Professional Summary
Overview
Work History
Education
Skills
References
Certification
Timeline

Mitchell Botica

Superior Walls and Ceilings
Gold Coast,QLD
12
years of professional experience
1
Certification

Hi my name is a Mitchell Botica I have been in the construction business 10+ years and am looking to relocate and choose a new career pathway.

I have worked on commercial high rises as a plaster and carpenter for the past 10+ years, i also have a large knowledge and experience in Steele company and crane operations.

Work History

P L A S T E R I N G ( W A L L S A N D C E I L I N S G )

5 Months
Superior Walls and Ceilings | 07.2024 - 12.2024
  • Maintained cleanliness on the job site by properly disposing off waste materials generated from repair works
  • Exhibited proficiency in repairing cracks, holes, and other imperfections on surfaces using a variety of patching materials
  • Demonstrated ability to set up and operate plastering machines for efficient production of high-quality plaster products
  • Demonstrated capability in preparing surfaces by removing old wall coverings, cleaning surfaces to remove dust and debris
  • Adept at cutting insulation boards into desired sizes prior to installation
  • Continuously monitored progress of each project against established timelines and budgets to avoid delays and cost overruns
  • Successfully completed all assigned jobs within specified deadlines without compromising on quality standards
  • Effectively worked with ladders and scaffolding for reaching hard-to-reach areas while performing tasks related to ceiling installations
  • Assisted co-workers in carrying heavy equipment's like sanders or grinders during installation process
  • Developed expertise in mixing, applying, and smoothing different types of plasters to walls and ceilings
  • Accurately measured the dimensions of the area requiring application of plaster material to ensure proper coverage
  • Performed periodic maintenance checks on tools and equipment used for plastering activities to ensure their optimum performance
  • Provided assistance in other construction activities like laying out floors and installing tiles when needed
  • Ensured compliance with safety regulations while handling hazardous substances during the course of job duties
  • Set up scaffolds.

Plasterer

1 Year 11 Months
Qline | 08.2022 - 07.2024
  • Contributed to a safe work environment by adhering to safety protocols and maintaining clean job sites.
  • Enhanced building stability by applying layers of plaster to interior and exterior walls, ceilings, and partitions.
  • Protected surfaces surrounding work areas such as windows, doors, or sidewalks.
  • Performed adeptly in challenging environments, including high ceilings and tight spaces, to deliver top-quality results.
  • Completed installations of building structures, trim, flooring, and cabinetry.
  • Demonstrated versatility in carpentry techniques, working proficiently with both hand tools and power tools to achieve desired results.
  • Demonstrated close attention to detail to verify quality and accuracy of work.
  • Read and interpreted blueprints to follow specifications of projects.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Contributed to successful completion of residential and commercial projects by skillfully installing cabinetry, doors, windows, and flooring materials.
  • Measured materials to determine sizes and quantity required for construction project.
  • Optimized workspace organization by maintaining a clean, safe, and efficient work environment throughout each project''s duration.
  • Cut, shaped and installed siding, roofing and framing to protect interior of properties from harsh weather conditions.
  • Collaborated with other skilled tradespeople to ensure seamless integration of carpentry work within larger construction projects.
  • Mentored junior team members to improve their technical skills and enhance overall team performance in completing various carpentry tasks.
  • Developed strong relationships with suppliers to secure competitive pricing on materials, helping manage project costs effectively.

Plasterer

2 Years 7 Months
Superior Walls and Ceilings | 01.2020 - 08.2022
  • Enhanced building stability by applying layers of plaster to interior and exterior walls, ceilings, and partitions.
  • Contributed to a safe work environment by adhering to safety protocols and maintaining clean job sites.
  • Protected surfaces surrounding work areas such as windows, doors, or sidewalks.
  • Performed adeptly in challenging environments, including high ceilings and tight spaces, to deliver top-quality results.
  • Maintained consistency in texture and color throughout projects using proper mixing techniques and careful application practices.
  • Fostered client loyalty by providing thorough and competitive estimates for desired work.
  • Executed or delegated tasks such as mixing mortar and plaster to required consistency.
  • Improved customer satisfaction by delivering high-quality results through precise application techniques and attention to detail.
  • Maintained knowledge of industry materials, tools and equipment.
  • Prepared and mixed paste, cement and mortar for projects.
  • Trained and mentored a number team members over course of employment.
  • Supported apprentices in developing their skills as Plasterers through hands-on training and mentorship during projects.
  • Installed guide wires on exterior surfaces to indicate thickness of plaster to be applied.

