
Site engineer with extensive experience in engineering projects. Proven ability to coordinate effectively with vendors and clients to ensure project success. Skilled in developing budget plans and technical documentation. Strong organizational and analytical skills drive project efficiency.
Reference will be provided on request.
Title: MIEAust
Site Engineer, Subdivision works and bulk earthworks at the Summerstone project in Morayfield, ensuring compliance with drawings, specifications, and safety standards., Coordinated daily activities with subcontractors and plant operators to deliver efficient and timely progress on earthwork operations., Oversaw procurement of materials and equipment, ensuring cost control within budget limits., Prepared and reviewed SWMS (Safe Work Method Statements) for subcontractor onboarding, promoting safe and compliant work practices., Conducted DSS (Daily Site Safety) briefings, entered daily production records, and maintained accurate tracking of site progress., Checked plant inductions, maintained plant documentation, and ensured compliance with operational requirements., Managed and updated the SDS (Safety Data Sheet) register for all hazardous materials on site., Conducted weekly site inspections and actively participated in fortnightly project meetings with stakeholders to report progress and resolve issues., Assisted with cost tracking, scheduling, and client reporting, in line with Pensar-style project management practices., Summer stone stage 13- Clark Road expansion, Moray field, Summer stone stage 14 to 18- Subdivision, Moray field, Tae Pocket Stage 1 to 3- Subdivision, Moray field, Summer stone stage 19 to 21- Bulk Earthworks, Moray field, Site Engineer, Lead site supervision for major construction projects, ensuring adherence to project timelines, budgets, and specifications., Managed day-to-day operations on-site, coordinating with contractors, subcontractors, and vendors to ensure smooth workflow., Conducted regular site inspections, identifying and addressing issues related to safety, quality, and compliance with project specifications., Produced detailed progress reports, ensuring timely communication of project status to senior management and stakeholders., Supervised quality control measures for materials, workmanship, and safety standards on site, achieving zero site incident., Collaborated with the design team to resolve technical issues and recommend changes to improve design and construction methods., Collected and analysed detailed quotations to ensure project work was completed within budget constraints., Developed two-week look-ahead programs and performed quantity take-off in advance to optimize project planning., Managed site diary and tracked daily costs for labour, subcontractors, and materials to maintain budget oversight., Attended weekly meetings with clients and internal project teams to discuss progress and resolve any project challenges., Uploaded daily activity reports to Procore and ensured timely submission of accurate reports to the client., Prepared and implemented comprehensive management plans, including Project Management Plan, Traffic Management Plan, HSEMP, and Quality Management Plan., Port North (PNCUB) Upgrade- Port of Brisbane, SEQ Water sed construction- Somerset, Site Engineer, Ensure all work complies with project drawings, technical specifications, and tender documentation., Prepare and submit daily activity reports to the client, ensuring accurate and timely communication., Verify that all hold and witness points are released in accordance with the approved Inspection and Test Plan (ITP) before commencing any work., Raise and maintain Requests for Information (RFI), Variation, Extension of Time (EOT), and delay registers to track project changes and delays effectively., Manage material stock levels and procurement registers to ensure timely availability of resources., Attend regular weekly meetings with clients to discuss project progress and address any concerns., Participate in daily pre-start meetings and toolbox talks to promote safety and operational readiness., Assist the Project Manager with the preparation and submission of monthly progress claims, ensuring accurate documentation and billing., Prepare site-specific Safe Work Method Statements (SWMS), Pre-Task Assessments (PTAs), and Risk Assessments for all activities to maintain safety compliance., Conduct weekly site inspections to ensure environmental and safety measures are implemented correctly and consistently., Review and update project drawings and transmittal., Liaise with different stakeholders to get a regular update on project progress., Lithgow road stabilization work via soil nailing and shotcrete, NSW, Site Engineer, Work closely with the project team in order to ensure compliance with project specification and internal processes., Assist with program development and tracking project progress., Review structural engineering design, specification and contract documents., Quantity take offs and order the materials for each project., Organize and liaise with subcontractors on a daily basis., Prepare an estimate for the new projects., Supervision and inspection of the construction to assure it is done in full accordance with the plans and specifications., Negotiation and Coordination with stakeholders and subcontractors to deliver the project in a timely manner., Organizing the progress meetings with subcontractors and prepare the minutes of meetings., Maintained daily site records and monitored the progress of construction works on a daily basis., Construction of 6 townhouses at Fitzgibbon, Brisbane, Construction of the architectural customized house at Coopers Plains, Convert single story house into two story with open terrace at Gold Coast, Partially demolition and construction of the heritage listed character house in Brisbane city., India, Civil Site Engineer, Review the structural, architectural, drainage and civil works drawings for the project., Preparation of BBS (Bar Bending Schedule) sheet., Allocating special tasks to subcontractors., Supervision of construction work., Prepare the construction work schedule and update the schedule after each activity to track the progress of the project., Keep track of the daily usage of the materials and procurement of the material for the next activity., Assuring that the placement of the reinforcement for the structural components are as per the structural design and within the allowable tolerances before the pour., Maintain the daily shift record for the work progressed for the day and material usage., Organise the required tests and keep record of the test performed as per the specification after each activity., Construction of 3 storey building., Construction of 4 townhouses including earthwork and civil works.