Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Overview
35
35
years of professional experience
Work History
Rigger/Boilermaker
Metweld Steel
05.2022 - Current
Maintained compliance with all safety procedures from both client and employer.
Used hand signals and whistle to direct crane operator to lift components to specific positions.
Interpreted drawings, sketches and specifications for each job.
Structural steel erection
Rectification of structural steel .
Site set out of cleats, structural members, holding down bots etc
Welding and oxy work .
Rigger/Boilermaker
Barra Steel
04.2010 - 03.2022
Same as current employer.
Drove small Crawler Crane
Rigger Boilermaker
Berwick Rigging
01.2004 - 04.2010
Company Director.
worked on site, doing the same as current employer.
Done all bookwork involved with business.
Rigger
Unicrane Hire
01.2001 - 01.2004
Worked at heights and in confined spaces without difficulty.
Determined correct rigging requirements for equipment based on job specifications and environmental conditions.
Prepared and erected steel, torque and bolt-up connections.
Self-motivated, with a strong sense of personal responsibility.
Skilled at working independently and collaboratively in a team environment.
Used EWP including boom lifts and sissor lifts
Rigger
B&J Steel Erectors
01.1995 - 01.2001
Determined correct rigging requirements for equipment based on job specifications and environmental conditions.
Rigged for heavy lifts according to blueprint requirements.
Worked at heights and in confined spaces without difficulty.
Rigged cables and pipes in configurations to support loads and maintain crew safety.
Part of a family business.
Carpenter
Adco Constructions
01.1989 - 12.1994
Demonstrated close attention to detail to verify quality and accuracy of work.
Followed established job site safety regulations and maintained safe and clean work area.
Completed installations of building structures, trim, flooring, and cabinetry.
Planned and executed work with proper tools and materials to maximize productivity.
Education Support Integration Aid Primary School at Victorian Education DepartmentEducation Support Integration Aid Primary School at Victorian Education Department