I have been working all across the territory carrying out major scaffolding projects for over 6 years now. Some of this projects were major jobs like the fuel tanks down at Katherine Tindal RAAF base, that was an almost 2 year contract I was apart of. I worked out at Groote for 8 months building scaffold so they could carry out repairs for the ship loader. Out at Inpex Oil and Gas Plant doing night shift during their shut down period and day shifts at the MOFF. As well as carrying out all of the scaffolding for the new CDU campus that was built.
As a member of the team I offer physical strength, a good sense of balance, and the ability to work comfortably at heights. Years of experience and skills in problem-solving, teamwork, time management, and a keen eye for detail. I am able to adapt to different site conditions and identify and resolve issues that may arise during scaffolding construction. As well as being able to work as part of a team and have the skills needed to communicate effectively with other construction personnel. I have experience being able to read technical drawings and plans to understand the requirements of a specific scaffolding project. As well as the ability to work in a variety of weather conditions and locations.
erect and dismantle scaffolding to provide safe work platforms on construction, industrial, and temporary structures such as staging and seating. The main tasks include fitting and bolting tubes, braces, and components to form stable scaffold bases, lifting and positioning sections, and installing safety features such as guard rails, guy wires, ropes, clamps, planks, and safety nets. I also dismantle and remove scaffolding once work is complete, ensuring safety and efficiency on-site.
White card
Working at heights
Confined space
Basic scaffold
Intermediate scaffold