Summary
Overview
Work History
Education
Skills
Additional Information
Timeline
Generic

Micah Papas

Melbourne,VIC

Summary

Accomplished Formworker and Concrete labourer at I & D, adept in ground works and formwork construction with a proven track record of enhancing project efficiency and safety. Excelled in leadership roles, fostering team collaboration and effective communication, while optimizing material usage to reduce waste. Demonstrated proficiency in concrete placement crew and reinforcement installation, ensuring high-quality outcomes.

Overview

12
12
years of professional experience

Work History

Formworker / Concreter

I & D
07.2011 - 02.2023
  • Leading hand and foreman roles for the last 4 years while working at I and D group
  • General deck formwork and built walls
  • Set laser for slabs and jumped in concrete twice per week
  • Ensured accurate measurements for formwork installation by utilizing advanced tools such as laser levels and measuring tapes during the preparation phase.
  • Set out for ground works, reading plans and marking pads for excavations


  • Collaborated with project managers and foreman to ensure seamless communication between workers, resulting in improved overall performance.
  • Improved durability of finished structures by ensuring proper concrete placement, curing techniques, and reinforcement methods were utilized consistently.
  • Maintained safe work environments by implementing and enforcing strict safety protocols during concrete and formwork operations. (following SWMS)
  • Demonstrated adaptability to various project types, inc commercial involving concrete work, reo and formwork.
  • Gained proficiency in operating a variety of concrete equipment such as mag, vibrators, screeds, trowel among others for optimal productivity on job sites.
  • Reduced waste on job sites by optimizing material usage while maintaining quality standards in construction projects. (re using ply and timbers, shorter lengths that have been cut)
  • Measured precise amounts of concrete and verified levelness to improve quality of finished product.
  • Cut, chipped, or sawed concrete to create desired shapes. eg pockets cutting chipping jack hammering)
  • Take offs for pours, to ensure no waste when measuring concrete
  • in communication with concrete dispatcher about times, trucks and specific concrete requirements, strengths (mpa) durations for pour

Education

No Degree - Carpentry Certificate 3

Boxhill Tafe
12.2013

Skills

  • Ground works set out and formwork
  • Deck formwork
  • Concrete Placing
  • Formwork construction of walls
  • Reinforcement installation
  • Setting laser and RLs
  • Set up spoon drains
  • Ordering concrete
  • Working through the pre pour checklist
  • Marking/ Drilling starter bars for panels
  • Reading ground work plans and panel plans
  • Slab pouring
  • Managing multiple men, concreters and pumpies for pour days
  • Worksite safety
  • Time Management
  • Attention to Detail
  • Multitasking
  • Team Collaboration
  • Active Listening
  • Effective Communication

Additional Information

Reference - Nick Beck - Operations manager I&D - 0419099749

Timeline

Formworker / Concreter

I & D
07.2011 - 02.2023

No Degree - Carpentry Certificate 3

Boxhill Tafe
Micah Papas