Summary
Overview
Work History
Education
Skills
Certification
PERSONAL
Email Addresses
Personal Information
Timeline
Generic
NEIL EVANGELISTA

NEIL EVANGELISTA

Cranbourne East

Summary

With over 22 years of experience in various technical support roles, honed skills in supervision, implementation, QA, commissioning, integration, troubleshooting, operations, and maintenance. Expertise in ERICSSON 2G, 3G, 4G LTE700, WCDMA 850/2100 Mhz Node B RBS2000 3000 6000 family HUAWEI BTS 3900L, 3800, GU900, G1800, U2100. Integration Engineer with knowledge of equipment installation and commissioning for WCDMA, GSM, WLL, CDMA, UMTS technologies. Strong communication, leadership, and motivation skills for effective interactions with staff, clients, and executive management. Proficient in Microsoft Office and Windows Applications (Word, Excel, PowerPoint) gained through experiences with local and foreign companies.

Overview

32
32
years of professional experience
1
1
Certification

Work History

Telecommunication Technician

Visionstream Australia Pty Ltd
08.2012 - Current
  • NBNC Limited Wireless Ericsson Project NBRAN Installation and Commission RBS6102 DBS6101 RBS6601 DUL 20 01, DU 30 11/30 12, SSC-02 RBS6126 OTS WAP Minilink TN in SSC-02 (Site Support Cabinet) & BBS 6101 (Battery Backup System) RBS660 MU, Plug connectors into SFP (small form-factor pluggable optical transceiver) mounted in the DU, GPS, Minilink TN Subrack, Batteries, Power system Web Board, Alarms, Service Earth Bar allocation.
  • NE Minilink TN Commissioning Amm 20p / Amm 6p C ML-TN, RAU upgrade/down grade software baseline, Loading DT Site configuration file, configure add link, single radio link, Radio link Bonding 2+0+0/ 1+1 to 4+Hot/Standby and space Diversity Radio link, Configure VLAN switch port, WAN RL-IM Ethernet.
  • Installation trigger Hubert+ Sunhe ML Hybrid cable 3x3 and 6x6
  • Assist trigger installation of RRUS 6 2.3 ghz installation RRUS 2218 2.3 ghz 3.4 ghz panel antenna comm scope Alpha Wireless make sure before hoisting for each RRUS Panel Antenna record the manufacturer serial number and revision of RRU and SFP (small form-factor pluggable optical transceiver) in the SID product list, Insert the SFP into the SFP slot optical cable.
  • Conduct Minilink TN BERT 24 hr Stability test/ RFC2544 testing Ethernet link over the radio interface using EXFO test equipment FTB-860 and ExpB V10, JDSU
  • Capturing Sweep data the coaxial cable for both GPS Antenna, MW Radio cables (IF) to ensure that the cable, connectors and earth kits installed correctly, sweep test conducted return Loss (RL), Distance to fault (DTF) using Anritsu the parameter for each cable are Cable Loss, Propagation velocity, setting in trust frequency as specified for the GPS and (IF) MW
  • Quality verify and measure that installation process delivers with high quality and according to the installation MOP (Method of Procedure)
  • Telstra - Blackspot Installation RBS6000 series (LTE) Testing and commissioning and Integration of Ericsson 6202 call and speed testing using blackbird this site Net Testing SW, documents pack completion
  • OPTUS JV Feasibility Study of Base Station Equipment, DC Power, Transmission, Equipment floor layout Existing Antenna Config RF plumbing diagram, Site Photos, Power Calculation using Tool, Site Access
  • Optus Huawei Project BTS 3900L, Eltek FP-2, Andrew ACU, Harris Microwave Installation and Commissioning, documents handover.
  • Commission and Integrate BTS 3900 GU900, U2106 as per Optus documentation Note: Test all Power and shelter alarms with Optus integrations.
  • Install and Commission New Antenna system (antenna, 2100 mhz, bias tee and remote tilt systems) as per RF & Equipment operand FdC wrg.
  • Connect as required and verify E2E transmission available using tool JDSU PTest eqpt
  • Conduct QA, and quality checklist to be submitted to Optus PM/BBD within 2 weeks of RFI.

