Seventeen years of extensive experience in Project Engineering, Procurement, and Construction with in-depth knowledge of design, supervision, execution, commissioning, and project management of Electromechanical projects
Overview
16
16
years of professional experience
1
1
Certification
Work History
Applications Engineer
SMARDT CHILLERS PTY LTD (AUSTRALIA)
05.2023
Senior HVAC Engineer
M/s KCCEC. WLL. (Kuwait)
01.2022 - 12.2022
Snr. HVAC Engineer (Supervision Consultant)
M/s SSH CONSULTANT. WLL. (Kuwait)
01.2022 - 06.2022
Senior HVAC Engineer / Assistant Construction Manager
M/s Sayed Hamid Behbehani & Sons Co. WLL. (Kuwait)
01.2020 - 12.2021
Specialist - HVAC
M/s Alghanim Engineering Gen. Trad & Cont. (Kuwait)
01.2018 - 01.2020
Snr. HVAC Project Engineer
M/s Nasser Al Baddah & Traders Co (NBTC). (Kuwait)
03.2014 - 01.2018
Mechanical Project Engineer (HVAC/Plumbing Fire Fighting)
M/s Bader Al Mulla & Bros Co. W.L.L.(Kuwait)
01.2012 - 02.2014
Mechanical Project Engineer (HVAC/Plumbing Fire Fighting)
M/s Kazema Engineering Projects W.L.L.(Kuwait)
03.2007 - 06.2012
Skills
Project Management
Supervision
Execution and commissioning
Team Building and Leadership
Strong negotiation skills with suppliers
Designing of HVAC systems using carrier CAMEL software with equipment finalization
HVAC Calculations like pump head, duct static pressure and smoke ventilation system
Familiar with Daikin selection program to select complete DX system as VRV, single split unit, multi split unit and rooftop package unit with all associated controls
Project Estimation and tendering
Certification
PMP
MIEAust CPEng NER APEC Engineer IntPE(Aus)
RPEQ
RPEV
PE
CEng(India)
Project Management Professional- PMP from PMI- USA
Chartered Professional Engineer (CPEng) by Engineers Australia
APEC Engineer and IntPE(Aus) by Engineers Australia
Registered Professional Engineers Queensland (RPEQ)
Registered Professional Engineers Victoria (RPEV)
Chartered Engineer CEng (India) by Institution of Engineers (India)
Certified Professional Engineer (PE) by Engineers Chartering Council (Kuwait society of engineers)
Affiliations
ASHRAE (MBR # 8453055)
Engineers Australia (EA ID-8451826)
Project Management Institute (PMI) – USA, (ID# 7632490)
Institution of Engineers (India), M-1765218
Kuwait Society of Engineers (22447)
Academic Qualification
B.E. in Mechanical from Mumbai University with first class (2002-2006).
Client Consultant Approval
Ajial Real estate & entertainment as Consultant (Snr. HVAC Engineer) from SSH Side.
Registered Mechanical Engineer in Kuwait municipality for engineering consulting office
Ministry of Health (MOH) as Senior HVAC Engineer
Ministry of Public Works (MPW) as HVAC Engineer
Gulf Consult as Senior HVAC Engineer
PACE as an HVAC Engineer
Kuwait University as an HVAC Project Engineer.
Ministry of Electricity and Water (MEW) as an HVAC Project Engineer.
Diwan Al Amiri as Mechanical Engineer.
Joint Operations (Oil and Gas) as an HVAC Site Engineer & QA/QC Engineer.
Roles And Responsibilities
Assisting project manager in preparing project management plan from project initiation to project closing phase.
Preparing and finalizing cost and budget estimates, project schedule, resource management, procurement, quality policy, risk assessment.
Assigning jobs to subordinates to finalize work breakdown structure.
Experience in handling conflict management.
Experience of preparing resource plan, budgets, and scheduling
Experience of finalizing and documenting project requirements, key accountabilities, and milestones.
Complete knowledge of project management tools and skills
Experience in defining and managing project scope including resource requirements and defining roles.
Arranging & coordinating biweekly meetings with client, site management team for work progress.
Preparing and submitting all project management reports and schedules for management review
Handling and managing all Procurement of equipment and materials, follow up & coordination with procurement department for releasing purchase orders and delivery.
Reviewing design drawings, equipment schedules, riser schematics and specifications and raising any discrepancies to the owner or design consultant.
Producing shop drawings, composite drawings, riser schematics based on all design documents and to submit this to consultant and owner for approval to carry out work at site.
Finalizing and preparing material submittals, shop drawings for HVAC (Ducting, piping, smoke) for onward submission to client/consultant.
Directing the supervisor, draftsman and subordinates for material take off for ducting, piping, valves and all air side and water side materials and equipment and rechecking them with issued Bill of quantity.
Verifying Heat Load, static pressure for fans & AHU, Verifying pump head calculation, Smoke Ventilation requirements.
Preparing and submitting monthly progress payments for the work done at site to client and then to follow up for their approval.
