Mining Fixed plant fitter and installer
Civil/mining multi skilled operator surface/underground
Seasoned civil/mining concreter & formworker
knowledgeable about civil/mining operations and offering top-notch project management, team leadership and problem-solving abilities. Ingenious in maximizing resources to meet challenging demands. Analytical leader with excellent multitasking abilities with the ability to step in and jump on the tools when in times of need
Sub contractor running under my business partnership Adams family contractors doing small projects currently on the off swing fifo
Contracts previous and current
#Civil Site supervisor for duratec pty ltd for the Rawdon Island Bridge repair wauchope
Contract from 1st may 2022 to 16th December 2022 for bridge completion
Role: hands on site supervisor for bridge repair inclusive of piles repairs / blade wall thickenings/C.P. installation/ bridge deck repairs/pile cap resign top (nitro motar 903)
#Contract works with CONNEX GROUP (syndey based company) civil
For regional work doing multiple machine curb and gutter work footpaths, laybacks driveways in areas such as Condobolin, broken hill, parkes, orange fifo / dido December 2021 to June 2022
#A lot of Other private jobs completed throughout local area of Port macquarie region include pool areas, fencing contracts, concrete slabs
employed as the leading hand civil concreter/ formworker. Sites completed south west rocks stage 3 sub division, Clearwater crescent PMQ main water valve pits construction, multiple enquip bridge decks, multiple covert bases from single cell to triple cell coverts, curb and gutter, lintels, pram ramps, footpath, driveways
Request for further details
PAST PROJECTS INCLUDE
Port Macquarie highway bypass (Lend Lease contract). DUTIES included mainline paving both single and dual lane, Shoulder paving s/o paving, hand pours, bridge approaches, form work , steel fixing Macksville highway bypass (pacifico contract) .. s/o paving , hand pours, form work ,steel fixing New m4 tunnel project Sydney (CPB contract).. Hand pours , mainline paving , formwork, pits, no fines pouring . Wall paving , steel fixing new m5 tunnel Sydney (CPB contract) Main line paving consisted of 12kms of concrete main line has been placed .. finisher and operator
Last project M2 north connex project (lend lease contract) .. Operated barrier wall machine and finished wall. All positions my job role was as a concrete finisher and operator of machines including the paving gommaco single lane concrete base/sub base paver and wall barrier paver
Finishing roles as standard screeding, wood float, troweling, bull floating, raking and curing .. plus all hand pour roles vibrating etc