Summary
Overview
Work History
Education
Skills
Interests
Timeline
Generic

MICHAEL SEAZARH

Woy Woy,NSW

Summary

I am a diligent and results-oriented Production & Industrial Engineer with a strong ability to apply theoretical knowledge to real-world challenges. Passionate about optimising processes, improving efficiency, and implementing innovative solutions to drive meaningful results. Known for creativity, adaptability, and a collaborative mindset, I excel in problem-solving and continuous improvement initiatives. Proficient in Full-Stark development, process optimisation, and lean manufacturing principles. Skilled in using MS Office applications, CAD and AutoCAD software, and simulation tools to support production planning and operational efficiency. Adept at working in team environments while also independently handling tasks to ensure timely and effective outcomes.

Overview

6
6
years of professional experience

Work History

Solar System Engineer

Seazuron Technologies
12.2023 - Current


  • Installed and maintained photovoltaic (PV) panels, controllers, inverters, and batteries to ensure optimal performance and system longevity.
  • Diagnosed and resolved technical issues through root cause analysis and effective problem-solving techniques, ensuring minimal downtime.
  • Provided knowledgeable support and high-quality service, escalating complex issues when necessary to ensure timely resolution.
  • Managed multiple projects simultaneously, meeting strict deadlines while maintaining high-quality standards.
  • Implemented proactive monitoring and maintenance strategies to enhance system efficiency and reliability.
  • Oversaw and optimised installed systems to ensure maximum availability and operational performance.

Trainee Engineer

Alphamead Facility Management
08.2021 - 02.2022
  • Assisted the Head of Department (HOD), Central Operations in collating and analysing data to support strategic decision-making.
  • Anchored meetings among supervisors, managers, and directors, ensuring effective communication and coordination across departments.
  • Managed a residential facility, overseeing operations, resource allocation, and process improvements to enhance efficiency.
  • Identified areas for improvement in existing workflows and collaborated with team members to develop and implement optimised solutions.
  • Designed and developed a full-stack platform that enabled customers to submit requests via front end, thereby streamlined requests' management processes and improved efficiency. This initiative was commended by the HOD, Central Operations for the impact on operational performance.
  • Developed a strong understanding of AutoCAD software to design, analyse, and test engineering projects, ensuring precision and efficiency in production planning.
  • Applied Lean Manufacturing and Six Sigma principles to identify inefficiencies and propose cost-effective solutions.
  • Assisted in process optimisation and workflow enhancements to improve production efficiency and reduce waste.
  • Utilised data analysis and performance metrics to support continuous improvement initiatives in industrial operations.
  • Assisted with preparation of client presentations using AutoCAD and Microsoft Office.
  • Collaborated with senior engineers on complex projects.

Engineering Intern

SteveLyn Auto Services Ltd
09.2019 - 12.2019
  • Gained hands-on experience in various engineering tools, software, and techniques to contribute effectively to multiple projects.
  • Conducted thorough material testing to ensure project specifications were met, leading to consistently high-quality outputs.
  • Reduced project costs with meticulous component selection and supplier negotiations.
  • Assisted engineers with inspections of finished automobile construction.

Printing Press Operator

Noble Printing Press
02.2019 - 07.2019
  • Examined job orders to determine quantity, stock specifications, colours and special printing instructions.
  • Set up and operated printing press machines.
  • Demonstrated strong problem-solving abilities, quickly identifying and resolving issues that arose during production runs.
  • Adjusted controls to regulate flow of ink and dampening solution to plate cylinder.
  • Improved colour consistency across print runs by conducting thorough quality control checks.
  • Enhanced printing efficiency by performing regular maintenance and troubleshooting on printing press equipment.
  • Reviewed completed orders for quality and accuracy.
  • Analysed daily density readings from each printer to detect potential quality issues.

Education

Bachelor of Science - Industrial And Production Engineering

University of Ibadan
Ibadan Nigeria
08-2023

Skills

  • Production Planning and Control
  • Failure Mode and Effects Analysis (FMEA)
  • Machining and Fabrication
  • Workflow Optimisation & Streamlining
  • Computer-Aided Design (CAD) & AutoCAD Proficiency
  • ISO Standards Compliance and Quality Assurance
  • Process Automation and Continuous Improvement
  • Technical Drawings, Sketches and Specifications
  • Safety Compliance and Risk Mitigation
  • Lean Manufacturing and Process Efficiency
  • Strong Attention to Detail and Analytical Thinking

Interests

  • Tech enthusiast, passionate about exploring the latest advancements and innovations
  • Enjoy participating in [activity] for overall physical and mental well-being

Timeline

Solar System Engineer

Seazuron Technologies
12.2023 - Current

Trainee Engineer

Alphamead Facility Management
08.2021 - 02.2022

Engineering Intern

SteveLyn Auto Services Ltd
09.2019 - 12.2019

Printing Press Operator

Noble Printing Press
02.2019 - 07.2019

Bachelor of Science - Industrial And Production Engineering

University of Ibadan
MICHAEL SEAZARH