Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.
Overview
7
7
years of professional experience
Work History
Formwork Carpenter
Grant (GNL Formwork)
Gold Coast, QLD
01.2023 - Current
Assumed the role of leading hand and demonstrated strong leadership skills while overseeing a team.
Worked in confined spaces.
Assisted with the installation of formwork for concrete structures, including walls, columns and slabs.
Cut and set anchor bolts into wet concrete according to blueprints.
Dismantled existing formwork systems when required by project schedules.
Measured and cut timber to size in order to create formwork components.
Assembled scaffolding around the perimeter of the structure being formed.
Operated a variety of power tools such as saws, drills, sanders and grinders.
Placed wooden boards into position on a prepared foundation or flooring surface.
Removed all debris from work area after completion of each job.
Repaired damaged or weakened formworks using appropriate materials like wood glue, epoxy resin or screws.
Trained and mentored apprentice carpenters, offering positive reinforcement, and providing assistance when needed.
Maintained clean and organized workplace to optimize performance, efficiency and safety.
Worked independently on projects and tasks within carpentry team.
Conducted quality control inspections of finished work prior to pouring concrete.
Assisted in the installation of formwork and scaffolding for concrete structures.
Operated power tools such as jackhammers, drills, saws, grinders. to cut and shape wood or metal components.
Assembled bolts, nuts, screws, clamps, ties and braces to secure formwork components together.
Filled joints between forms with grout or sand and cement mixtures as specified by design plans.
Lifted heavy objects using proper techniques while working in tight spaces safely.
Measured, marked and cut lumber according to specifications provided by engineers or architects.
Ensured that all safety protocols were followed at all times on the jobsite.
Installed shoring systems to support vertical walls and slabs.
Constructed forms to create various concrete structures.
Dismantled forms using basic and advanced tools.
Compacted grade using jumping jack or plate compactor equipment.
Formwork Laborer
Misa Falala ( tongariginal)
Gold Coast , QLD
03.2017 - 02.2023
Performed various carpentry tasks such as constructing walls, installing doors, windows and siding.
Installed formwork for concrete structures according to specifications.
Assisted in the preparation of construction sites by clearing debris, leveling ground and erecting scaffolding.
Utilized power tools such as saws, drills and sanders when necessary on projects.