Overview
Work History
Education
Skills
Timeline
Generic

Scott Abaloz

Berwick,VIC

Overview

29
29
years of professional experience

Work History

Shower Screen Installer

Stegbar
12.2001 - 03.2024
  • Inspected installations to check for functionality and maintain customer satisfaction.
  • Laid out materials and system components to prepare for installation.
  • Operated tools, equipment, and machinery according to safety standards.
  • Installed complete systems at new residential and business construction sites.
  • Enhanced customer satisfaction by providing timely and accurate installations.
  • Implemented quality control measures during installations, ensuring that each project met or exceeded client expectations and regulatory standards.
  • Collaborated with team members to ensure smooth workflow and successful project completion.
  • Maintained a safe work environment by strictly adhering to safety protocols and guidelines.
  • Addressed client concerns professionally, demonstrating a commitment to excellent customer service throughout the installation process.
  • Calculated materials and time needed for each job.
  • Conducted thorough pre-installation assessments to identify potential issues and develop solutions in advance.
  • Managed inventory effectively, ensuring all necessary supplies were on hand for each project without excess waste or stockpiling materials.
  • Ensured high-quality results by consistently following manufacturer specifications during installations.
  • Improved installation efficiency by streamlining processes and utilizing time-saving techniques.
  • Reduced callbacks by thoroughly testing installed equipment for proper functionality before leaving the job site.
  • Expedited installation times with efficient scheduling and coordination of resources.
  • Assisted with system design and layout to optimize installations and continuous performance.
  • Completed troubleshooting of malfunctions and diagnosed issues.
  • Trained new installers on best practices and company procedures, fostering a collaborative learning environment that strengthened overall team performance.
  • Troubleshot complex installation issues, leveraging problem-solving skills to devise effective solutions promptly.
  • Continuously updated technical knowledge through professional development opportunities, ensuring expertise in the latest industry trends and technologies.
  • Communicated quickly and accurately with supervisors about problematic sites, missed installations or other issues.
  • Completed projects within budget constraints through careful planning and resource management.
  • Developed and maintained professional relationships with customers and vendors to promote loyalty and referrals.
  • Supported customer satisfaction, providing detailed instructions and demonstrations on proper system operation.
  • Increased repeat business by building strong relationships with clients through exceptional service delivery.
  • Provided detailed documentation of completed work for accurate recordkeeping purposes, facilitating future maintenance or repairs as needed.
  • Assisted in the development of installation guidelines based on industry standards, promoting consistency across all projects while meeting specific client requirements.
  • Used appropriate PPE to reduce risks when working with electrical and communications systems.
  • Streamlined communication among team members, resulting in improved collaboration and increased productivity on the job site.
  • Fixed broken systems with [Type] tools and educated customers on proper use to prevent future mishaps.
  • Contributed to company growth by cross-selling additional products and services during installations when appropriate.
  • Worked with diverse types of weather and ground conditions.
  • Demonstrated to customers proper methods for operating equipment after it had been installed.
  • Maintained strong focus on safety and efficiency to provide comprehensive support to personnel performing skilled repairs.
  • Managed maintenance activities, supervised staff, and inspected equipment.
  • Tended to machines, troubleshot malfunctions and completed basic repairs to keep equipment fully functional and well-maintained.
  • Spread out articles or materials and examined for holes, tears and other defects.
  • Researched and implemented new technologies and equipment.
  • Checked, repaired and repacked survival equipment to meet specifications.
  • Liaised with internal departments to optimize productivity and efficiency.
  • Wrote and revised maintenance procedures.
  • Followed established procedures for inspection of belts, drives and motors, performing needed maintenance.
  • Measured and hemmed curtains, garments, and canvas coverings to size using tape measures.
  • Cleaned stains from fabric or garments using spray guns and cleaning fluid.
  • Stamped grommets into canvas using mallets and punches or eyelet machines.
  • Trimmed cut or torn fabric using scissors or knives and stitched trimmed edges together.
  • Completed preventive maintenance on machines to enhance production and maintain quality.

Shower Screen Installer

Regency
11.2000 - 11.2001

Apprentice Glazier/Subcontractor Shower Screen

Stegbar
11.1994 - 11.2000

Education

No Degree - Year 10 Completion

Lyndhurst Secondary College
Cranbourne, VIC
11.1994

Skills

  • Attention to Detail
  • Time Management
  • Positive Attitude
  • Power Tool Operation
  • Following safety practices
  • Customer Satisfaction
  • Customer Service
  • Equipment Installation
  • Pre-installation Site Prep
  • Equipment Operation
  • Customer Relations
  • Troubleshooting and testing
  • Worksite preparation
  • Worksite Safety and Maintenance
  • Quality Checks
  • Troubleshooting
  • Blueprint Reading
  • Hardware Installation
  • Professional Appearance
  • Safety Procedures
  • Inventory Accountability
  • Hand-Eye Coordination
  • Preventive Maintenance
  • Inventory Oversight
  • Installation updates
  • Residential construction
  • Product Inspection
  • Flooring
  • Construction management
  • Work Orders
  • Electrical Wiring
  • Diagnostics and troubleshooting
  • System repairs
  • Supply Inventory Management
  • Commercial construction experience
  • Residential and commercial installations
  • Estimating abilities
  • Company vehicle maintenance
  • Testing processes
  • Scheduling
  • Site surveys
  • Project estimation and bidding
  • Drywalling
  • Plumbing
  • Equipment Repair
  • Electrical Systems
  • Network setup
  • System Configuration
  • Welding skills
  • Project Management
  • Component Repairs
  • Contract Management
  • Service Documentation
  • Permit coordination
  • Roofing
  • Software Installation
  • Emergency Procedures
  • HVAC Systems
  • Fleet maintenance
  • Stain Removal
  • Textile Repair
  • Heavy Equipment Repair
  • CCTV installation
  • Tool Installation and Alignment
  • Building Maintenance
  • Inventory Management
  • Equipment Troubleshooting
  • Safety Management

Timeline

Shower Screen Installer

Stegbar
12.2001 - 03.2024

Shower Screen Installer

Regency
11.2000 - 11.2001

Apprentice Glazier/Subcontractor Shower Screen

Stegbar
11.1994 - 11.2000

No Degree - Year 10 Completion

Lyndhurst Secondary College
Scott Abaloz