Summary
Overview
Work History
Skills
Certification
Timeline
Generic

MITCHELL STENNER

Dapto,NSW

Summary

Experienced Crane Operator, Rigger, Dogman with 15 years in construction industry. Known for prioritizing safety and efficiency to meet deadlines. Expertise in Tower Cranes & Mobile Crane operations, erection/dismantles, and Dual crane lifts. Specializes in erecting Concrete tilt-up panels, Steel erection, Crane assembly, and managing building materials on construction sites. Effective communication drives project success and safety standards.

Overview

18
18
years of professional experience
1
1
Certification

Work History

Tower Crane Operator

Strictly Cranes
05.2022 - Current
  • Responded quickly to hand signals and radio commands to maintain safety on job sites.
  • Operated RAIMONDI- MRT152, MRT159, MRT189, MRT501.
  • Erect/Install Concrete Panels.
  • Operated large cranes to lift and move materials with precision and accuracy.
  • Used troubleshooting and resolution skills to address crane-related malfunctions while minimizing downtime.
  • Controlled cranes from remote control panel for safe and accurate operation.
  • Utilized mastery of diverse slings, shackles and spreader bars to meet specific project needs.
  • Leveraged expertise in load-lifting attachments and rigging techniques to manage diverse loads.
  • Inspected, cleaned, and performed operator level maintenance on equipment in accordance with standards.
  • Performed daily safety checks to achieve safe operating condition of equipment.
  • Experienced in inspecting cranes and related equipment for safety and operational defects.

Crane Operator - Rigger

Blayney Cranes
10.2018 - 04.2022
  • Operated various cranes including Grove GMK6220, GMK5130, GMK4100, GMK4080, Terax AT20, and Tidd-PC25.
  • Cadia Mine Shutdown Work (M2P Work)
  • Developed and maintained courteous and effective working relationships.
  • Operated Slew cranes/Franna's to lift and move materials with precision and accuracy.
  • Secured safety equipment and always used gear according to requirements.
  • Rigged for heavy lifts according to blueprint requirements.

Intermediate Rigger

Sarens
02.2017 - 09.2018
  • Installation of Various Mechanical and Electrical parts, Transformer, Control Room, Converter.
  • GE Renewable energy General Electric Installation 3.43 – 130.
  • Turbine Tube Section Installation 110m and Rotor Blade Diameter 130m.
  • Communicated with operators to accomplish smooth and efficient transports.
  • Rigged for heavy lifts according to blueprint requirements.
  • Worked at heights without difficulty.
  • Determined correct rigging requirements for equipment based on job specifications and environmental conditions.
  • Mobilized and tore down rigs according to safety regulations.
  • Assembled and installed rigging and lifting equipment to support lifting operations.
  • Excellent communication skills, both verbal and written.
  • Secured safety equipment and always used gear according to requirements.
  • 4/2 FIFO Roster

Rigger

CLOUGH DOWNER JOINT VENTURE - INLINE GAS PROJECT
01.2013 - 07.2014
  • Dogging Various Machinery, FAUN 220T, DEMAG 200T, 80T, KATO 70T
  • HUB 4 Gas Compressor Station
  • Set Up Cranes – Dual Crane Lifts
  • Secured safety equipment and always used gear according to requirements.
  • Prepared steel components for assembled bent sections and connectors.
  • Assembled and installed rigging and lifting equipment to support lifting operations.
  • Worked at heights and in confined spaces without difficulty.
  • Determined correct rigging requirements for equipment based on job specifications and environmental conditions.
  • Rigged for heavy lifts according to blueprint requirements.
  • Prepared and erected steel, torque and bolt-up connections.
  • Mobilized and tore down rigs according to safety regulations.
  • Communicated with operators to accomplish smooth and efficient transports.
  • Provided professional services and support in a dynamic work environment.
  • 3/1 FIFO Roster

Rigger - Dogman

Universal Cranes
11.2015 - 02.2017
  • General Hire/ Maintenance/Shut Down Work
  • Erect Precast Tilt-Up Panels
  • Steel Erection
  • Dogging Various (Slew Cranes), GROVE 130T, 100T, 80T 55T, DEMAG AC100, AC80, AC55 - (Non-Slew Cranes), AT20, AT40, Mac25, TIDD-PC25
  • Secured safety equipment and always used gear according to requirements.
  • Rigged for heavy lifts according to blueprint requirements.
  • Assembled and installed rigging and lifting equipment to support lifting operations.
  • Skilled at working independently and collaboratively in a team environment.
  • Self-motivated, with a strong sense of personal responsibility.
  • Managed time efficiently in order to complete all tasks within deadlines.