Telecommunication Technician

ABIGROUP Pelican Energy
03.2012 - 08.2012
  • Responsible for the HUAWEI BTS3900L Installation, testing, integration, data testing call, video, data testing using E63, Huawei test phone with coordinator at RIC
  • Organize and plan the successful execution of given jobs obtaining necessary information about the equipment
  • Installed the New BTS3900L Huawei GU900, G1800, U900, U2100 Line Change Out – Hot Swap of Existing Nokia Ultra site, DE34 matrix, Flex BTS
  • Decommissioned Rectifier flex insys, Nokia BTS Ultra site, Intralink, Flex BTS
  • Commission Configure Eltek Flat pack, KATHREIN Central Control Unit, ANDREW Antenna Control Unit
  • Transmission Testing Alcatel 642E MC, Aviat Harris Stratex from Base Station to RIC
  • Coordination with the Huawei Site controller is a problem regarding configuration file, Software from R12 to R13
  • Clear faults, margin safety margins with RF, external alarms, hardware faults with BBP, WMPT, WRFU, MRFU New P Config for Kathrein Central Control Unit RET, ANDREW Antenna Control Unit, RIC required PING Test
  • Perform Antenna System tests using Site Master Anritsu S331D if there is a cell with high VSWR
  • Responsible for recovery of existing BTS SWAP equipment needed to recover, make request filled up RTR forms and examine at OPTUS Transport on trip for pickup of Decommissioned equipment.
  • Act in a manner that will foster a harmonious and productive team environment
  • Complete the document checklist, test procedures for assigned task

Telecommunication Technician

Infrate Network Pty Ltd
07.2011 - 03.2012
  • Responsible for Technical Site Survey Report for OPTUS/HUAWEI B9000 overbuilt Project Survey Audit internal external installed at site for preparation for Change Out/ HOT Swap of existing NOKIA Flexi BTS/ Ultra site , Supreme AG/3G.
  • Proposed Installed new HUAWEI BTS 3900L G900, G1800, U900, U2100. Document preparation for internal, external like BTS, Transmission details, DC Configuration Supply, Existing feeders system details, RF plumbing Diagram details, floor plan layout details, photos Coordination to the site controller for Huawei priority sites and need to upload at Site for planning/Design execution.
  • TN installation 2P, 6P, 20P at Vodafone Ericsson Catalina Project TN 20p, 6P, 2P hardware software upgrade Installation and Commissioning of NSN flexi BTS U850, U900 and U2100 Huawei BTS 3900L Installation and Commissioning Optus Vodafone Project

Node B Integration/Commission Engineer

Ericsson Brasil LINK
10.2010 - 12.2010
  • Commissioning Integration and Test @ Ericsson CLARO Project 3G WCDMA Node B 850/2100 RBS 3000 (3418, 3518, 3206) documentation commissioning and test result. Organize and plan the successful execution of given jobs obtaining the necessary information, equipment, tools, materials.
  • Installation, Commissioning, Integration and testing Ericsson WCDMA 850/2100 RBS 6000 (6601) under Ericsson VIVO Project.
  • Responsible for the upgrade of CLARO/VIVO Base Stations site into 3G/ WCDMA 850/2100 MHz
  • Commissioning Integration testing of Ericsson WCDMA Node B equipment (RBS 3000, 6000)
  • Organize and plan the successful execution of given jobs obtaining necessary information, equipment, tools
  • Responsible for IMA Configuration and creating ATM cross connection into Node B involving scripting loading O&M, External Alarms, Site Complete, RF Configuration.
  • Perform remote troubleshooting of Main connection for particular sites with mismatch configuration of physical Links from Node B to RXT using RBS Element Manager.
  • Perform the integration procedures for RBS 3418/3518/6601 based on Ericsson RBS Element Manager towards the Radio Network Controller (RNC) by loading configuration at site specific scripts (e.g. O&M, External Alarms, Site Complete, RF Configuration.

