Dedicated Leading Hand / Carpenter with 10 years experience in Carpentry and Joinery Exceptional finish Carpentry skills Construction. Conscientious Carpenter focused & Safely completing projects on time and exceeding client expectations. Certified Advanced Poly Welder. Focused Supervisor / Poly welder with 6 years experience at welding pipe, fittings, flanges and couplings. Fast learner who is highly results-driven Butt Welding & Electro fusion Basic Plumbing knowledge Heavy equipment operation Certified Permit to work Holder Certified Plant & equipment Weed & Seed Inspections. Hydro Technician / Service Person with 3 years experience Testing Pipes, Valves, Hoses Filled pipe systems with water and air to determine whether the system was leaking. Pipe line Air Blowing and pigging, Dry-cleaning. Pipe fitting & valve Reinstatement plus Flange management ITR & FMU +Torqueing. Operations of plant and equipment 3-years High risk work Dogging, Forklift, EWP, Excavator, and Bob Cat, Front-end loader HR License.
Overview
32
32
years of professional experience
1
1
Certification
Work History
Asia Pacific Piping Systems
01.2023 - Current
Site Supervision of pipeline and fittings for dewatering mine Bore infrastructure, including interaction with mining productions.
Leading Hand Advanced Poly welder
Lean Field Developments
, QLD
01.2015 - 12.2015
Leading Hand Poly welder reporting to site Supervisor keeping up to date site production and site materials for installation of Gas Gathering leases.
Operated heavy equipment, including loaders, Excavator, Preform Dogging duties high risk work.
Testing Pipes, Valves, Hoses filled pipe systems with water and air to determine whether the system was leaking.
Pipe line Air Blowing and pigging, Dry-cleaning pipe fitting & valve Reinstatement plus Flange management ITR & FMU +Torqueing.
Poly welder / Operator
Total Poly Servicers
Perth, Australia
01.2014 - 12.2015
Crew Leader at FMG Dewatering Project welding to Bore connections & main line pipe of 110 to 630 mm pipe welding with T900 McElroy Dixon, World Poly, Ritmo Machines.
Installation of valves & Flow meters Plus flange Management.
Operate Front Loader, Excavators To hold pipe and Back fill and earth moving.
Leading Hand / Poly welder
Project Plant Rental
Loganholme, Australia
01.2012 - 12.2014
Leading Hand. Poly welder, Operator + Dogging for QGC Coal Seam Gas Pipe Line Gathering Project Qld.
Worked with certified pipe welders by providing accurate pipe preparation and fitting butt weld & Electro fusion.
Using McElroy track stars 618- 412, T900, fast fusion with Data logger weld logging.
EF welding 42mm up to 630 and saddle welding up 315mm.
Operated heavy equipment, including, loaders, Excavator, Preform Dogging duties high risk work.