Rigger - Dogman

CKJV – GORGON PROJECT
08.2014 - 10.2015
  • Dogging Various Machinery LIEBHERR 250T, 160T, 130T, 90T, KOBELCO CRAWLER 250T
  • Participated in team projects, demonstrating an ability to work collaboratively and effectively.
  • Developed and maintained courteous and effective working relationships.
  • Excellent communication skills, both verbal and written.
  • Identified issues, analyzed information and provided solutions to problems.
  • Worked well in a team setting, providing support and guidance.
  • Demonstrated respect, friendliness and willingness to help wherever needed.
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Paid attention to detail while completing assignments.
  • Proven ability to learn quickly and adapt to new situations.
  • 26/9 – 23/10 Roster FIFO

Intermediate Rigger

RCR RESOURCES
07.2011 - 12.2012
  • CADIA EAST UNDERGROUND CONSTRUCTION PROJECT
  • Underground conveyor crusher installation.
  • Constructions of gantries.
  • Dogging hydraulic cranes, 26T, 55T, 80T, as well as 275T & 160T crawler cranes.
  • Steel erection Up to 90T.
  • Assembled and installed rigging and lifting equipment to support lifting operations.
  • Secured safety equipment and always used gear according to requirements.
  • Determined correct rigging requirements for equipment based on job specifications and environmental conditions.
  • Worked effectively in fast-paced environments.

Dogman - Rigger

Titan Cranes
08.2007 - 06.2011
  • Erect and Dismantle Alimak and GJJ Man Material Hoists
  • Tower Crane Erection and Dismantle
  • Dual Crane Lifts.
  • Dogging Hammerhead/Luffing JASO Tower Cranes.
  • Erect Concrete Tilt Up Panels and Other Various Building Materials.
  • Tier 1 Building Sites.
  • Demonstrated creativity and resourcefulness through the development of innovative solutions.
  • Identified issues, analyzed information and provided solutions to problems.
  • Developed strong communication and organizational skills through working on group projects.
  • Developed and maintained courteous and effective working relationships.

Skills

  • Crane operation expertise
  • Tower cranes / mobile cranes / telescopic cranes / crawler cranes / hydraulic cranes
  • Renewable Energy
  • Safety Protocol Adherence
  • Preventive Maintenance
  • Construction
  • Safety Compliance
  • Load Planning
  • Attention To Detail
  • Problem Solving
  • Vehicle Assessment
  • Pre-operational Equipment Inspection
  • Piping Installation
  • Coordinating Installations And Repairs
  • Controlling Heavy Equipment Movement
  • Crane And Hoist Operation
  • Dismantling Machinery
  • Aligning Equipment
  • Rigging-object Attachment
  • Attention to detail
  • Excellent communication
  • Leadership
  • Organization and time management
  • Flexible and adaptable
  • Collaboration
  • Active listening
  • Data Management
  • Team Management
  • Testing Mechanical Systems
  • Selecting Equipment
  • Cultural awareness
  • Self-Directed
  • Preventive And Reparative Maintenance
  • Accurate communication
  • Crane assembly
  • Crane maintenance
  • Rigging
  • Hoisting equipment
  • Worksite safety
  • Heavy equipment operation
  • Rigging preparation
  • Materials movement
  • Equipment moving
  • Precision lifting
  • Safety practices
  • Strong decision-making
  • Weather condition awareness
  • Continuous learning attitude
  • Heavy lifting techniques
  • Detail-oriented approach
  • Blueprint reading
  • Problem-solving capacity
  • Crane assembly and disassembly
  • Accurate load calculation
  • Safety protocol compliance
  • Load chart proficiency
  • Maintenance and repairs
  • Mobile crane operations
  • Heavy lift management
  • Load chart interpretation
  • Heavy lifting
  • Hazard identification
  • Crane safety procedures
  • Load control
  • Sling selection
  • Boom angle determination
  • Equipment maintenance
  • Equipment Repair
  • Crane inspection
  • Crane capacity
  • Teamwork
  • Teamwork and collaboration
  • Problem-solving
  • Organizational skills
  • Self motivation
  • Interpersonal skills

Certification

  • Heavy Combination Licence (15828076)
  • National High Risk Work Licence (HRW315147) Open Crane Ticket (CO)
  • Intermediate Rigger (RI) Basic Rigger (RB) Dogman (DG) Tower Crane (CT) Elevated Work Platform (WP) Forklift (LF)
  • OH&S Construction Induction Training Certificate (CGI01111481SEQ1)

Timeline

Tower Crane Operator

Strictly Cranes
05.2022 - Current

Crane Operator - Rigger

Blayney Cranes
10.2018 - 04.2022

Intermediate Rigger

Sarens
02.2017 - 09.2018

Rigger - Dogman

Universal Cranes
11.2015 - 02.2017

Rigger - Dogman

CKJV – GORGON PROJECT
08.2014 - 10.2015

Rigger

CLOUGH DOWNER JOINT VENTURE - INLINE GAS PROJECT
01.2013 - 07.2014

Intermediate Rigger

RCR RESOURCES
07.2011 - 12.2012

Dogman - Rigger

Titan Cranes
08.2007 - 06.2011
MITCHELL STENNER