Installed new air conditioning, heating and refrigeration systems (split and ducted) according to manufacturer's specifications and local codes.
Collaborated with team members on large-scale projects, ensuring timely completion and high-quality results.
Repaired and replaced motors, bearings and belts.
Enhanced system efficiency for clients by conducting thorough maintenance checks and performing necessary repairs.
Assisted in maintenance, repair and installation of ventilation systems.
Performed routine maintenance on heating and cooling systems.
Apprentice Plumber (Mechanical Services)
Pipework Solutions Pty Ltd
09.2013 - 09.2018
Contributed to successful project completion with precise measurements and cutting of pipes according to specifications.
Optimized system functionality by installing valves, hangers, supports, flanges, gaskets, bolts, clamps, fittings, insulation material according to job requirements.
Adapted quickly to new tasks or challenges within each project site environment without compromising quality or safety standards.
Operated drill motors, grinders, chop saws, hack saws, and burning torches to perform tasks.
Appropriately fitted pipes by identifying dimensions, sizes, and shapes needed to replace faulty pipes.
Streamlined projects by efficiently organizing equipment, tools, and materials needed for each task at hand.
Demonstrated proficiency in welding techniques required for joining various pipe types utilized within the scope of mechanical plumbing tasks.
Acquired hands-on experience with various welding techniques such as TIG, MIG, and stick welding to ensure strong pipe connections.
Contract Carpenter
Sole Trader
03.2011 - 09.2013
Solved complex construction challenges with innovative solutions, ensuring structural integrity without compromising aesthetics.
Maximized client satisfaction through consistent delivery of high-quality workmanship in all carpentry tasks.
Reduced material waste by accurately measuring, cutting, and assembling components for various construction projects.
Maintained tools and equipment in excellent condition, prolonging their lifespan and ensuring optimal performance during use.
Ensured compliance with building codes and regulations through diligent adherence to industry best practices and guidelines.
Carpenter
QBuild
08.2009 - 03.2011
Department of Housing building maintenance, general repairs and damage assessment, as well as construction of new Government buildings and renovations/upgrades.
Maintained up-to-date knowledge of building codes, construction materials, and repair methods for accurate damage evaluations.
Increased overall building efficiency with timely maintenance and repair of structures.
Ensured Disability Standards compliance through the installation of ramps, handrails, and other accessibility features.
Improved building safety by conducting thorough inspections and identifying necessary repairs.
Ensured safety of all workers by following strict industry guidelines and regulations during asbestos removal projects.
Apprentice Carpenter
Stokes Wheeler
10.2006 - 08.2009
Improved project efficiency by assisting in the setting out and construction of residential and commercial buildings.
Enhanced client satisfaction by collaborating with team members to complete projects on time and within budget.
Increased workplace safety by adhering to company guidelines and OSHA requirements during all carpentry tasks.
Strengthened team productivity by maintaining a clean and organized job site, ensuring easy access to tools and materials.
Enhanced safety measures by consistently following demolition procedures and guidelines.
Ensured compliance with industry regulations by following established guidelines for safe machinery operation at all times.
Equipment Maintenance Technician
Active Hire
10.2004 - 10.2006
Increased equipment uptime by performing timely preventive maintenance and routine inspections.
Reduced downtime through efficient troubleshooting and repair of malfunctioning equipment.
Maintained a safe work environment by adhering to established safety procedures and guidelines.
Ensured optimal equipment performance with regular calibration and alignment tasks.
Trades Assistant
PnD Cabinet Making
01.2004 - 10.2004
Utilized advanced woodworking techniques, maintaining a high degree of craftsmanship in all completed projects.
Assisted in the installation of finished cabinetry onsite for seamless integration into existing structures or new construction projects.
Constructed custom cabinets for residential and commercial spaces using varied hand and power tools.