Nivin Johny Pokkidiyil

Melbourne,Victoria

Summary

As a dedicated Mechanical Engineer specializing in Estimation, Drafting, and Project Management, my passion lies in the field of construction. One of my major achievements was the successful completion of the Lower Fars Heavy Oil Development Program Phase 1 in the position of a Project Engineer, responsible for overseeing mechanical equipment and structures in an Oil and Gas project in Kuwait. My international experience as a quantity surveyor in Qatar, as well as my roles as a Site Engineer in Thermal power projects in India, have provided me with invaluable insights into project execution and management. With a 'CAN-DO' attitude and a genuine passion for construction, I am committed to continuing my career in this field, leveraging my diverse experiences to contribute to innovative and successful construction projects.

Overview

9
9
years of professional experience

Work History

Mechanical Engineer

NBTC- Oil & Gas Construction Co
02.2016 - 01.2020
  • I was the Mechanical engineer responsible for the execution of mechanical activities such as Shoe support fabrication, Plant equipment installation, Preservation and pre-commissioning work, Structure installation of the ISS3 area and Well Block (WB3) area
  • I got opportunity to execute the construction activities for pipe racks, rotating equipment, static equipment, Flare stack, compressors, heat exchangers, pumps, Vessels, Tanks, pig launchers/ receivers and coolers
  • Managed 4 supervisors and 8 foremen and trade persons-welders, fabricators fitters of a total 60
  • Understand the baseline schedule for the project and understand the completion target of the project
  • Work front calculation based on materials, drawings, and the site situation
  • Preparation of micro schedule of the specific tasks considering the interface activities and arrive at the date when it is planned to be achieved
  • Coordinate with QC for any RFI's and any client requirements or in-house coordination
  • Understand the risk of the job being executed if any and understand the method statement to carry out any task
  • Understand the sequence, Inspection Test Plans and specifications
  • Arranging the materials in advance and ensuring adequate work front for the working team
  • Close coordination with client for any engineering and field issues
  • Erection and installation of Equipment (static and rotating), steel structures on foundations as per project specification & drawing and do the leveling, alignment, release for grouting & all other works to complete the erection
  • Responsible to be or to become knowledgeable of the requirements of the reference codes, standards and specifications, as applicable to the Construction part of the Subcontract Works and as specified in 'Approved for Construction' drawings
  • Responsible for executing preservation activities as per schedule and recording all activities and observations on applicable preservation record forms
  • Detailed study of P&ID and General Arrangement drawings, ensure the availability of materials with respect to the packing list
  • Conduct inspection and testing stage wise as per the Inspection Test Plan and confirming that all quality records have been completed and accepted
  • Preparation of WMS (Work Method Statement), Risk Assessment for all construction activities prior to commencing the activities
  • Responsible for the mechanical completion activities that are required to be performed to allow successful completion of pre-commissioning, commissioning and start up activities
  • Attributing changes to the engineering design with respect to the site conditions
  • Prepare for and attend Daily and Weekly construction meetings with client.

Plant Engineer

Kondody Autocraft India PVT. LTD
02.2015 - 02.2016
  • In charge of all the activities involved in the first stage of Bus body manufacturing
  • Managed 3 supervisors and labors of 24
  • Responsible for maintenance of all equipment in the plant
  • Conducted final inspection after completion of stage 1 installation
  • Coordinate with the design team to modify drawings as per the client's requirements
  • Welder qualification tests and welding inspections
  • Preparation of Bill of Quantity (BOQ).

Mechanical Engineer

Skytech Engineering PVT. LTD
11.2013 - 12.2014
  • As a mechanical engineer I was responsible for ensuring all the installations were as per the drawings
  • The works were rectification of 2.6m underground waste water pipeline which already has been installed
  • Preparation of work method statement, job safety analysis, material procurement, verification of cutting plans, welders qualification tests, dye penetrant tests, Radiography tests, lifting plans, work schedule plans, and meetings with clients, were my responsibilities
  • Analytical thinking, teamwork and clear communication, strong leadership skills, and willingness to learn were the prime factors that I applied throughout the project.

