Overview
Work History
Education
Languages
Timeline
Generic

Marlon Wijerathna

Cranbourne North,VIC

Overview

10
10
years of professional experience

Work History

Digital Engineering - CDE Administrator

WSP
04.2024 - 02.2025
  • Worked on the Eastern BTA (EBTA) project, specifically the Eastern Freeway Upgrade from Burke Road to Tram Road.


  • Served as a CDE Administrator, managing ProjectWise support and overseeing the integration of 2D and 3D collaboration tools, including iModel and iTwin.


  • Delivered ProjectWise and iTwin training sessions for clients and project teams to improve workflow efficiency and collaboration.

BIM/DE Coordinator Design (SPA)

WSP
01.2019 - 05.2022
  • Provided SPA ProjectWise support, federated and managed coordination models across multiple packages, including clash detection and issue tracking.
  • Led Design Coordination Meetings (DCM) for model navigation.
  • Conducted training on Revizto, ProjectWise, and iTwin software packages.
  • In charge of updating the Revizto and iModel Design Federated models for Design Coordination meetings along with clash detection using Navisworks Manage.

Civil Structural Drafter (SPA)

WSP
01.2018 - 01.2019
  • Worked on the SPA Level Crossing Removal Project along the Frankston Line to remove congested level crossings.
  • Prepared and delivered drafting packages for submission to MTM/LXRP.

Trainee Civil Drafter - Mordialloc Bypass Referanc

WSP
04.2017 - 01.2018
  • Designed intersection and freeway signage from Springvale Road to Dingley Bypass using the GuideSIGN software package.
  • Assisted in freeway extension planning to improve traffic flow and congestion.

Trainee Civil Drafter - M1 Upgrade

WSP
04.2017 - 01.2018
  • Contributed to Stage 2 of the M1 Upgrade, Clyde to Cardinia Rd adding extra inbound and outbound lanes on the Monash Freeway.
  • Designed freeway signage using the GuideSIGN software package.


Trainee Civil Drafter - CTD

WSP
04.2017 - 01.2018
  • Contributed to the sky rail project aimed at easing congestion at level crossings between Caulfield and Dandenong.
  • Assisted in drafting packages for submission to VicRoads and VicTracks.

Drafter Assistant - Water/Waste Water Project

Gippsland Water
01.2015 - 12.2016
  • Focused on updating CAD drawings for existing sewerage pumping stations in Gippsland.
  • Ensured compliance with Gippsland Water standards.

Education

Advanced Diploma in Civil Engineering - Civil Engineering

Swinburne University of Technology
Melbourne, VIC
12-2012

Languages

English
Full Professional
Sinhala
Native or Bilingual

Timeline

Digital Engineering - CDE Administrator

WSP
04.2024 - 02.2025

BIM/DE Coordinator Design (SPA)

WSP
01.2019 - 05.2022

Civil Structural Drafter (SPA)

WSP
01.2018 - 01.2019

Trainee Civil Drafter - Mordialloc Bypass Referanc

WSP
04.2017 - 01.2018

Trainee Civil Drafter - M1 Upgrade

WSP
04.2017 - 01.2018

Trainee Civil Drafter - CTD

WSP
04.2017 - 01.2018

Drafter Assistant - Water/Waste Water Project

Gippsland Water
01.2015 - 12.2016

Advanced Diploma in Civil Engineering - Civil Engineering

Swinburne University of Technology
Marlon Wijerathna