Managing complete site activities like installation of equipment, piping, ducting by delegating the work and task to site team, subordinates and coordinating with senior engineers, client/consultant, contractor & Subcontractor for progress of work and inspection at site
Managing and coordinating HVAC electrical work Viz Installation of MCC, control panels, Switch Fuse, VAV Transformers & Transformer boxes, Power socket, Cable tray, Thermostat conduiting, conduiting for power supply to equipment, power cabling, earthing of equipment, DDC Looping, temperature & pressure sensors and complete HVAC BMS & control systems.
Directing the foreman and junior site engineers for carrying out specific installation work.
Meeting regularly with consultants, client and subcontractor of other trades for any coordination issues.
Follow up with Kuwait Fire brigade Department and Ministry of Electricity & Water in order to get authority approvals for drawings and material.
Supervising the installation work of MEP Subcontractor by inspecting site work installation and taking necessary action on work installation checklist.
Reviewing material submittal for the equipment and materials submitted by MEP contractor against specification and design equipment schedule.
Reviewing RFI (Request for information) raised by contractor in order to resolve particular issue and to reply it accordingly.
Reviewing Shop drawing, composite drawing, As built drawing against design drawing.
Reviewing work progress of subcontractor and accordingly approving their progress payments.
Calculation of Heat Load using Carrier HAP (Hourly Analysis Programme) software.
Finalizing equipment capacities of HVAC equipment based on load calculation like Chiller Capacities in, Pumping capacities of Chilled water system, Condenser water system, Cooling tower, Air Handling units etc.
Doing design coordination with Architect, structural and civil services.
Guiding and assisting juniors in design works thus building the design team for future jobs.
Finalizing equipment schedule, riser schematics, and design-drawing layout.
Finalizing equipment capacities of HVAC equipment based on load calculation like Chiller Capacities , Pumping capacities of Chilled water system, Condenser water system, Cooling tower, Air Handling units etc.
Calculation of static pressure for fans, AHU based on which motor KW shall be decided.
Pump head calculation for the pumps in order to select the pumps at specified flow and calculated pump head.
Smoke Ventilation calculation as per NFPA requirements in order to finalize the capacities of smoke fans, smoke fresh air fans, elevator and stair case pressurization fans.
Finalizing design drawings for ducting and piping. Doing pipe and duct sizing using SMACNA duct calculator and Mc quay pipe sizing calculator.
Finalizing project specification for materials and equipment.
Doing design coordination with Architect, structural, electrical and civil services.
Finalizing sequence of operation for the complete HVAC system, which includes, chiller sequencing, chilled water and condenser water pumps operation and modulation of all Airside water equipment based on load demand.
Finalizing and preparing BMS points in coordination with BMS team based on the finalized sequence of operation.
Reviewing electrical, BMS drawings and submittals especially MCC’s and control panels for any comments in coordination with electrical & BMS team.
Following ASHRAE and SMACNA standards while designing the HVAC system.
Design of Fire Fighting & Plumbing system using NFPA and International plumbing codes
Handling Commissioning activities of HVAC system like finalizing TAB subcontractor, submitting method of statement for TAB, preparing start up and commissioning procedures of Chillers, Pumps, Cooling towers, Air Handling Units, Fans etc.
Coordinating and arranging site visits by all the equipment suppliers in order to prepare for startup and commissioning of equipment.
Coordinating and supervising the TAB team for Water Side and Air Side Balancing, operation of BMS and Control system as per approved sequence of operation.
Commissioning of Plumbing and Fire Fighting System.
Complete Study & preparation for the tender documentation queries to consultants to confirm/collect any missing data, shipping costs, insurance etc.
Familiar with generating Bill of Quantity against drawings to ensure /identify material types, quantities & prepare equipment lists for cost estimation.
Floating inquiries to various suppliers.
Familiar with the negotiation of prices, based upon careful study of specification, BOQ & Addendum.
Monitors carefully various changes in drawings, BOQ, Addendum etc. Negotiation with client and consultant to finalize the bid.
Timeline
Applications Engineer
SMARDT CHILLERS PTY LTD (AUSTRALIA)
05.2023
Senior HVAC Engineer
M/s KCCEC. WLL. (Kuwait)
01.2022 - 12.2022
Snr. HVAC Engineer (Supervision Consultant)
M/s SSH CONSULTANT. WLL. (Kuwait)
01.2022 - 06.2022
Senior HVAC Engineer / Assistant Construction Manager
M/s Sayed Hamid Behbehani & Sons Co. WLL. (Kuwait)
01.2020 - 12.2021
Specialist - HVAC
M/s Alghanim Engineering Gen. Trad & Cont. (Kuwait)
01.2018 - 01.2020
Snr. HVAC Project Engineer
M/s Nasser Al Baddah & Traders Co (NBTC). (Kuwait)
03.2014 - 01.2018
Mechanical Project Engineer (HVAC/Plumbing Fire Fighting)
M/s Bader Al Mulla & Bros Co. W.L.L.(Kuwait)
01.2012 - 02.2014
Mechanical Project Engineer (HVAC/Plumbing Fire Fighting)