Experienced Engineer with a strong background in construction program planning and on-site construction management in residential and mixed-use projects. Proficient in Microsoft suite, Aconex, AutoCAD and Bluebeam, with expertise in facade, internal fitting out, and landscaping. Adept at negotiating contracts with subcontractors and stakeholders to meet quality, safety, and time requirements. Excellent time management, commercial knowledge, attention to detail, and organizational skills with a life-long learning attitude.
Bradfield station- Project Value:&416,000,000.00
• Completed below-ground structural waterproofing three months ahead of baseline, overseeing design, programming, and onsite coordination.
• Lead FRP works for the central and south stations.
• Lead the structural steel package.
• Manage all lifts and escalators related
• Lead service design and coordination at the site level.
• Contributed to blockwork procurement and baseline program development.
• Coordinate temporary works.
Wentworth point- Project Value &121,000,000.00
Achievements:
"Exceeds"for "all" probationary review assessments rating and has been offered a plan to becoming a PE.
1. lead the team and re-set up facade working sequence.
2. lead the team catching up facade progress and meet quality standard, which fell behind the programming dramatically before I started the role.
2. Help team solve water pressure issue and success window water test with clients two times. ( Help project save $300,000 front sub-sill angle cost)
3. Use 135 ft boom lift instead of building scaffold. (Help Project reduce cost from $150,000 to around $20,000)
4. Take over 4 towers facade work include scaffold and jump screen coordination from one project engineer, one cadet and two structural foremen.
5. Take over weather proofing consultant- Ironbridge from design team.
6. When structural stripping delay help team 4 days finished 10 days sequence facade work.
7. Involve landscaping procurement and design with design team and SPE.
8. Against Australian standard save around $ 1500,000 for roof flashing ( Waterproofing requirement)
9. Take over all service commissioning and coordination from a Service PE after he resign.
Project: 88 BY JQZ- Christie St, Sydney, NSW ( Project Value: 1.3 billion, project feature: luxury apartments )
Achievements:
03/2016-07/2016 Practice in CAD
06/2015-07/2015 Road project practice in Maoershan, Harbin, China
05/2013-06/2013 Survey practice in university campus