Summary
Overview
Work History
Education
Skills
Timeline
Generic
KOSTAS PAPADOPOULOS

KOSTAS PAPADOPOULOS

Brisbane,QLD

Summary

Project Supervisor with 7+ years of experience in effectively managing resources, budgets, and timelines to ensure successful project completion. Adept at fostering productive relationships with clients and team members, identifying and addressing potential risks, and implementing innovative solutions. Demonstrated success in streamlining processes, ensuring adherence to quality standards, and delivering projects on time and within budget. Strong interpersonal and communication skills, with a proven ability to lead and motivate teams in fast-paced environments.

Overview

10
10
years of professional experience

Work History

Project Supervisor

Johns Lyng Group Strata
02.2023 - Current
  • Delivered projects on time by prioritizing multiple tasks.
  • Supervised work of 15 team members, offering constructive feedback regarding work performance.
  • Allocated project resources to drive productivity and maximize efficiency.
  • Coordinated and directed activities for $750k + projects.
  • Developed and monitored project schedules, budgets and objectives for successful completion.
  • Coordinated numerous small- and large-scale projects to meet client requirements.
  • Maintained high safety standards by following policies, procedures and protocols outlined by company
  • Developed and deepened relationships with key stakeholders

Site Supervisor

John Lyng Group
05.2022 - 02.2023
  • Project supervisor of 75+ cases from commencement to completion
  • Engage, coordinate & manage trades during the restoration process for buildings damaged by insurable events
  • Arrange, negotiate, delegate, and communicate with trades to monitor progress of jobs
  • Develop relationships between clients, contractors, and insurance companies
  • Estimate budgets and scope of works for all sites
  • Exceeding KPI and SLA requirements
  • Inspecting properties when jobs are complete ensuring that completed works adhere to Australian Standards
  • Ensure work adheres to legislative & contractual OHS requirements
  • Ensure all inspection, certificates of final inspection & other relevant documentation are signed off
  • Trained new team members on site policies and procedures.

Geo-technical/Senior Laboratory Technician

Lintin Geotechnical
08.2018 - 03.2022
  • Compile, log, and record testing or operational data for review and further analysis
  • Maintain and update databases of lab test results
  • Assemble, operate and/or maintain field or laboratory testing, measuring or mechanical equipment
  • Perform inspection and required in-progress quality control of testing equipment
  • Calibrate and/or repair testing equipment
  • Prepare or review technical reports on sampling, testing, or recommendations of data analysis
  • Maintained safe, tidy and organized laboratory environment for accurate test results.
  • Performed testing and quality control using approved laboratory procedures and instrumentation.
  • Provided support and guidance to junior lab staff.

Lead Hand/Cabinet Installer

4Kitchens
03.2017 - 08.2017
  • Plan and manage tasks in accordance with priorities and goals
  • Measure and mark dimensions of parts on paper prior to cutting, following blueprints, to ensure tight fit and quality product
  • Studied project plans and blueprints to determine required materials and specifications, plan projects and coordinated necessary supplies.
  • Assist with employee allocation and delegating tasks
  • Verify dimensions, check quality, and fit of pieces to ensure adherence to specifications
  • Efficiently completed scheduled work and started post scheduled construction to remain ahead on projects
  • Set up and operate machines, including power saws, shape wood stock and wood substitutes

Junior Site Supervisor/Foreman

Tomazos Group
02.2013 - 03.2017
  • Supervising and instructing construction team as well as subcontractors
  • Plan, implement and manage construction tasks in accordance with priorities and goals
  • Analyzing blueprints to ensure that construction projects meet design, safety, and budget specifications
  • Successfully implemented project cost control procedures and monitoring
  • Produce employee and project schedules, Monitor expenditures
  • Inventoried materials and ordered materials as needed
  • Allocate and delegate responsibilities
  • Supervise, train, and guide all employees, Always ensuring all Labor and other resources available
  • Acted as visible and available health and safety officer, devised appropriate risk management plans
  • Advised and supported improvements of standards, working conditions, communications and processes adhering to all health and safety responsibilities
  • Provided onsite training to help develop employee skills.

Education

Building Construction - CPC40120 Cert IV in Building And Construction

Charles Darwin University
Darwin, NT
09.2023

Project Management - Diploma of Project Management And Construction

TAFE Queensland
Acacia Ridge, QLD
04.2022

Geological Engineering - Diploma of Laboratory Technology

TAFE Queensland
Acacia Ridge, QLD
05.2021

Skills

  • Project Scoping
  • Progress Tracking
  • Operational Reporting
  • Work Breakdown Structure (WBS)
  • Document Management
  • Budgetary Controls
  • Risk Assessment
  • Project Planning
  • Safety Protocols Awareness

Timeline

Project Supervisor

Johns Lyng Group Strata
02.2023 - Current

Site Supervisor

John Lyng Group
05.2022 - 02.2023

Geo-technical/Senior Laboratory Technician

Lintin Geotechnical
08.2018 - 03.2022

Lead Hand/Cabinet Installer

4Kitchens
03.2017 - 08.2017

Junior Site Supervisor/Foreman

Tomazos Group
02.2013 - 03.2017

Building Construction - CPC40120 Cert IV in Building And Construction

Charles Darwin University

Project Management - Diploma of Project Management And Construction

TAFE Queensland

Geological Engineering - Diploma of Laboratory Technology

TAFE Queensland
KOSTAS PAPADOPOULOS