I am an experienced civil engineer with a diverse background in construction and project management. My expertise spans the construction of substations, roads, sewage lines, and skyscrapers as well as bulk earthworks and concrete works. I have also worked extensively at mining sites, where I honed my skills in site and material management. My proficiency in industry-standard software like Revu Bluebeam enhances my ability to oversee projects effectively, ensuring high-quality outcomes and efficient operations..

Overview

4
4
years of professional experience

Work History

Graduate ENGINEER

WEST FORCE CONSTRUCTION
02.2024 - Current
  • Graduate Engineer at West Force Construction
    Land Lease Project at Garden Island: Managed bulk earthworks and concrete works.
    Developed and maintained Inspection Test Plans (ITPs) and Inspection Test Reports (ITRs).
    Coordinated with project teams to ensure tasks were executed efficiently and met quality standards.
    Pilbara Mining Site: Completed documentation, including Safe Work Method Statements (SWMS), Job Hazard Analyses (JHAs), and Construction Risk Assessment Workflows (CRAW).
    Reviewed and ensured the accuracy and completeness of all project drawings.
    Collaborated with senior engineers to streamline documentation processes and maintain compliance.
    Modification of Grid Station at Osborne Park Substation: Worked with Western Power on constructing walls and foundations and performing tilt-up work of firewalls.
    Managed all Technical Queries (TQs) related to the project.
    Developed and maintained ITPs and ITRs.
    Procured all necessary materials, ensuring quality and timely delivery. Reviewed all project documentation and maintained clear communication with the client to address needs and expectations.

ASSISTANT MANAGER MATERIAL MANAGEMENT

WAPDA (WATER AND POWER DEVELOPMENT AUTHORITY)
01.2023 - 01.2024

Project: Construction of Substation and 500 KV Line at Nankana sahib.

Responsibilities:
Coordinated the procurement and delivery of materials for the substation and 500 kW line construction.
Managed inventory levels to ensure continuous availability of materials while minimizing excess stock.
Worked closely with suppliers to negotiate prices, delivery schedules, and contract terms.
Monitored material quality and ensured compliance with project specifications.
Collaborated with the project management team to forecast material needs and adjust orders accordingly.
Supervised the material handling and storage processes to prevent damage and ensure safety.
Maintained accurate records of all material transactions and inventory levels.
Implemented cost-saving measures by optimizing material usage and reducing waste.
Addressed any material shortages or discrepancies promptly to avoid project delays.

SITE ENGINEER

SEVEN STAR CONSTRUCTION
09.2020 - 07.2022

Projects: High-Rise Building Construction, Sewage Lines, Drain Water Storages, Embankment Walls.

Responsibilities:
Attended weekly progress meetings with the Project Manager, Client, and Consultant to discuss project progress and address quality-related issues.
Monitored the activities of QC personnel and site supervisors to ensure accurate and effective inspection operations.
Prepared Method Statements for various structural works and obtained approval from Engineers.
Developed Material Submittals and compliance statements in alignment with project specifications and ID drawings.
Conducted Toolbox Talks to enhance site safety and communication among team members.
Created Inspection and Test Plans (ITPs) and Check Sheets (architectural/structural) and secured approval from Engineers.
Addressed and closed civil Site Observation Notices (SON) and Non-Conformance Reports (NCR) issued by Engineers through immediate follow-up with the Construction team.

Education

BACHELOR OF CIVIL ENGINEERING -

The University of Lahore
08.2020

Skills

Revu Bluebeam

Pre and Post Contract Management

Designing structures

Quality control and safety Assurance

Project Planning

MS Project

Auto CAD

REVIT

Cost Estimation

Procurement Management

Site Management

MS Excel

Personal Information

  • Date of Birth: 01/01/1999
  • Driving License: C-A

Visa Status

Work Visa (Full Working Rights)

Timeline

Graduate ENGINEER

WEST FORCE CONSTRUCTION
02.2024 - Current

ASSISTANT MANAGER MATERIAL MANAGEMENT

WAPDA (WATER AND POWER DEVELOPMENT AUTHORITY)
01.2023 - 01.2024

SITE ENGINEER

SEVEN STAR CONSTRUCTION
09.2020 - 07.2022

BACHELOR OF CIVIL ENGINEERING -

The University of Lahore