Accomplished Steelfixer and EWP Operator with a proven track record at Creteform Pty Ltd, demonstrating expertise in blueprint reading and reinforcement placement and elevated work platform driving 2 years experience. Skilled in enhancing project efficiency and structural integrity, with a strong focus on construction safety and effective team communication. Achieved significant productivity improvements, showcasing both technical proficiency and leadership capabilities.
Overview
6
6
years of professional experience
1
1
Certification
Work History
Steelfixer and EWP Operator
Creteform Pty Ltd
Western Sydney Airport, Haberfield And PBR Tunnel
01.2022 - Current
Tied rebar into wire mesh formations using welding, wiring, and clipping techniques.
Studied blueprints and specification drawings to determine project requirements.
Operated hand and power tools safely to prepare materials.
Improved project efficiency by accurately reading and interpreting steel fixing plans and blueprints.
Ensured structural integrity by maintaining correct spacing between steel bars and ties according to specifications.
Increased productivity through effective communication with team members and supervisors on project progress and potential issues.
Maintained a positive attitude while working in challenging weather conditions and managing physically demanding tasks, leading to increased team morale and productivity.
Achieved high-quality results within tight deadlines while adhering to budget constraints on multiple projects simultaneously.
Collaborated with other tradespeople to coordinate work schedules and maintain seamless workflow on construction sites.
Read and interpreted blueprints and work plans for each job.
Connected prefabricated steel pieces using rivets and welds.
Reduced material waste by meticulously measuring, cutting, bending, shaping, and welding reinforcement materials as needed.
Supported a positive work environment through active participation in safety meetings, toolbox talks, and ongoing training programs.
Built and installed iron and steel girders, columns and other construction materials to form buildings, bridges and other structures.
Maintained a safe working environment by enforcing strict adherence to safety guidelines and protocols.
Operated various types of machinery, demonstrating versatility and adaptability in diverse work environments.
Steelfixer
Carrabay Reo Pty Ltd
WestConnex M5 And St Peters, NorthConnex Tunnel
10.2018 - 01.2022
Tied rebar into wire mesh formations using welding, wiring, and clipping techniques.
Studied blueprints and specification drawings to determine project requirements.
Operated hand and power tools safely to prepare materials.
Improved project efficiency by accurately reading and interpreting steel fixing plans and blueprints.
Ensured structural integrity by maintaining correct spacing between steel bars and ties according to specifications.
Increased productivity through effective communication with team members and supervisors on project progress and potential issues.
Enhanced worksite safety by diligently following guidelines, regulations, and wearing appropriate personal protective equipment.