RAN/TRAIN Field Coordinator

Ericsson Vietnam/SELEK AB Sweden
10.2008 - 04.2010
  • Supervise installation and integration of RBS 2216, RBS 2111, Deftel Outdoor Power System and Mini Link TN
  • Conduct the commissioning of RBS by antenna sweep testing checking RBS Configuration, call testing, material inventory, fault finding and rectification testing of internal and external alarms.
  • Conduct acceptance testing of RBS by performing SWR and DTF reading Return loss, stand alone test, checking RF parameter and RBS configuration based on approved Channel Loading Plan (CLP), Call Scenario for calls, local remote reset, alarm testing, review of As-built plans based on actual inspection and site inventory;
  • Conduct acceptance testing by reviewing of As-built plans based on actual physical inspection, checking assigned frequencies, Receive Signal Level RSL, Transmit Power interference test results and Hop & Far-end site ID based on the link budget check IP configuration, Subnet Mask and Gateway address, service channel test, DC supply reading local remote reset, alarm testing and 24-hour BER testing.
  • TN 20p, 6p, 2p upgrade and downgrade software baseline of NPU, MMU, 2 and STM1/MMU E155, TU155, TU155 of Mini Link TN from R14 to R11 or vise versa.
  • Materials and equipment request, coordination and conduct site auditing.
  • Supervise implementation activities of ASP’s on the on-going NORTE BTS to ERICSSON RBS 2216 swap out for HTC Vietnam.
  • Commission, load flash and web RBS software and Integrate sites completely by ASP’s for installation
  • Perform Antenna system tests using Bird Site Master/Anritsu Site Master prior to integration
  • Perform site tool testing handover using TEMS.
  • Complete all data on SID for documentation and acceptance readiness.
  • Perform Site Quality Audits for sites Integrated prior to rectification to be ready for PAT.

Supervisor Integration Commissioning RBS/Transmission Engineer

Ericsson Philippines (JCC)
02.2008 - 10.2008
  • Commissioning/Integration Implementation of GSM 1800 Roll Out for Ericsson DMPT Telecom for North Luzon Bataan, Zambales area.
  • Do the Testing, Commissioning, Integration of RBS 2216/2116.
  • Do the DRU upgrade and create the IDB then copy all backup files.
  • Testing, Commissioning of Ericsson Minilink Traffic Node 2P, 6P, 20P site
  • Transmission medium then do revision of traffic routing if required to do so, sites from the BSC.
  • Worked on existing Sites of DMP Interfacing Alcatel equipment to Ericsson Traffic Nodes in E1 connections prior to RBS Integrations.
  • Do the software upgrades, downgrade of the Traffic Nodes as licenses for the operator (Baseline, NPU, MMU and STM1 LTU software.
  • Testing and Commissioning of Eltek Rectifiers.
  • Troubleshoot any technical problem during and after integration.
  • Perform RF feeder cable sweep test (DTF VSWR) using Anritsu S331D Site Master.
  • Do the evaluation BIS/FA Site documentation checking input data from the field then edit and prepare C-modules IR/SID/SDD.
  • Complete and document test procedures for assigned task.

Integration Commissioning RBS/Transmission Engineer

Ericsson Uganda (Paracell)
09.2007 - 12.2007
  • Assigned as Team Leader of the Implementation of GSM Roll Out for Warid Telecoms
  • Do the Installation, Testing, Commissioning, Integration of RBS 2216/2116, RBS 2116 and RBS 2308.
  • Do the DRU upgrade and create the IDB then copy all backup files.
  • Do the Installation, Testing, Commissioning of Ericsson Minilink II-CAPACITY Traffic Node 6P, 20P site
  • Transmission medium then do revision of traffic routing if required to do so, sites from the BSC.
  • Worked in Backbone Sites Interfacing Nera (STM1) and Huawei (ADM) equipment to Ericsson Traffic Node E1 connections prior to RBS Integrations.
  • Do the software upgrades for the Traffic Nodes as licenses for the operator (Baseline, NPU, MMU and STM1 LTU software).
  • Installation and Commissioning Emerson Rectifier (2018 & 501 series)
  • Troubleshoot any technical problem during and after integration.
  • Perform RF feeder cable sweep test (DTF VSWR) using Anritsu S331D Site Master.

