplace to optimize performance, efficiency and safety.
  • Communicated with teammates and supervisors frequently to understand requirements and complete projects on time.
  • Removed damaged or defective parts or sections of structures and repaired or replaced using hand tools.
  • Measured and marked cutting lines on materials using rulers, pencils, chalk and marking gauges.
  • Consistently constructed square and level projects.
  • Safely operated power saws, planers, jointers, routers and pneumatic equipment for numerous days without accident.

Carpenter

FASTFORM GROUP AUSTRALIA
01.2023 - Current
  • Checked measurements and completed accurate cuts to prevent materials waste and maintain cost controls.
  • Completed installations of building structures, trim, flooring and cabinetry.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Shaped or cut materials to specified measurements using hand tools, machines and power saws.
  • Set and built form systems and set embeds.

Education

Certificate III - CARPENTRY

AUSTRALIA PACIFIC TECHNICAL COLLEGE
Suva,Fiji
06.2016

Certificate III - CARPENTRY AND JOINERY

RATU KADAVULEVU SCHOOL (Vocational Training)
Fiji,
12.2005

Some College (No Degree) - CARPENTER GENERAL

TRAINING PRODUCTIVITY AUTHORITY oF FIJI(TPAF)
Suva,Fiji
2005

Skills

  • Construction background
  • Safety oversight
  • Physical agility
  • Basic electrical knowledge
  • Strong analytical and communication skills
  • Flooring,walls and roof construction
  • General laborer
  • Form systems knowledge
  • Project management
  • Work safety at heights
  • Flooring Construction
  • Time Management
  • Strong Analytical Skills
  • Project Estimation and Bidding
  • Basic Plumbing Knowledge
  • Form Systems Knowledge
  • Log Home Construction
  • Drilling and Framing
  • Calculations and Measurements
  • Woodwork Restoration
  • Carpentry and Woodworking
  • Cut Wood to Size
  • Structural Knowledge
  • Forming and Pouring
  • Hand and Power Tool Operation
  • Project Layout
  • Carpenter's Levels

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Quote

There is a powerful driving force inside every human being that, once unleashed, can make any vision, dream, or desire a reality.
Tony Robbins

Timeline

Carpenter

FASTFORM GROUP AUSTRALIA
01.2023 - Current

Carpenter

THE ARTFUL DORGER
10.2022 - 12.2022

General Carpenter

BUCK CONSTRUCTION
03.2019 - 02.2021

Carpenter

LUMAS CONSTRUCTION
03.2013 - 05.2014

Carpenter

NORTHERN PROJECTS FIJI LIMITED
10.2007 - 03.2008

Finishing Carpenter

FLETCHER CONSTRUCTION
10.2006 - 08.2007

Certificate III - CARPENTRY

AUSTRALIA PACIFIC TECHNICAL COLLEGE

Certificate III - CARPENTRY AND JOINERY

RATU KADAVULEVU SCHOOL (Vocational Training)

Some College (No Degree) - CARPENTER GENERAL

TRAINING PRODUCTIVITY AUTHORITY oF FIJI(TPAF)
Kavaia Buck Navunisinu