Summary
Overview
Work History
Education
Skills
Timeline
Tickets
Generic

Nathan Smith

Point Clare

Summary

Dynamic Precast/Civil Construction Supervisor with a proven track record at Gamuda Berhad, excelling in construction planning and team leadership. Enhanced operational efficiency through strategic process improvements, while ensuring strict adherence to safety protocols. Skilled in heavy equipment operation and fostering collaboration, driving projects to successful completion with minimized delays.

Overview

11
11
years of professional experience

Work History

Precast /Civil Construction Supervisor

Gamuda Berhad
08.2022 - 07.2025
  • Supervised project teams to ensure adherence to timelines and quality standards.
  • Managed the utilities, earthworks, FRP and shed build.
  • Build of the internal mechanisms of precast tunnel lining segment carousel and lifting devices.
  • Set-up and regulate pre cast operations on an automated system.
  • Managed logistics of crane yard and deliveries to TBM facilities.
  • Implemented process improvements that enhanced operational efficiency across multiple projects.
  • Coordinated resources and schedules to optimize workflow and minimize delays.
  • Trained new staff on company policies and best practices for project execution.
  • Conducted regular safety audits, ensuring compliance with industry regulations and standards.
  • Applied strong leadership talents and problem-solving skills to maintain team efficiency and organize workflows.
  • Implemented cost-saving measures, significantly reducing operational expenses.

Precast Supervisor

FGJV- Salini
10.2021 - 07.2022
  • Oversaw daily operations, ensuring adherence to safety protocols and project timelines. Managing 2 working carousels through mechanical and electrical faults and fault findings to negotiate and manage breakdown times.
  • Mentored junior staff, providing guidance on best practices and workflow optimization.
  • Implemented process improvements, enhancing efficiency in project execution and resource allocation.
  • Coordinated with cross-functional teams to align project goals and resolve operational challenges.
  • Managed inventory control systems, ensuring accurate tracking of materials and equipment usage.
  • Oversaw daily operations of the department, ensuring smooth workflow and timely completion of tasks.

Machine Operator

MJ Marine
12.2019 - 03.2020
  • Operated 14T excavator and skid steer to ensure efficient production processes and maintained quality standards.
  • Monitored equipment performance and performed routine maintenance to minimize downtime.
  • Collaborated with team members to optimize workflows and improve operational efficiency.
  • Set up and adjusted equipment and properly configured machines for daily operation.
  • Contracted for artificial oyster lease through sub contractor to RMS(3 month contract only)

Leading Hand Marine Piling

John Holland Group
01.2019 - 12.2019
  • Supervised daily operations, ensuring compliance with safety protocols and work standards. Access to and from barges and abutments.
  • Piling, coffer dams, FRP of cast in-situ pile cap shells. Breakdown of piles and dewatering.
  • Coordinated workflow among team members to enhance productivity and efficiency.
  • Lift allocations from all cranes on abutments and barges, setting anchors and helping Coxswain with movement of barges.
  • Implemented process improvements, reducing downtime and increasing output quality.

Cross Passage Leading Hand

Lendlease
01.2018 - 12.2018
  • Supervised daily operations, ensuring compliance with safety standards and protocols.
  • Managed sub-contractors with drainage, trenching electrical works , FRP and blockwork. Within electrical cross passages, pedestrian access passages and longitudinal precast placement.
  • Coordinated materials and resources for projects, optimizing supply chain efficiency.
  • Conducted regular inspections to identify hazards and enforce safety regulations on-site.

Labouring/ Dogman

Telum
06.2016 - 12.2017
  • Self-motivated, with a strong sense of personal responsibility.
  • Worked effectively in fast-paced environments.
  • Skilled at working independently and collaboratively in a team environment.
  • Proven ability to learn quickly and adapt to new situations.
  • Dogman for John Holland Franna, Assisted with steel girder land bridge and cut and cover works.

Civil Construction Leading Hand

Acciona
01.2015 - 05.2016
  • Coordinated daily operations to ensure efficient workflow and adherence to safety protocols.
  • Supervised team members, providing guidance and training on equipment usage and best practices.
  • Monitored project progress, identifying issues and implementing solutions to maintain timelines.
  • Conducted regular inspections of work areas and materials to ensure compliance with quality standards.
  • Assisted in scheduling tasks, optimizing resource allocation for maximum productivity.
  • Managed multiple projects simultaneously, adhering to strict deadlines without compromising quality or safety standards.

Education

High School Diploma -

TAFE NSW
NSW
06-2001

Skills

  • Heavy equipment operation
  • Construction planning
  • Bridge construction
  • Materials management
  • Drainage systems
  • Subcontractor coordination
  • Site supervision
  • Teamwork and collaboration
  • Attention to detail
  • Multitasking and organization
  • Construction supervision
  • Workplace safety
  • Critical thinking

Timeline

Precast /Civil Construction Supervisor

Gamuda Berhad
08.2022 - 07.2025

Precast Supervisor

FGJV- Salini
10.2021 - 07.2022

Machine Operator

MJ Marine
12.2019 - 03.2020

Leading Hand Marine Piling

John Holland Group
01.2019 - 12.2019

Cross Passage Leading Hand

Lendlease
01.2018 - 12.2018

Labouring/ Dogman

Telum
06.2016 - 12.2017

Civil Construction Leading Hand

Acciona
01.2015 - 05.2016

High School Diploma -

TAFE NSW

Tickets

High risk work

EWP, LF, DG, C6



Front end loader

Skid steer

Excavator

Telehandler

Civil cert 3

Confined space

Work at heights

Nathan Smith