Commissioning/Integration/Node B Technician

CMS GLOBAL PTY LTD/ JOHN HOLLAND TELECOMMUNICATIONS
06.2007 - 06.2007
  • Commission, Integrate and Test @ Project Jersey Telstra 3G WCDMA Node B RBS 3206/ 3106, documenting commissioning and test result. Organize and plan the successful execution of given jobs obtaining the necessary information, equipment, tools, materials.
  • Responsible for the upgrade of Telstra Base Stations site into 3G/ WCDMA 850 MHz
  • Commissioning Integration testing of Ericsson WCDMA Node B equipment (RBS 3206/RBS 3106)
  • Organize and Plan the successful execution of given jobs obtaining necessary information, equipment, tools
  • E-1 connection to RBS 3206 prior to Integration and preparation of data script for each site to be loaded into the RBS 3206.
  • Perform the integration procedures for RBS 3206/ 3106 based on Ericsson Graphical User Interface (GUI) tool and Element Management Application & Support (EMAS) towards the Radio Network Controller (RNC) by loading configuration at site specific scripts (e.g. O&M, Site equipment, UB, Band parameters.
  • Perform final configuration revision, CV backup and collecting required files (e.g. g.plist, cv, cv to, and Element Management Application & Support (EMAS) towards the Radio Network Controller (RNC) by loading configuration at site specific scripts (e.g. O&M, Site equipment, UB, Band parameters.
  • Conduct Antenna & Feeder System Testing using Site Master
  • Performed activities such as System Upgrades, swapping, modification and rectification for 3G & 2G
  • Call and Drive Test & keep Log Files using Tems Product Program
  • Troubleshoot Technical problems of 3G RBS equipment, feedbacks
  • Feedback any OH&S site issues to site controllers client representatives.
  • Collects/Revise/Completes/Submit site plan documents such as As Built Drawings, Site Acceptance Test
  • Check list Network Elements using Ericsson Site Handler which is Oracle database system of the sites prior to acceptance.
  • Act in a manner that will foster a harmonious & productive team environment.
  • Complete and document test procedures for assigned task.
  • Equipment Used: Laptop, Computer, Base Tools, Site Master (Anritsu), Ten Unit Product Tools, 3G Test Phones, Argus Antenna Tilt Controller

RBSS Supervision, Implementation/Testing Commissioning/Integration Engineer

ALANDIC MIDDLE EAST
02.2006 - 03.2006
  • Do the site inspection for SIR and make it sure site is ready for Telecom installation then prepare the MRF/SID.
  • Perform commissioning/Testing Integration of RBS 2206 and RBS 2207.
  • Commissioning of Mini-Link E and 20P, 2P, 6P, 4U node that includes traffic routing node sites and link up to tens base lines.
  • Do different tests such as VSWR on feeder using (ANRITSU S331D) BER Test on Microwave link, call test, test call for every cell then check every cell ID/ARFCN/BSC/RX LEVEL, Hand Over test, GPRS WAP test and PING WARD SERVER Tems unit etc.
  • Supervise telecom installation indoor/outdoor RBS/Power, Antenna/TMA and RAU 1+ 0/ 1+1 and also proper grounding for feeders IF cables.
  • Train local technicians regarding Ericsson standard and develop their potentials to become highly competitive with telecom installation.
  • Site inspection and verification of newly build container shelter to see to it ready for installation RBS equipment and also for outdoor works into the tower.
  • Provide support to the provinces, troubleshoot software problem
  • Coordinate survey regarding link-up to local fixed line carrier for lease lines, arrange all requirements and ensure that everything will be carried out on time.
  • Do the evaluation RT/FA Site documentation at checking input data from the field then edit and prepare C-modules IR/SID/SDD.

Telecom Commissioning/Integration/Implementation/Installation Engineer

ALANDIC MIDDLE EAST
09.2004 - 12.2004
  • Responsible for the installation and testing of Huawei BTS Equipment GSM/WLL Project.
  • Supervised the local engineers for the installation of BTS antenna/feeder cables/feeder cables/feeder connectors termination Feeder grounding.
  • Involved in installation of Huawei BTS-30/BTS-30 Commissioning/Integration
  • Rectification and sweep testing of BTS antenna using site analyzer (BIRD)
  • Site inspection and verification of newly build container shelter to see to it ready for installation BTS equipment and also for outdoor works into the tower
  • Power up and Commission/Integrate the BTS into the network and rectify any alarms occurred during Integration
  • Installation and Commissioning of Huawei MSC, BSC, OMC, BIRGGSN911
  • Coordinate with Huawei regarding Implementation Standards and Guidelines in site equipment installation
  • Plan and Organize installation team for MSC/BSC/OMC BTS Hardware.
  • Perform MSC/HLR/BSC/OMC/BTS/OMC BTS warrant installation provisioning.
  • System power start up and hardware functional testing.
  • Hardware provision BTS/OMC BTS site initial data configuration
  • MSC/BSC power on test installation report and documentation
  • Hardware acceptance test troubleshoot and do rectification
  • Coordinate materials delivery to the logistics and do report regarding project status.

