Build facilities from the ground up
- Maintained tools and equipment in good working condition for optimal performance.
- Communicated with supervisors regarding project progress and material needs.
- Measured distances accurately using tape measures or laser measuring devices.
- Installed formwork for concrete structures according to specifications.
Poured concrete for residential driveways to create durable surfaces.
- Assisted in measuring and cutting rebar for reinforcements.
- Collaborated with team members to complete tasks efficiently.
- Followed project plans to deliver quality concrete structures.
- Positioned wire mesh and rebar to reinforce concrete.
- Use shovels, hoes, rakes, and other tools to spread or level concrete.
- Loaded and unloaded necessary tools, materials, and machines from trucks and trailers.
- Smooth out freshly poured concrete with trowels and other finishing tools.
- Prepare and pour foundations for structures.
- Maintain equipment used during construction process in good working condition.
- Dismantled forms using basic and advanced tools.
- Placed steel pins using sledgehammer.
- Cut expansion joints into newly laid concrete.
- Set concrete forms to desired pitch and depth and aligned.
- Shaped rounded edges on corners with edger tool and created grooves to control cracking.
- Produced rough concrete surface using brooms.
- Installed anchor bolts, steel plates and other fixtures in freshly poured concrete.
- Applied hardening and sealing compounds to cure concrete surface.