Summary
Overview
Work History
Education
Skills
Affiliations
Education And Personal Development Programs
Survey Equipment Used
Email Addresses
Residency
Children Names
Languages
Hobbies and Interests
Professional Licenses And Societies
Personal Information
Timeline
Generic
MAURINO ISAGANI TUSCANO JR

MAURINO ISAGANI TUSCANO JR

Sunshine West,Australia

Summary

Accomplished surveyor with 20 years of extensive experience working in the construction industry. Excellent in safety awareness, ability to work in team environment and strong attention to detail. I excel in data processing and team collaboration, ensuring precise project execution and compliance with engineering standards. Recognized for enhancing survey accuracy and efficiency.

Overview

22
22
years of professional experience

Work History

Tunnel Surveyor

Surex Surveyors Pty. Ltd.
Melbourne, Australia
08.2018 - Current
  • Company Overview: West Gate Tunnel Project, Melbourne, Victoria, Australia
  • Tunnel Boring Machine Guidance.
  • Concrete segment as-built and reporting.
  • VMT Guidance troubleshooting.
  • Conformance of tunnel excavation.
  • Rock bolt and cable bolts set out for cavern support.
  • Set-up guidance for road headers and bolters.
  • Monitoring of tunnel shearing.
  • Control network survey.
  • Data processing for as-built reports.
  • West Gate Tunnel Project, Melbourne, Victoria, Australia

ISBL Survey Engineer

Bechtel Australia
Onslow, Australia
01.2016 - 03.2017
  • Company Overview: Wheatstone LNG Project, Onslow, Western Australia, Australia
  • Construction support for Train 1 and Train 2 mechanical, structural and piping.
  • Setting of modules: check and adjust final elevation of soleplates as per as-built positions, set-out baseplate location, check verticality of the structure.
  • Dimensional survey: Pre-landing and postlanding survey of equipment, skids, pipes, and pumps.
  • As-built pipe spools and flanges, marking of reference for pipe installation.
  • Setting-out anchor bolt location, gridlines, centerline for vessels, pumps, skids, and structural platforms.
  • Control network survey.
  • Process data for final report.
  • Wheatstone LNG Project, Onslow, Western Australia, Australia

Survey Engineer

Bechtel Australia
Gladstone, Australia
03.2013 - 02.2016
  • Company Overview: Australia Pacific LNG Project, Curtis Island, Gladstone, Queensland, Australia
  • Pre and post pour check of anchor bolts and process the above survey data and submit residuals to responsible engineer.
  • Vertical and horizontal alignment of pipe racks, electrical racks, vessels, crane rail, modules and cold boxes.
  • Setting-out for mechanical, piping, structural, electrical, civil and earthworks.
  • As-built survey of underground utilities and process data for records.
  • Prepare excavation and backfill permits.
  • Monitor survey control networks and benchmarks including structures for subsidence and movement.
  • Managing data from P1 and DB drawings to DXF upload to controller for field set-out.
  • Assisting and giving direction to chainmen and less experience surveyor.
  • Australia Pacific LNG Project, Curtis Island, Gladstone, Queensland, Australia

Surveyor

Bechtel International
Soyo, Angola
05.2010 - 05.2012
  • Company Overview: Angola LNG Project, Soyo, Angola, West Africa
  • Survey verification of bolts location and elevation for vessels, communication towers, light posts, structural steel columns.
  • Survey verification of embed plate’s location and elevation for sumps and walls.
  • Final checking of elevations for concrete pouring.
  • As-built survey of underground utilities, electrical cables, nozzle’s location and elevation.
  • Check verticality of structural steel columns for pipe racks.
  • Setting-out of grid lines, centrelines, skids for equipment, catch basins, ditches, dikes, condensate tank, butane tank and propane tank.
  • Provide off-set elevation for pad plate setting.
  • Setting-out of finish grade level.
  • Monitor survey control networks and benchmarks.
  • Angola LNG Project, Soyo, Angola, West Africa

Surveyor

Mustafawi Trading and Engineering Company
Doha, Qatar
02.2008 - 02.2010
  • Company Overview: Various Projects, Doha, Qatar
  • Various Projects, Doha, Qatar
  • Hired by the Following Companies:
  • Kempe Engineering Services (Australian Company) - Project: Qatar Aluminum Plant, Location: Mesaieed, Qatar, Period: Jun 2009 to Nov 2009.
  • Duties and Responsibilities: Vertical and horizontal alignment of steel columns, Alignment of conveyors and elevators, Finalize elevation for concrete pouring.
  • Al Reyami Steel Construction - Project: Qatar Aluminum Plant, Location: Mesaieed, Qatar, Period: Apr 2009 to May 2009.
  • Duties and Responsibilities: Center line marking for beams and columns structure installation.
  • Hochtief Construction Qatar (German Company) - Project: Barwa Commercial Avenue (Six Kilometer Building), Location: Industrial Area, Doha, Qatar, Period: June 2008-March 2009.
  • Duties and Responsibilities: Setting-out of column footings, Checking of rebar elevation before concrete pouring for ground level slab.
  • Swissboring Trevi Company - Project: Barwa Financial District, Location: West Bay, Doha, Qatar, Period: February 16,2008-May 2008.
  • Duties and Responsibilities: Topographic survey for volume computation, Setting-out for columns, Checking alignment of columns and beams, Elevation checking of column base plates.

