Adept at construction supervision and site safety management, I significantly contributed to the successful completion of projects like CHEP Hospital, Brookfield Place and Westmead Hospital with Multiplex. Leveraging skills in scheduling and planning, I led teams of up to 8 direct reports including 4 supervisors 2 site engineers and 2 graduates to achieve critical milestones, ensuring projects met stringent standards and timelines. I have frequently dealt directly subcontractor managers and owners to ensure labour and resourcing requirements are met in not only the areas im overseeing but across the project as a whole, I have most recently led the entire team at a site level in closing out OC related items to achieve OC on the CHEP project and managing the defecting and completion process through the entire CHEP fitout to achieve building SC.
CHEP Hospital
- Assisted Site Manager with site establishment planning for CHEP Hospital including locating/planning site accommodation locations and sizes, tower crane and hoist placement
- Collaborated with Site Manager to develop Civil program
- Developed long range structure program for CHEP that was utilised and incorporated into subcontractors contract programs
- Oversaw site establishment of the CHEP project
- Supervised Asbestos removal and Demolition of Building 5 to enable CHEP construction
- Supervised all Civil works for CHEP project
- Supervised entire Structure for CHEP project
- Supervised 5 levels of CHEP hospital fit out (ICU/ Cardiac ward/ Catheterisation labs/ IPU/ Plantroom/roof space/ Helipad)
Brookfield Place Wynyard
- Supervised 30 levels front/ back of house lift lobbies and Male/Female bathroom spaces
Westmead CASB Hospital
- Supervised Civil works/slab prep inside the main building footprint in Asbestos contaminated soil
- Supervised the main CASB structure (90,000m2)
- Supervised 3 levels of Hospital fit out predominantly consisting of IPU spaces but also contained the first patient holding National Infectious disease unit built to a PC3 standard in Australia which was constructed based on a specialist hygienist briefing report used to get to the required standard
University of Canberra Public Hospital
- Supervised Facade/ Roof and Landscaping works including numerous internal courtyards
South East Regional Hospital
- General carpentry works
- Managed closing out defects in the lead up to PC
- Managed defect/handover DLP period onsite after PC for 5 months by myself
- Residential carpentry working on roughly 15 new houses over the span of 2 years
- Competent in all aspects os capentry including but not limited to (wall framing/ roof trusses/ decking/ door hanging/ fit out/off works)
Certificate 3 Carpentry