Amazon Project
- Operation of crawler cranes up to 400T (Manitowoc 16000 and 999)
- Operation of franna
Metro Tunnel
- Operation of crawler cranes up to 60T (Sennebogen and Liebherr)
- Rigging and Dogging of cranes
- Operating and Dogging gantry cranes
- Shift work
- General crane hire
- Structural steel installation
- Dogging and operating mobile cranes
- Panel erection
- Dogging tower cranes
- Remove and install pipework and valves
- Structural steel installation
- Dogging mobile cranes
- Shutdown and digestion unit 1, 2, 3 and 4
- Remove and install valves
- Dogging mobile cranes
- Replacing grid mesh with checker plate at Gladstone Port
- Dogging and Rigging mobile cranes
- General crane hire
- Building pin jib and tower cranes
- General rigging and dogging of cranes
- Structural steel erection
- Pipe rigging
Boyne Island Smelter Rail Replacement Project - lines 1, 2, 3 and 4 replacing all overhead rails
- Dogging cranes
- Removing and installing crane rails
Boyne Island Smelter CBF4 Project
- Rigging and Dogman work
- Trades assistant
- Elevated work platform
- General labour
Boyne Island Smelter AADS Project - lines 1 and 2 replacing alumina dust feed
- Rigging and Dogman work
- Trades assistant
- Elevated work platform
- General labour
- Rigging
- Structural steel erection
- Elevated work platform
- Dogman work
- General labour
- Rigging
- Structural steel erection
- Elevated work platform
- Dogman work
- General labour
- Open Crane Operator License
- Intermediate Rigging Certificate
- EWP
- Scissor Lift
- Victorian Drivers License, Class HR
- Red Card
- White Card
- Damstra Spark Induction