Summary
Overview
Work History
Education
Skills
References
Timeline
Generic

NAHEEM V K

Richmond,NSW

Summary

I am a mechanical engineer with 4 years of experience on different projects in India and Qatar. Specialized in Sewage Treatment Plant (STP), Facility Management, and Heating, Ventilation, and Air Conditioning (HVAC) technologies. I worked in construction, commissioning, operations and maintenance processes. Known for adaptability and ability to in work in fast-paced environments.

Overview

4
4
years of professional experience

Work History

Mechanical Supervisor

Metito Overseas
Ras laffan, Qatar
01.2023 - 02.2024

Project: Waste Water Treatment Plant (WWTP), NFE‑EPC1 Ras laffan Qatar

Client: Qatargas

Consultant: Chiyoda Technip Joint Venture (CTJV)

Pre-commissioning and Commissioning

  • Collaborated with management team members on long-term plans for improving overall efficiency.
  • Monitored daily operations to ensure that all tasks were completed in a timely manner.
  • Inspected installations for compliance with safety regulations and company standards.
  • Trained staff on proper operation of all machinery and safety procedures related to machine use.
  • Maintained accurate records of all maintenance activities including work orders, reports and other documents.
  • Provided technical guidance on equipment selection, layout designs and troubleshooting techniques.
  • Classified system into various streams and subsystems to carryout pre‑commissioning activities on priority base.
  • Inspected and verified every pipeline, equipment, and instruments are in the field as outlined in approved P&ID.
  • Ensured calibration and testing of instruments prior to installation.
  • Conducted cleaning activities for pipes, vessels and tanks by air blowing and flushing.
  • Decoupled pump from motor and conducted different tests and final alignment.
  • Pump Motor Run Test (PMRT) for mechanical pumps.
  • Commissioned MOVs, Solenoid valves, and other Mechanical valves.
  • LOTO (Lock Out Tag Out) coordination.
  • Made sure the lineups for sewage introduction and TSE water transfer, by implementing LOTOs as per the approved P&ID in the IDC, before plant operation startup.
  • Prepared and implemented LOTOs for Stream‑1 isolation.
  • Commissioned Belt press and Lime silo along with vendors and made sure the functioning as per QG requirements.
  • Ensured working of HVAC system (Package units) for electrical substation.
  • Reviewed monthly production reports to assess performance levels against established goals.

Site Coordinator (HVAC)

Waseef Coporate Asset Management
Doha, Qatar
06.2022 - 12.2022

Project: Barwa Madinatna, FIFA World Cup Accommodations Qatar 2022

Client: Supreme Committee / Accor Hotels

  • Coordinated HVAC activities with contractor (GREE).
  • Maintained accurate records of event activities and expenses.
  • Negotiated contracts with vendors to secure necessary services or products.
  • Coordinated with vendors to ensure timely delivery of supplies.
  • Prepared incident reports.
  • Communicated with other service’s contractors as required.
  • Prepared observation reports to notice discrepancies and made sure work completed accordingly.
  • Prepared Installation reports and Testing and Commissioning reports.
  • Provided summary sheets for inspection requests.
  • Prepared handover documents.

HVAC Site Engineer

Kerala Refrigeration
Calicut, India
11.2020 - 03.2022

Projects

  • Puthiyara Commercial Hotel, Calicut. System ‑ Toshiba VRF Ducted units ‑ 300HP
  • Hotel Pushpak Grande, Calicut Airport rd. System – Mitsubishi VRF Ducted units – 340HP
  • Avani Institute of Design, Calicut. System – VRF Split Ac units – 180HP
  • Malabar Group villa, Montana Estate. System – Mitsubishi VRF Ducted units – 180HP
  • Parisons Group villa, Calicut. System – Mitsubishi Ordinary Ducted units – 330HP
  • Stories Group villa, Calicut. System – Mitsubishi VRF Ducted units – 330HP

CNC Machine Operator

Radheya machining Ltd
Pune, India
12.2019 - 10.2020
  • Worked on the manufacturing of gears and shafts
  • Loaded raw materials into production equipment according to job orders while maintaining proper inventory levels.
  • Adjusted machine feed and speed, changed cutting tools, adjusted machine controls as necessary during the run cycle.
  • Operated multiple CNC machines simultaneously while adhering to safety protocols at all times.
  • Ensured that all components met customer requirements before being packaged for shipment.
  • Set up and operated CNC machines to perform repetitive machining operations on a variety of materials according to specifications.
  • Troubleshot issues related to tooling or programming errors using problem solving techniques.
  • Maintained accurate records of production data including scrap rates and downtime.
  • Read and interpreted blueprints, sketches, drawings, manuals, specifications or sample parts to determine dimensions and tolerances of finished work piece.
  • Maintained quality control by inspecting parts for conformance to specifications, using precision measuring instruments.
  • Provided feedback on product design changes based on experience operating the machinery.
  • Performed regular preventive maintenance tasks on CNC machinery.

Education

Bachelor of Technology in Mechanical Engineering -

Cochin University of Science and Technology
11.2019

Building Management System (BMS) -

Sofcon India Pvt.Ltd
03.2019

Institution of Occupational Safety and Health (IOSH) -

JD Institute of Health and Safety
11.2018

Skills

  • Sewage Treatment Plant (STP)
  • Facility Management
  • Heating, Ventilation, and Air Conditioning (HVAC)
  • Manpower management
  • Mechanical pumps and valves
  • Rotary equipment
  • LOTO (Lock Out Tag Out) coordination
  • Oil and gas HSE work culture
  • CNC Machine operation
  • Building Management System (BMS)
  • Plant operations
  • SCADA
  • Ms Office tools
  • AutoCAD
  • Piping and Instrumentation Drawing (P&ID)
  • Maintenance Coordination
  • Equipment commissioning
  • Reporting and documentation

References

  • Mahin Aboobacker, +97477821949, mahin.aboobacker@metito.com, Metito Overseas Qatar
  • Pankaj Madan Surve, +97433571574, p.surve@waseef.qa, Waseef Corporate Asset Management, Qatar
  • Sahal P V, +91999594073, pvsahal31@gmail.com, Kerala Refrigeration, India

Timeline

Mechanical Supervisor

Metito Overseas
01.2023 - 02.2024

Site Coordinator (HVAC)

Waseef Coporate Asset Management
06.2022 - 12.2022

HVAC Site Engineer

Kerala Refrigeration
11.2020 - 03.2022

CNC Machine Operator

Radheya machining Ltd
12.2019 - 10.2020

Bachelor of Technology in Mechanical Engineering -

Cochin University of Science and Technology

Building Management System (BMS) -

Sofcon India Pvt.Ltd

Institution of Occupational Safety and Health (IOSH) -

JD Institute of Health and Safety
NAHEEM V K