Philaretos is a highly motivated, committed and goal oriented engineer with experience in the following sectors

Management

- SINSW LED Lighting Upgrade Round 1 - 5 State Wide Project Director

- SINSW South Projects - Assistant Project Director

Civil Infrastructure

- Pipeline and Earthworks

- Civil Roadworks

- Civil Community Developments

- RMS Road and Bridge Specifications (TfNSW Spec)

Rail Infrastructure

- Station Upgrade

- Works in Rail Corridor

Structural Works

- Dormitory

- Classroom Refurbishment

- Amenity Blocks

- Footbridges

- Metro Service Buildings

Furthermore, industry specific proficiencies in QA management, HSE, project sequencing and costing have been developed.

Philaretos' Undergraduate Honors Thesis on Construction Sequencing and Optimisation of Nancy-Bird Walton Airport Runway was awarded with Distinction at UNSW.

Overview

5
5
years of professional experience
1
1
Certification

Work History

Assistant Project Director

SINSW
12.2022 - Current

Yanco Agricultural High School

  • Assistant Project Director
  • New dormitory construction
  • Refurbishment of existing dormitories under significant time pressure given consistent occupancy.
  • Experience in multiple contractual disputes over the course of a challenging project

Bletchington and Milnthorpe Public School Upgrades

  • Assistant Project Director
  • Refurbishment of existing class rooms including HVAC, Mechanical, Electric and Water Services, fit out, covered walkways and furnishing.
  • Contract and Stakeholder management
  • Collaboration with AMU to coordinate roof replacement

LED Lighting Upgrade Program (LUP)

  • Acting Project Director for Sydney Metro Region and later, NSW Round 1 - 5 LED School Upgrades under LED Lighting Upgrade Program.
  • Management of a team of 3 Project Officers, reporting to a Senior Project Director for a scope of 350 schools.
  • Developed and oversaw project operations and managed multi-functional issues through resolution.
  • Monthly cost forecasting, T-Reign variation management and claim approval.
  • Oversaw business operations and produced updated status reports outlining each project to meet milestones.
  • Monitored project and program quality to meet budget and completion expectations
  • WHS incident management and SAS CAR close out

Project Engineer

Haslin Constructions
07.2021 - 12.2022

Canterbury and Lakemba Metro Station Upgrade ($34.7m)

- Project Engineer delivering Metro Service Building at Canterbury Station reporting directly to Senior Project Engineer

- Responsible for full QA packages and 4 week programming of building scope including

  • Civil Works (Drainage, Sewer and Earthworks)
  • Combined Service Route
  • Structural Concrete
  • Precast Transfloor
  • Structural Steel

- Comparison and procurement of subcontractors, materials and plant

- Performed cost reporting and invoicing

- Safety assessment and methodology composition and review

- Review and assessment of shop drawings

- Submission of RFIs and transmittals to client regarding directly responsible scope

Lakemba Station Metro Upgrade ($15.2 million)

- Transition to Works in the Rail Corridor

- Developed cost estimates for planned projects to aid in costing and budget planning efforts.

- Programming for Weekend Shutdowns, 4 Week Look Ahead and 2 Week Shutdown

- Delivery of Earthworks and Piling of Lakemba Metro Service Building

- Coordination and management of 5 subcontractors within 1 integrated worksite

Narara Station TAP - Goonak Pde Carpark ($11.2 million)

- Implementation of Civil knowledge in self-contained scope.

- Delivery of 1,325 sqm carpark reporting directly to PM

- Completion of QA requirements

- Delivery of safety requirements


Site Engineer

Ertech Pty Ltd
12.2020 - 07.2021

M6 Stage 1 ($34m)

As a Site Engineer, Philaretos' responsibilities both on site and within the project team increased significantly, facilitating further growth and development in;

  • Quality Assurance, Non-Conformance Reporting and Lot Management
  • Concrete pours of up to 120 cubes
  • Modification of proposed design services interacting with existing.
  • Subcontractor procurement and management
  • Weekly and 3-week project programming
  • Site crews of over 80 people
  • Some community liaison responsibilities
  • Drafting of Traffic Control Plans
  • SWMS reviews and composition
  • HSEQ internal and client audits
  • Site Inductions
  • Introduction to Contract Valuation and Monthly Claim reporting

Junior Estimator

Ertech
02.2020 - 04.2020

Involved in the successful tender for Heathcote Road Upgrade including the pricing of:

- Piling

- Soil Nails

- Retaining Walls

- Landscaping

- Full Road stratum

- Drainage

- 2 Road Bridges

- 1 Rail Bridge

Undergraduate Engineer

Ertech Pty Ltd
03.2019 - 12.2020

Smithfield Road Upgrade ($13.1 million)


Quality Assurance, Non-Conformance Reporting and Lot Management

  • Concrete pours of up to 70 cubes
  • Modification of proposed design services interacting with existing.
  • Subcontractor procurement and management including Utilities Relocation and Installation, Stormwater, Concrete and Asphalting.
  • Weekly and 3-week project programming
  • Site crews of over 30 people
  • Some community liaison responsibilities
  • Liaising with Council Client Representative
  • Drafting of Traffic Control Plans
  • SWMS reviews and composition
  • HSEQ internal and client audits
  • Site Inductions


Warragamba Pipleline Stage 2 Civil Works ($15.6 million)

In Philaretos' first civil project, core site engineer skills were developed:

  • Quality Assurance
  • Weekly and 3-week programming
  • Subcontractor quote comparison and procurement
  • Client interaction and design variation
  • ISO accreditation audit
  • Works As Executed reporting
  • Productivity analysis and optimisation
  • Safety Inspections
  • Site Inductions
  • Incident investigation and reporting
  • Task Inspections

Education

Bachelor of Civil Engineering (Honours) -

University of New South Wales
Sydney, NSW
2020

High School Certificate - undefined

Penrith Selective High School
Penrith, NSW
2015

Certification

BE(Civl) (Hon) UNSW 2020

Working Near Overhead Power (5099)

First Aid

CPR

WH&S General Construction Induction

Civil and Environmental Engineering Society

  • Management of a 6 person subcommittee
  • Lead Oraganiser of $23,000 student cruise resulting in 19% margin
  • Co-ordination, mentoring and leadership skills developed as Lead Organiser of 2019 Professional Development Retreat
  • Costing, tendering and presentation skills developed through CPB Case Competition

References

Mark Albert - SINSW- Contact Details Upon Request

Natalie Harris - SINSW - Contact Details Upon Request

Jeremy Stott - SINSW - Contact Details Upon Request

Timeline

Assistant Project Director

SINSW
12.2022 - Current

Project Engineer

Haslin Constructions
07.2021 - 12.2022

Site Engineer

Ertech Pty Ltd
12.2020 - 07.2021

Junior Estimator

Ertech
02.2020 - 04.2020

Undergraduate Engineer

Ertech Pty Ltd
03.2019 - 12.2020

Bachelor of Civil Engineering (Honours) -

University of New South Wales

High School Certificate - undefined

Penrith Selective High School
Philaretos Stylianides