Your Job Position Here

2 Years
Cree8 | 01.2018 - 01.2020
  • Maintained cleanliness on the job site by properly disposing off waste materials generated from repair works
  • Exhibited proficiency in repairing cracks, holes, and other imperfections on surfaces using a variety of patching materials
  • Demonstrated ability to set up and operate plastering machines for efficient production of high-quality plaster products
  • Demonstrated capability in preparing surfaces by removing old wall coverings, cleaning surfaces to remove dust and debris
  • Adept at cutting insulation boards into desired sizes prior to installation
  • Continuously monitored progress of each project against established timelines and budgets to avoid delays and cost overruns
  • Successfully completed all assigned jobs within specified deadlines without compromising on quality standards
  • Effectively worked with ladders and scaffolding for reaching hard-to-reach areas while performing tasks related to ceiling installations
  • Assisted co-workers in carrying heavy equipment's like sanders or grinders during installation process
  • Developed expertise in mixing, applying, and smoothing different types of plasters to walls and ceilings
  • Accurately measured the dimensions of the area requiring application of plaster material to ensure proper coverage
  • Performed periodic maintenance checks on tools and equipment used for plastering activities to ensure their optimum performance
  • Provided assistance in other construction activities like laying out floors and installing tiles when needed
  • Ensured compliance with safety regulations while handling hazardous substances during the course of job duties
  • Set up scaffolds.

Factory Worker

4 Years 11 Months
Neuman Steele | 01.2013 - 12.2017
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Maintained clean and organized workspaces, contributing to overall productivity and a safe working environment.
  • Followed safety guidelines to fasten structural steel members and hoisted cables, chains and rope.
  • Reduced workplace accidents through strict adherence to safety protocols and conducting regular safety training sessions.
  • Provided guidance to junior team members, fostering an atmosphere of teamwork and professional growth within the steel working department.
  • Inspected completed steel structures for alignment and compliance.
  • Transported heavy steel components from ground level to elevated structures.
  • Aligned and leveled each steel component into place before bolting and welding parts into fixed positions.
  • Adhered to all relevant industry codes when executing tasks related to cutting, shaping, assembling, or joining steel components.
  • Participated in cross-functional teams for large-scale projects, leveraging individual skills and expertise to achieve successful outcomes.
  • Examined and installed metal components according to customer specifications.
  • Unloaded and positioned prefabricated steel and heavy equipment using hoisting equipment, such as cables, pulleys, or hooks.
  • Coordinated with other departments within the organization to ensure smooth workflow between design, manufacturing, and delivery stages.
  • Calculated appropriate size and weight distribution to safely manage load.
  • Performed daily safety checks to achieve safe operating condition of equipment.
  • Excelled under pressure by safely executing demanding lifts in challenging weather conditions and tight spaces.
  • Operated large cranes to lift and move materials with precision and accuracy.
  • Used hand signals, verbal communication and radio to reduce risks in coordinating crane movements.
  • Operated mobile crane and moved materials to various locations to meet job schedule demands.
  • Positioned cranes in response to hand signals and observed load hookup to determine safe load capacities.

Education

Certificate III - Walls And Ceilings (plastering)

Department of Employment Small Business And Training | Southport, QLD | 10.2020

Certificate Of Completion

Skills

Steel framing installation
Firewall management
Setting
Loading out each level for Steele frame
plaster board and plaster compound.
Lead installation
Reading of plans
Crane operator
Friendly
positive attitude
Problem-solving
Time management
Attention to detail
Flexible and adaptable
Dependable and responsible
Multitasking Abilities
Excellent communication
Critical thinking

References

  • Jai Flood, 0423 866 278 Project Manager Forman Superior Walls And Ceilings
  • Mark Neuman 0412 989 546 Director Newman Steele

Certification

White card

Timeline

P L A S T E R I N G ( W A L L S A N D C E I L I N S G )

Superior Walls and Ceilings
07.2024 - 12.2024Read More

Plasterer

Qline
08.2022 - 07.2024Read More

Plasterer

Superior Walls and Ceilings
01.2020 - 08.2022Read More

Your Job Position Here

Cree8
01.2018 - 01.2020Read More

Factory Worker

Neuman Steele
01.2013 - 12.2017Read More

Department of Employment Small Business And Training

Certificate III from Walls And Ceilings (plastering)
Read More
Mitchell Botica