Accelerated overall job progress through active participation in the loading and unloading of materials onto and off of vehicles.
Optimized workflow by maintaining proper inventory of tools, equipment, and materials needed for each task.
Removed excess mortar and finished joints for uniform surface.
Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
Ensured cleanliness at various building sites and yard
Multi-Skilled Operator
Jbs Developments
London
12.2022 - 01.2024
Climbed ladders, worked with hand tools, drills, pumps and other hand-held and electrical equipment necessary for installing insulation.
Loaded and removed debris from sites to keep areas clean and avoid safety concerns.
Set up ladders, scaffolding, fences and temporary structures to prepare sites and protect public.
Ensured efficient debris removal by coordinating with waste management services during projects.
Operated unique equipment such as pneumatic hammers.
Read blueprints, drawings, and schematics to accurately carry out work.
Dug trenches and set up forms to specified requirements for concrete pours.
Demolished and repaired old concrete surfaces.
Mixed, spread, and patched concrete to specifications.
Skilled Laborer
Westside
London
09.2021 - 12.2023
Completed installation of drywall sheets on commercial and residential properties.
Enhanced safety protocols for the demolition process, reducing workplace accidents.
Performed job duties at low, medium, and advanced heights on regular basis while observing safety protocols to avoid possibility of accidents and falls.
Enhanced team productivity by assisting with the repair and replacement of various roofing systems.
Repaired and maintained roofing systems by replacing roofing tiles and refastening seams.
Checked measurements and completed accurate cuts to prevent materials waste and maintain cost controls
Laying concrete foundations with steel rebar
Materials Technician
CTS
London
02.2021 - 09.2021
Streamlined testing procedures, resulting in expedited report generation and faster decision-making processes.
Proactively identified potential issues in concrete samples, allowing for timely remediation and prevention of costly failures onsite.
Improved overall construction quality by providing comprehensive feedback and recommendations based on test results.
Ensured compliance with industry standards by performing thorough quality control checks on concrete samples.