Summary
Overview
Work History
Skills
Tickets, Licences,and Certifications
Timeline
Generic

Mark Kinsella

Adelaide,SA

Summary

Formwork carpenter in Australia for the past 13 years.

I have worked on some of the biggest projects in SA.


Urban superway, HIB North Terrace, Bowden rail upgrade, Crown Plaza- Frome Street, Sofitel- Currie Street, Darlington South Road upgrade, to mention some.


Currently Working on the Bridgewater bridge in Tasmania.

3/1 roster- FIFO

10/12 hour days




Overview

7
7
years of professional experience

Work History

Formwork Carpenter

Robar
05.2023 - Current
  • Construct conventional formwork from drawings.
  • Reduce material wastage by accurately measuring and cutting materials for formwork assembly.
  • Increase productivity by efficiently dismantling and cleaning formwork after concrete curing.
  • Collaborate with team members for timely completion of projects, adhering to deadlines.
  • Contribute to efficient workflow by maintaining a clean and organized worksite, reducing hazards.

Formwork Carpenter

Form 700
08.2019 - 05.2023

Highrise Formwork.

  • Very well-known and respected high-rise company. Very fast Paced Enviroment
  • Working on decks, walls and the core.
  • Always aware of deadlines
  • working as a team daily.

Formwork Carpenter

Hully
05.2017 - 08.2019

Civil Formwork

  • Planned and executed work with proper tools and materials to maximize efficiency.
  • Darlington upgrade, Bowden Rail upgrade
  • Piles, Capping beams, FRC works. Crash Barriers.
  • Pre-cast :- Super Ts, Noise Walls, Parapets.






Skills

  • Wall Forming
  • Slab Forming
  • Team Coordination
  • Physical Stamina
  • Column Forming
  • Concrete Formwork Construction

Tickets, Licences,and Certifications

High risk work licence

-Forklift

-EWP above 11meters

-Basic Scaffold.


Working at Heights.

Vertical lift

Scissor lift

Telehandler

HSR trained on current Job.

White Card.


References

1 - Current

McConnell Dowell

Jarrod Brosan 0421 139 941


2-Form 700

Paul Sheils 0415 074 991

Timeline

Formwork Carpenter

Robar
05.2023 - Current

Formwork Carpenter

Form 700
08.2019 - 05.2023

Formwork Carpenter

Hully
05.2017 - 08.2019
Mark Kinsella