Quantity Surveyor

ALSADA Engineering Co
10.2012 - 09.2013
  • Prepared Quotations to Clients for various works such as Handrails, Gates, Fences, Automatic sliding gates, Gratings, Car ports, Plastic Factory structures
  • Done regular site visits to the awarded works to monitor the progress and attended meetings with the clients
  • Contacted various parties to get the rates for quoting purposes
  • Knowledge in fabrication and welding helped to quote the best price and I have won many works and finished with in the budget
  • Preparation of Bill of Quantity
  • Coordinating with draftsperson for Tekla drawings.

Site Engineer

R S Engineering PVT. LTD
03.2011 - 09.2012
  • In this project my responsibility were installation of steel structures and chimney
  • My responsibility in the plant was execute the construction of 275 m high chimney (steel flue cans and Cooling water pump house
  • I started taking charge of the fabrication shop as all the materials were required to fabricate at the plant itself, including the flue and the structures
  • Along with the execution of flue can installation, I was the in charge of the installation of pipe rack and Cooling water pump house installation
  • Starting from preparation of work method statement, job safety analysis, material procurement, verification of cutting plans, welders qualification tests, dye penetrant test, Radiography tests, lifting plans, work schedule plan, meetings with clients, were my responsibilities
  • After receiving the drawings from client, I prepared total schedule and manpower requirement for the project for the completion within the time frame
  • Submit daily progress reports on the progress of work
  • Take the total quantity of welding electrode required and Conduct welder qualification test
  • Coordinate with NDT department for Radiography test and ultrasonic tests for all the weld joints, as per the project requirements
  • Conduct meeting with subcontractors for finalizing the quotes and assigning the scope of work along with the contracts team
  • Verify the rolling and diameter after fit-up are as per the drawing
  • Conduct Dye penetrant test for the weld joints of structure beams and flue cans
  • Execute the installation within the time frame within the safety parameters
  • Preparation of lifting plans before the commencement of the rigging activities and obtaining approval from the clients.

Education

PG Diploma in Construction Management (Quantity Surveying) -

Massey University

Bachelor of Technology in Mechanical engineering -

MG university
03.2011

Skills

  • Quality Assurance
  • Project Management
  • Supervision and crew management
  • Billing and RFI
  • Safe work practices
  • Alignment of rotary equipment
  • CAD
  • On-site inspections
  • Cost Estimation
  • Metal Fabrication
  • Microsoft Excel
  • Scheduling and Planning
  • Contract Administration
  • Cost Control
  • Materials Procurement
  • Subcontractor supervision
  • Decision-Making
  • Site Inspection
  • Problem-solving abilities

Personal Qualifications

  • Welding & Fabrication
  • Critical Thinking
  • Excellent drawing knowledge
  • Cost estimation
  • WMS and lifting plan creation
  • Rigging and lifting
  • Tekla structures (basic)

Australian Visa Status

Permanent Residency: Skilled Independent(subclass-189)

Disclaimer

I hereby state that all statements made in this resume are true and correct to my knowledge and belief.

Timeline

Mechanical Engineer

NBTC- Oil & Gas Construction Co
02.2016 - 01.2020

Plant Engineer

Kondody Autocraft India PVT. LTD
02.2015 - 02.2016

Mechanical Engineer

Skytech Engineering PVT. LTD
11.2013 - 12.2014

Quantity Surveyor

ALSADA Engineering Co
10.2012 - 09.2013

Site Engineer

R S Engineering PVT. LTD
03.2011 - 09.2012

PG Diploma in Construction Management (Quantity Surveying) -

Massey University

Bachelor of Technology in Mechanical engineering -

MG university
Nivin Johny Pokkidiyil