Port Surveyor

Philippine Ports Authority
Manila, Philippines
03.2007 - 02.2008
  • Company Overview: Manila, Philippines
  • Responsible for topographic and hydrographic surveys of proposed port project.
  • Responsible for volume computations of dredge materials, rocks, gravel, sand and selected fill of port projects.
  • Manila, Philippines

Road Surveyor

Geo-Technical Surveys and Construction
Pampanga, Philippines
03.2006 - 07.2006
  • Company Overview: Phase 2, Subic Clark-Tarlac Expressway, Pampanga, Philippines
  • Responsible for computing azimuth and distances of offsets, staking for slope reference.
  • Responsible for center line lay-out and elevation for blasting purposes.
  • Responsible of construction limits.
  • Phase 2, Subic Clark-Tarlac Expressway, Pampanga, Philippines

Municipal Surveyor

Local Government Unit
Tayum, Philippines
08.2003 - 02.2006
  • Company Overview: Various Projects, Tayum, Abra, Philippines
  • Responsible for site development plan, location map and vicinity map for the issuance of building permit.
  • Responsible for relocation survey of municipal properties.
  • Practice as a private surveyor, conduct relocation survey and prepare subdivision plans.
  • Various Projects, Tayum, Abra, Philippines

Education

Certificate - Excellence Award

Australia Pacific LNG Project
01.2015

Certificate - Digital Geographic Positioning Systems

Philippine Ports Authority Training Center
07.2007

Certificate - 18th Annual Regional Convention

Geodetic Engineers of the Philippines Inc.
02.2005

Bachelor of Science - Geodetic Engineering

University of Northern Philippines
03.2003

Associate - Geodetic Engineering

University of Northern Philippines
03.2000

Bachelor of Science - Civil Engineering (Undergraduate)

Saint Louis University
10.1997

Skills

  • MS Office
  • Terramodel
  • AutoCad Civil 3D
  • Starnet
  • Trimble Business Center
  • Trimble S6/S8/SX12
  • Trimble Dini Level
  • Leica MS60/TS16/TM50
  • Leica DNA03 and LS15
  • Topcon Total Station
  • Sokkia Total Station
  • South Total Station
  • Auto Level Instruments

Affiliations

Geodetic Engineers of the Philippines

Education And Personal Development Programs

  • Bachelor of Science, University of Northern Philippines, Geodetic Engineering, 06/01/01 - 03/01/03
  • Associate, University of Northern Philippines, Geodetic Engineering, 11/01/97 - 03/01/00
  • Bachelor of Science, Saint Louis University, Civil Engineering (Undergraduate), 06/01/95 - 10/01/97
  • Digital Geographic Positioning Systems, Philippine Ports Authority Training Center, 07/23/07 - 07/27/07
  • 18th Annual Regional Convention, Geodetic Engineers of the Philippines Inc., 02/26/05 - 02/27/05
  • Excellence Award, Australia Pacific LNG Project, 01/28/15

Survey Equipment Used

  • Trimble S6/S8
  • Trimble Dini Level
  • Leica MS60/TS16
  • Leica DNA03
  • Topcon Total Station
  • Sokkia Total Station
  • South Total Station
  • Auto Level Instruments

Email Addresses

  • Keithtuscano@yahoo.com
  • Mtuscano@surex.com.au

Residency

Permanent Resident in Australia

Children Names

  • Cypher Truth Tuscano
  • Cyaninth Tuscano

Languages

  • English
  • Tagalog
  • Ilocano

Hobbies and Interests

  • Playing Basketball
  • Fishing
  • Mountain Biking
  • Reading
  • Travelling

Professional Licenses And Societies

Registered Geodetic Engineer, 07/11/03, Professional Regulation Commission, 5985

Personal Information

  • Height: 1.75M
  • Weight: 85Kg
  • Citizenship: Australian
  • Spouse's Name: May Florence Bose-Tuscano
  • Date of Birth: 02/05/78

Timeline

Tunnel Surveyor

Surex Surveyors Pty. Ltd.
08.2018 - Current

ISBL Survey Engineer

Bechtel Australia
01.2016 - 03.2017

Survey Engineer

Bechtel Australia
03.2013 - 02.2016

Surveyor

Bechtel International
05.2010 - 05.2012

Surveyor

Mustafawi Trading and Engineering Company
02.2008 - 02.2010

Port Surveyor

Philippine Ports Authority
03.2007 - 02.2008

Road Surveyor

Geo-Technical Surveys and Construction
03.2006 - 07.2006

Municipal Surveyor

Local Government Unit
08.2003 - 02.2006

Certificate - Excellence Award

Australia Pacific LNG Project

Certificate - Digital Geographic Positioning Systems

Philippine Ports Authority Training Center

Certificate - 18th Annual Regional Convention

Geodetic Engineers of the Philippines Inc.

Bachelor of Science - Geodetic Engineering

University of Northern Philippines

Associate - Geodetic Engineering

University of Northern Philippines

Bachelor of Science - Civil Engineering (Undergraduate)

Saint Louis University
MAURINO ISAGANI TUSCANO JR