Summary

Adept at construction supervision and site safety management, I significantly contributed to the successful completion of projects like CHEP Hospital, Brookfield Place and Westmead Hospital with Multiplex. Leveraging skills in scheduling and planning, I led teams of up to 8 direct reports including 4 supervisors 2 site engineers and 2 graduates to achieve critical milestones, ensuring projects met stringent standards and timelines. I have frequently dealt directly subcontractor managers and owners to ensure labour and resourcing requirements are met in not only the areas im overseeing but across the project as a whole, I have most recently led the entire team at a site level in closing out OC related items to achieve OC on the CHEP project and managing the defecting and completion process through the entire CHEP fitout to achieve building SC.

Overview

10
10
years of professional experience
1
1
Certification

Work History

Senior Site Supervisor

Multiplex
05.2021 - Current

CHEP Hospital

- Assisted Site Manager with site establishment planning for CHEP Hospital including locating/planning site accommodation locations and sizes, tower crane and hoist placement

- Collaborated with Site Manager to develop Civil program

- Developed long range structure program for CHEP that was utilised and incorporated into subcontractors contract programs

- Oversaw site establishment of the CHEP project

- Supervised Asbestos removal and Demolition of Building 5 to enable CHEP construction

- Supervised all Civil works for CHEP project

- Supervised entire Structure for CHEP project

- Supervised 5 levels of CHEP hospital fit out (ICU/ Cardiac ward/ Catheterisation labs/ IPU/ Plantroom/roof space/ Helipad)

Site Supervisor

Multiplex
06.2020 - 04.2021

Brookfield Place Wynyard


- Supervised 30 levels front/ back of house lift lobbies and Male/Female bathroom spaces

Site Supervisor

Multiplex
01.2018 - 05.2020

Westmead CASB Hospital

- Supervised Civil works/slab prep inside the main building footprint in Asbestos contaminated soil

- Supervised the main CASB structure (90,000m2)

- Supervised 3 levels of Hospital fit out predominantly consisting of IPU spaces but also contained the first patient holding National Infectious disease unit built to a PC3 standard in Australia which was constructed based on a specialist hygienist briefing report used to get to the required standard

Site Supervisor

Multiplex
05.2016 - 12.2017

University of Canberra Public Hospital


- Supervised Facade/ Roof and Landscaping works including numerous internal courtyards

Apprentice Carpenter

Multiplex
01.2015 - 05.2016

South East Regional Hospital


- General carpentry works

- Managed closing out defects in the lead up to PC

- Managed defect/handover DLP period onsite after PC for 5 months by myself

Apprentice Carpenter

Baker Builders
01.2014 - 12.2014

- Residential carpentry working on roughly 15 new houses over the span of 2 years

- Competent in all aspects os capentry including but not limited to (wall framing/ roof trusses/ decking/ door hanging/ fit out/off works)

Education

High School Diploma -

Eden Marine High School
Eden, NSW
11.2012

Skills

  • Construction supervision
  • Scheduling and Planning
  • Multitasking
  • Site Safety Management

Certification

Certificate 3 Carpentry

Timeline

Senior Site Supervisor

Multiplex
05.2021 - Current

Site Supervisor

Multiplex
06.2020 - 04.2021

Site Supervisor

Multiplex
01.2018 - 05.2020

Site Supervisor

Multiplex
05.2016 - 12.2017

Apprentice Carpenter

Multiplex
01.2015 - 05.2016

Apprentice Carpenter

Baker Builders
01.2014 - 12.2014

High School Diploma -

Eden Marine High School
Matthew Winnel