Summary
Overview
Work History
Education
Skills
Certification
References
Timeline
Generic

Nicholas Wootton-cooper

Summary

Focused on completing rigging work to maintain tight deadlines. Works well in both independent and team-based environments. Well-organized and reliable with excellent planning and execution paired with sound safety record.

Overview

3
3
years of professional experience
1
1
Certification

Work History

Rigger

UGL Resources
07.2023 - Current
  • Rigging and installing pipe modules
  • Building and installing 600t ringer crane
  • Building and installing 280 crawler crane
  • Constructing lampsons lift and lock for generator installation
  • Installing gt1 generator 200t with lampsons lift and lock
  • Experienced dogging and rigging under 25t franna, 110t roughy,130 crawler,150t crawler,250t crawler,280t crawler,600t ringer crane
  • Installation of both gt1 and gt2 turbine rotors 100t each (critical lifts)
  • Installation of blade rings using dual lifts with 2 or more chain blocks (critical lifts)
  • Installation of gt1 and gt2 exhaust stacks 65m tall using 135 EWP and man box
  • Installation of generator approximately 60t using 600t ringer crane

Lead Rigger

Monadelphous Engineering
06.2023 - Current
  • 103 dragline shutdown
  • 15t swing shaft removal dual lifts using over head crane to float out of tight space on to 250t crawler
  • 100t winch drum assembly jacking to allow clearance for removal of bull gears
  • Hoist gear assembly removal 10t
  • Stripping down swing shaft components in work shop with 800t horizontal press
  • Use of liquid nitrogen to shrink shaft and heat on bearing and gears for assembly
  • Removal of bull gear from drum on site when going through critical lift plan was noticed by my self we did not have correct procedure in place for removal this problem was rectified by myself and 2 engineers as it was an on going issue
  • Bull gear was removed safely using dual lifts with 23 t gantry crane and 32t gantry crane bull gear weight 34t
  • Using 250t crawler for transfer on bull gear off gantry crane

Lead Rigger

Howden
05.2023 - 06.2023
  • Critical failure upgrade on impeller and shaft
  • Leading hand only rigger on site
  • Removal of impeller housing
  • Rigging shaft and impeller for overhaul
  • Removal of impella and shaft assembly with chain blocks dual lift
  • Installing new impeller (12t) and bearing housings using chain blocks in tight space safely
  • Reinstalling housing and piping around impeller
  • Using alignment tool to align Impeller to motor
  • Met job requirements and job times 16 days quoted finished in 5

Lead Rigger

Howden
03.2023 - 05.2023
  • Fan and impeller upgrade on underground suction if fans
  • Leading hand rigger role only rigger on site
  • Removal of fan housing with 130t slewing crane
  • Rigging shaft and impeller assembly
  • Dual lift using 25t franna
  • Loading 30t impeller assembly on flat bed truck and stripping down
  • Shaft and bearing over hall removing roller bearings couplings
  • Man box works cleaning and repairing I’d fan blades
  • Install of overhauled shaft bearing assembly and housing all done safely and with precise works
  • Met job time frame completed works in 6 days when quoted 17 days

Rigger

Howdens
03.2023 - Current
  • Worked at heights and in confined spaces without difficulty.
  • Heater basket removal
  • Rigging baskets and replacing
  • Rigging acseal plates and removal
  • Dual chain block lifts and transfer sector plates with 100t crane
  • Removal of seals and replace
  • Air winch and drum actions on lifting multiple heavy motors, baskets, bins, gearboxes
  • Cutting out radial plates and replacing
  • Anchored pieces to fixed structures with bolts and clamps.
  • Maintained rig engines and motors.

Rigger

Monadelphous Group
01.2023 - 02.2023
  • Rigged for heavy lifts according to blueprint requirements.
  • Worked at heights and in confined spaces without difficulty.
  • Washery Screen removal and upgrade
  • Pulling out and replacing metal piping to poloy piping
  • Gantry crane lifts
  • Franna lifts

Rigger

Dark Knight Engineering
01.2023 - 01.2023
  • Worked at heights and in confined spaces without difficulty.
  • Rigging gear boxes from screws
  • Inspection of shaft and bearings and replacement
  • Replacing dust filters

Rigger

Downer Group (ENGAGE)
10.2022 - Current
  • Worked at heights and in confined spaces without difficulty.
  • Replacing 20 meters of vent line pipe and reinstalled which involves multiple chain block transfers to get in and out of a tight spot.
  • Fixing load to structure for safe access
  • Cpp ball valve replacement and reinstalled
  • Rigging pipe work for valve clearance
  • Torquing bolts for valves

Rigger

Ugl
09.2022 - 10.2022
  • Determined correct rigging requirements for equipment based on job specifications and environmental conditions
  • Worked at heights and in confined spaces without difficulty
  • Installing expansion joints
  • Rigging structural steel
  • Winch operations
  • Rigging and installing pipes

Rigger

Chappell Building Systems
07.2021 - 08.2022
  • Worked at heights and in confined spaces without difficulty.
  • Experience tilt panel lifts and install
  • Experience pre cast panel lifts and install
  • Installing structural steel
  • Corking panel joints
  • Dual crane lifts
  • Rigged for heavy lifts according to blueprint requirements.
  • Consistently assumed additional responsibilities and worked extended hours to meet project deadlines.
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.


Rigger

Howdens
04.2021 - 05.2021
  • Worked at heights and in confined spaces without difficulty.
  • Installing expansion joints
  • Rigging structural steel
  • Rigging piping stiffners
  • Rigging removal of heater baskets
  • Rigging installation heater baskets

Education

Morisset High School
Morriset, NSW

Skills

  • Counterweights Experience
  • Safe Work Practices
  • Structural steel experience
  • Team player
  • Heavy Machinery Operation
  • Training Junior Team Members
  • Rigging and Setting

Certification


  • Certified
  • Rigger intermediate (RI)
  • Work platform (WP)
  • Gold card (B,F,J,O)
  • Working at heights
  • Confined spaces
  • Yellow card (SL)
  • Whs white card
  • Gas and atmosphere testing (MSMWHS217)
  • First aid

References

Joe menchin (Ugl supervisor) 0488134327

Jason James (Howden supervisor)0431249142

Adam Goodchild (Howden supervisor) 0400125145


Timeline

Rigger

UGL Resources
07.2023 - Current

Lead Rigger

Monadelphous Engineering
06.2023 - Current

Lead Rigger

Howden
05.2023 - 06.2023

Lead Rigger

Howden
03.2023 - 05.2023

Rigger

Howdens
03.2023 - Current

Rigger

Monadelphous Group
01.2023 - 02.2023

Rigger

Dark Knight Engineering
01.2023 - 01.2023

Rigger

Downer Group (ENGAGE)
10.2022 - Current

Rigger

Ugl
09.2022 - 10.2022

Rigger

Chappell Building Systems
07.2021 - 08.2022

Rigger

Howdens
04.2021 - 05.2021

Morisset High School
Nicholas Wootton-cooper