Project Engineer

ETSI TECHNOLOGIES INC./ SIEMENS AG Joint Venture Company
01.2004 - 09.2004
  • Direct supervision of Telecom, Civil works construction with sub-contractors as the main work, installation into the network of Globe Telecom Phase 0 Rollout.

PROJECT Site Supervisor/Inspector

Alcatel Philippines Inc.
03.2003 - 12.2003
  • Inspection/Supervision of Telecom installation, Civil works construction with sub-contractors as the main work, implementation into the network of Sun Cellular Phase 1a/1b-2.

PROJECT Consultant ENGINEER Maynila Water Works

Gutteridge Haskins and Davey Pty Ltd. (GHD)
08.2002 - 03.2002
  • Angat Water Supply Optimization Project Primary Main 1 (APM-01) The Project involved the construction of an approximate length of 31.00 kms. Primary main distribution which consists of 1500 mm to 600 mm diameter steel pipe coal tar coated 500 mm to 400 mm diameter steel pipe cement coated/cement lined welded type, 300 mm diameter C.I. pipe slip-on type and 150 mm diameter PVC for secondary distribution and other ancillary works. This included 500 mm diameter pipe jacking creek crossing.

PROJECT Engineer

Merald Industrial Engineering Services Corporation
03.2000 - 08.2000
  • Inspection/Supervision, Coordination to the Sub Contractor Transmission line Project BPC 230KV as the main work force for the implementation of the project.

PROJECT Supervisor IV – Area Head

Ericsson Telecom Inc.
07.1998 - 01.1999
  • As Area Coordinator Manage/Supervise lineman, Splicer, Copper, Optical and Civil works, Supervisors. Coordinate with DIGITEL inspector related project requirements, schedule of outside plant project EX-PSTN-LUZON Project, DIGITEL TELIA TELECOM Expansion Program.

Project Supervisor-Outside Plant

MIESCOR-ERICSSON TELECOM, INC.
04.1994 - 07.1996
  • In-charge of civil works, manhole and conduit poles and anchor cabinet base pad foundation guard post erection, cell site development, tower erection and provide local area network to PLDT-Ericsson Zero Backlog project.

Cadet Engineer

ABB/ KAWASAKI TDK/ ALLTECH
06.1993 - 03.1994
  • Study technical specification of drawing based on ABB standard
  • Scheduling of manpower/equipment to minimize lost time and to make it to work schedule
  • Estimated material controlling
  • Construction Supervision
  • Handled all the monitoring and inspection works for the assigned projects
  • Documentation

Education

Bachelor of Science - Mechanical Engineering

Bataan Heroes Memorial College
01.1992

Secondary Education - undefined

Bataan National School of Arts and Trades
01.1987

Skills

  • Safety practices
  • Installation and maintenance
  • Troubleshooting systems
  • Professionalism
  • Equipment installation
  • Telecom infrastructure
  • Work order completion
  • Configuring equipment
  • Test equipment operation
  • Documenting activities
  • Software upgrades
  • Teamwork and collaboration
  • Time management
  • Excellent communication
  • Technical troubleshooting
  • Quality assurance

