Professional tradesperson prepared for demanding boilermaking roles, bringing hands-on experience in fabricating, assembling, and repairing structural steels and pipework.
Known for safety compliance and efficient work practices, with commitment to quality and reliability. Proven ability to collaborate with team members and adapt to evolving project needs, valued for technical skills and dependable work ethic.
Overview
32
32
years of professional experience
1
1
Certification
Work History
Boilermaker
UGL
01.2022 - Current
Repairs to major processing and large equipment for eg tanks, pipework, building structures, walkways and handrails, conveyors, reclaimers, coal stackers and general fabrication and welding
Major shutdown works and weekly down day maintenance activities
Large equipment demolition and installations
Fabrication of structural steel components in workshop and installations in plant
Change out of large coal shaker screens, structure and weld repairs
Welding of structural steel and pipes using Gas metal arc welding (flux core) and manual metal arc welding (stick)
Refinery Operator Digestion
Rio Tinto
01.2013 - 01.2022
Executing daily shift duties and equipment performance checks / routines in-line with shift instructions, managing shifts by shift breakdowns, providing solutions and work-arounds to safely maintain production, conducting fault-finding and minor maintenance tasks
Issuing Permit to Work (PTW) for high-risk activities including hot work, gas testing, confined space entry and working at heights, assisting with the safe preparation and return-to-service of plant in-line with site PTW and LOTO systems and procedures, and developing and executing procedures and scopes for large and complex shutdown isolations
Completing risk assessment such as JHA’s to identify and control potential risks and dangers to people, the equipment and the environment, reporting and actioning any hazards or near misses, holding meaningful safety interactions, and leading by example regarding overall compliance with HSE policies and procedures (and same for all roles below)
Working closely with maintenance teams to advise on abnormal performance or potential equipment failures, and with central control room operators regarding monitoring and control of process parameters, start-up or stopping of field equipment, and emergency response procedures
Providing on-the-job training and mentoring for less-experienced Operators regarding the monitoring and optimisation of plant and equipment, as well as job hazard identification, critical risk management, and the use of risk assessment tools
Developing and optimising Standard Operating Procedures (SOP’s) and Safe Work Method Statements (SWMS’s) to ensure concise work instructions for safe operations across my area of the refinery
Identifying critical tasks, planning accordingly, tackling prioritised items first, making confident decisions, and moving forward with a tenacious attitude focused on best results for the business
Team Leader Clarification
01.2011 - 01.2012
Planned, coordinated and led the safe and efficient execution of process tie-ins in the clarification area as part of the $2.5 B Yarwun 2 expansion project
Assisted with design studies for plant upgrades, facilitated the development of operational readiness plans and Standard Operating Procedures for the new facilities
Mentored and supervised team of operators in the commissioning and / or decommissioning continuous processing plant and equipment
Facilitated tool box meetings and assigned daily tasks to team members monitoring performance and KPI’s
Provided on-the-job training and mentoring for Operators regarding the monitoring and optimization of plant and equipment, as well as job hazard identification, critical risk management, and the use of risk assessment tools
Shift Team Leader
Rio Tinto
01.2007 - 01.2011
Team of 6 Production technicians, provided technical and procedural training and mentoring, provided clear directions, set challenging goals, monitored performance, set KPI’s and developed team charter and operating budgets
Developed the Team Operating plan through my development within Frontline Management Diploma
Ensured effective completion of daily operating tasks meeting organisation and internal customer goals
Tie In Coordinator
Alcan
01.2004 - 01.2007
Planning, coordination and assisting with the safe and efficient execution of 900 Brownfield process tie ins, as well as the installation, commissioning and decommissioning of major continuous processing plant and equipment including 600tonne ball mills, conveyor feed systems, pressure filters, high-rate decanters, and high temperature pressure vessels digestors, flash tanks
Training and mentoring of team members in plant commissioning procedures and managing on-site contractors to ensure they delivered their contracted scope of works safely and to site standard
