Services, vent maintenance and extension plus underground stores stock up. Pumps install and swap out
The Client was extremely disorganised and they had ground support issues. I did not sign over because other mines closed down due to seismicity. It is too dangerous to work there.
leading a small team and fixing air, water poly pipe in the mine. Moving Mono pumps and bringing ground support underground. Moving RCT teleremote huts for bogging operations. Assisting charge up with stopes preparations for firing and isolating services as required. Fan moves for secondary ventilation
Nipper, Service Crew, Truck and Charge up offsider
John Clements Underground Foreman 0430286659
Deflector Gold Project
HBJ Jubilee
setting up headings/ offsiding Jumbo
hanging vent bag/ towing polly and installing it
assisting in fan moves and working in IT basket
trucking ore and waste/ marking correct S/P's
making radio calls for correct load placement
various mine shut downs -relining and TA work or basic rigging