Insightful Manager with experience directing and improving operations through effective employee motivational strategies and strong policy enforcement. Proficient in best practices, market trends and regulatory requirements of industry operations. Talented leader with analytical approach to business planning and day-to-day problem-solving.
This required the demolition of the existing dolphins and the installation of 18 new Dolphins for the larger ships to moor up to while being loaded and a new state of the art Ship Access Platform and all new under wharf access walkway platforms. Four new Sub boards for each of the four berths at Wharf level and all new electrical lighting, Power and control systems for all under wharf electrical apparatus, all being done while Jetty and shiploader were still operational, closing one Berth at a time as to not affect RIO Tinto's production requirements.
CBH E type storage upgrades and complete re-wires at Morowa and Minginew sites.
A few of the jobs are documented below:
Responsible for a team of up to 30 people for all above ground connections and testing of the HV network linking between the Substation and PCS's, PCS's to combiner boxes linking together the 1.35 million fixed non-tracking solar panels. All instrumentation involved in the weather station systems.
Reporting directly to senior management on upcoming works, estimation submissions and works in progress daily operation meetings, HSE compliance, Electrical compliance rectification works.
Rectification works of the 22 x 2.5MW general electric wind turbines to meet Australian Regulatory compliance to AS/NZ3000 standards
Installation of site office and ablutions facilities, 30KW water bore installation, mobile concrete silo maintenance and repairs.
Directly responsible for 11 electricians, four instrument technicians and two tube fitters and one HA inspector for all electrical/instrumentation works on the installation of two new wellheads and one centralised northern hub and upgrades to the existing Xyris productin facility that the new installation tied into.
All daily site reporting and client meetings.
KPI's, HSE compliance, pre-starts and toolboxes and managing cable/equipment/instruments ITR's and HA inspections for the Dossier.
Also completed the same type of works for CPB during the BHP Minning Area C upgrade and extension to the existing mine site.
CPB also engaged us to complete breakdowns and maintainence of there critical site equipment, while completing our scope of works.