Certification

  • First Aid Training St John First Aid HLTAID003 Provide Cardiopulmonary Resuscitation Sep 04 2017 Melbourne
  • RADHAZ RFEMA Awareness Course (AWR02) Aug 17 2017 Melbourne
  • Ericsson Theoretical and Practical Assessment for the ASP Certification Group Installation of Radio Cabinet (IRC) Test of Radio Site 4G (TRS-4) Basic Set-up of Microwave products (BSMP) July 08 2014
  • Optus HUAWEI U900 BTS 9000L U900, U2100, G900, G1800 Installation, Commissioning, Quality, Safety Training Infratel Warehouse Bingley Village, Melbourne VIC Australia (Infratel) January 11 & 13 2012
  • OPTUS HUAWEI U900 BTS 3900L Installation/Commissioning, Quality, Safety Training Huawei Office St Kilda, Melbourne (Abigroup) March 7 & 8 2012
  • First Aid Training Level 2 CPR Training 6/343 Little Collins Street, Melbourne VIC 3000 January 12, 2012
  • DELTA Outdoor System Installation Operation and Maintenance for ESOA/150ABA01 ESOA/ABB02 Training in Vietnam HCM City Ericsson Warehouse April 8-10 2009
  • Telstra Site Induction Course July 17, 2006
  • John Holland Telecommunication - RFEMA Awareness Course - RADHAZ Consulting Pty Ltd August 23, 2006
  • John Holland Telecommunication - Statement of OHS Induction Training - OHS GENERAL INDUCTION for CONSTRUCTION WORK in NSW September 6, 2006
  • John Holland Telecommunication - Height Safety Training Level 1 - NSW OHS Act 2000 - Codes of Practice and Australian Standards - Provide practical guidance about the Implementation of Legislation - Safety Harnesses - Emergency Response - Inspection & Maintenance August 2, 2006 Defender Safety and Training Pty Ltd #27 Prime Street, Seven Hills, Sydney Australia NSW
  • Gutteridge Haskins and Davey Pty Ltd (GHD) GHD Role, Organization QA and the Construction Management Manual - The Construction Contract - Site Management - Contract Site Documentation - The Technical Specification and Contractor Quality August 21-26 2000, September 02-09-16 2000

PERSONAL

Can travel to different places if job requires. Writes and speaks in English and Filipino.

Email Addresses

  • Neil.evangelista@visionstream.com.au
  • Ndevangelista_69@yahoo.com

Personal Information

  • Title: Telecommunication Professional
  • Availability: Can travel to different places if job requires.

Timeline

Telecommunication Technician

Visionstream Australia Pty Ltd
08.2012 - Current

Telecommunication Technician

ABIGROUP Pelican Energy
03.2012 - 08.2012

Telecommunication Technician

Infrate Network Pty Ltd
07.2011 - 03.2012

Node B Integration/Commission Engineer

Ericsson Brasil LINK
10.2010 - 12.2010

RAN/TRAIN Field Coordinator

Ericsson Vietnam/SELEK AB Sweden
10.2008 - 04.2010

Supervisor Integration Commissioning RBS/Transmission Engineer

Ericsson Philippines (JCC)
02.2008 - 10.2008

Integration Commissioning RBS/Transmission Engineer

Ericsson Uganda (Paracell)
09.2007 - 12.2007

Commissioning/Integration/Node B Technician

CMS GLOBAL PTY LTD/ JOHN HOLLAND TELECOMMUNICATIONS
06.2007 - 06.2007

RBSS Supervision, Implementation/Testing Commissioning/Integration Engineer

ALANDIC MIDDLE EAST
02.2006 - 03.2006

Telecom Commissioning/Integration/Implementation/Installation Engineer

ALANDIC MIDDLE EAST
09.2004 - 12.2004

Project Engineer

ETSI TECHNOLOGIES INC./ SIEMENS AG Joint Venture Company
01.2004 - 09.2004

PROJECT Site Supervisor/Inspector

Alcatel Philippines Inc.
03.2003 - 12.2003

PROJECT Consultant ENGINEER Maynila Water Works

Gutteridge Haskins and Davey Pty Ltd. (GHD)
08.2002 - 03.2002

PROJECT Engineer

Merald Industrial Engineering Services Corporation
03.2000 - 08.2000

PROJECT Supervisor IV – Area Head

Ericsson Telecom Inc.
07.1998 - 01.1999

Project Supervisor-Outside Plant

MIESCOR-ERICSSON TELECOM, INC.
04.1994 - 07.1996

Cadet Engineer

ABB/ KAWASAKI TDK/ ALLTECH
06.1993 - 03.1994

Secondary Education - undefined

Bataan National School of Arts and Trades

Bachelor of Science - Mechanical Engineering

Bataan Heroes Memorial College
NEIL EVANGELISTA