Planning and coordination of equipment downtown and isolations and applying permit to work systems to allow the safe and successful execution of complex brownfield and greenfield process tie ins and works
Refinery Operator Maintainer, Tie in coordinator
Nabalco
01.1997 - 01.2007
Executing daily shift duties and equipment performance checks / routines in-line with shift instructions, managing shifts by shift breakdowns, providing solutions and work-arounds to safely maintain production, conducting fault-finding and minor maintenance tasks
Issuing Permit to Work (PTW) for high-risk activities including hot work, gas testing, confined space entry and working at heights, assisting with the safe preparation and return-to-service of plant in-line with site PTW and LOTO systems and procedures, and developing and executing procedures and scopes for large and complex shutdown isolations
Completing risk assessment such as JHA’s to identify and control potential risks and dangers to people, the equipment and the environment, reporting and actioning any hazards or near misses, holding meaningful safety interactions, and leading by example regarding overall compliance with HSE policies and procedures (and same for all roles below)
Working closely with maintenance teams to advise on abnormal performance or potential equipment failures, and with central control room operators regarding monitoring and control of process parameters, start-up or stopping of field equipment, and emergency response procedures
Providing on-the-job training and mentoring for less-experienced Operators regarding the monitoring and optimisation of plant and equipment, as well as job hazard identification, critical risk management, and the use of risk assessment tools
Developing and optimising Standard Operating Procedures (SOP’s) and Safe Work Method Statements (SWMS’s) to ensure concise work instructions for safe operations across my area of the refinery
Identifying critical tasks, planning accordingly, tackling prioritised items first, making confident decisions, and moving forward with a tenacious attitude focused on best results for the business
Boilermaker
Transfield Services
01.1997 - 12.1997
Structural Steel Fabrication
Large Settling tank repairs and re-roofing
Large- and small-scale pressure pipe fabrication and welding
Repairs to boilers during major shutdown overhauls
Rotary and vertical Kiln repairs
Repairs to crushing and conveyor systems
Repairs to digestors, flash tanks and 4 pass heat exchangers
Ship Loader repairs and fabrication
Repairs to Tugboats and large ships
Ball and Rod Mill repairs and installations
Heat exchanger repairs and retubing
Major maintenance tasks, ie fitting of pipework and structural steel sections and repairs to wharf facilities and structures
Boilermaker Fabricator
United Construction
01.1997 - 10.1997
Structural crew in the workshop
Fabrication of Port Headland Briquet Project structural steel components using complex engineered drawings
Attention to detail was key and working within strict tolerances and time lines
Some of the works performed;
Fabricate Large and small support beam sections
Large structural frames for vessels
Fabrication of stair stringers and handrails for stairs and walkways
Fabricate Conveyor galleries
Pipework fabrication using isometric drawings
Sub Contract Boilermaker
Transfield
01.1996 - 01.1997
I performed fabrication and welding duties for the installation of major cooling beds for the refinery and an upgrade of a bomb proof shelter for the smelter and Furnace area
My main duties on site were welding structural steel sections supporting the cooling beds installation both on day shift and night shift rotations
End of the contract lead to an upgrade of furnace area bomb proof frame in glass on the pot crane
Apprentice Boilermaker
United Construction & Transfield Services
01.1993 - 01.1996
Structural Steel Fabrication
Large Settling tank repairs and re-roofing
Large- and small-scale pressure pipe fabrication and welding
Repairs to boilers during major shutdown overhauls
Rotary and vertical Kiln repairs
Repairs to crushing and conveyor systems
Repairs to digestors, flash tanks and 4 pass heat exchangers
Ship Loader repairs and fabrication
Repairs to Tugboats and large ships
Ball and Rod Mill repairs and installations
Heat exchanger repairs and retubing
Major maintenance tasks, ie fitting of pipework and structural steel sections and repairs to wharf facilities and structures
The work in Gove with United Construction and Transfield services required site-based workshop and site works as an apprentice Boilermaker
During my time with both companies, I learnt all skills required to successfully complete my apprenticeship 6 months early due to the nature of the work and skills I was required to learn and execute