Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic
Prachi Bag

Prachi Bag

Westmead,NSW

Summary

Enthusiastic Operations Associate currently working with Macquarie Bank Limited with a strong experience in process improvement and project management . I am analytically proficient and have a keen attention to detail. My stakeholder management skills coupled with my ability to solve complex problems using my analytical skills developed from my engineering background help me add value to every project I work on.

Overview

4
4
years of professional experience

Work History

OPERATIONS ASSOCIATE

BANKING AND FINANCIAL SERVICES, BFS
  • Worked as an associate in car loans operations
  • Worked on remediations and troubleshooting projects which require investigation and analytical thinking for resolving the breaks
  • Taken initiatives for process improvement which would reduce current time and risk involved in the process
  • Worked on projects with different teams to design tool for automation of critical processes which would reduce the time needed and risk involved in a process
  • Worked on testing the tools designed and releasing the tools which would help save time
  • Worked with the reconciliation teams to resolve breaks and investigate issues related to critical processes
  • Worked on projects that involve designing a platform for learning which would help save training time for a new starter
  • Worked in the social group to organize different events and social activities to encourage networking and improve team bonding and building
  • Have a keen attention to detail and finance knowledge.

ASSISTANT MANAGER

PENTA DESIGNERS & ENGINEERS PVT.LTD.
01.2018 - 07.2019
  • Started as a Design Engineer trainee in the Assembly Line Design Team
  • Promoted twice in 1.5 years as Design Engineer and Assistant Manager
  • Worked on different design projects from companies like Thyssen Krupp, Pari, Global and Jenda Mark
  • Team Leader - Client - Hanne Welding Systems (March 2018 - July 2019) This project was to design an assembly line to produce Spiral Welded Pipes
  • It was an extensive project with 11 modules involving examining the existing line and then designing a more efficient solution
  • The design was for an advance SWP machine system which was portable in some form
  • Client - PARI Robotics (May 2018 - Sept2018) This project was to transport finished goods from manufacturing place to dispatch
  • It involved designing a finish shuttle and shuttle drive
  • The design to detailing of this project was done by my team
  • Client - Hanne Welding Systems (March 2018- May 2018) This was a design validation project in which we had to validate the design of a transportable pipe manufacturing assembly line
  • In this project my role included understanding of the existing design and to come up with solutions to improve working and efficiency
  • It also involved presenting the finished design to the client
  • Client - Thyssen Krupp (March 2018 - April 2018) This was a design project which involved designing of frame structures for the assembly line
  • We also designed three position slides for checking if the components are in the right position
  • Client - Jenda Mark (Jan 2018 -March 2018) In this project we designed racks for inventory with sensor provision for safety and advanced light curtains
  • In this project we also designed a gripper for picking up component (differential gear) from station and place them on the pallet in unloading trolley.

INTERN

FAURECIA INTERIORS PVT.LTD.
11.2015 - 06.2017
  • Worked as an Intern in the innovation department (research and development) (Project 1) Scope of work: This project was to develop and improve current armrest system with memory settings
  • We collaborated with electronic module supplier to program Arduino with sensors and designed a working model of an armrest that could move in +X, +Y and +Z direction
  • (Project 2) Scope of work: Working on development of electronic glove box system
  • Our aim was to make a cost-effective system using a combination of I.R sensor and simple mono point latch mechanism
  • We successfully made a prototype which was then sent for further development.

Education

BACHELOR OF MECHANICAL ENGINEERING -

UNIVERSITY OF PUNE
01.2018

Skills

  • Proficient with Microsoft Office Suit (Word, Excel, PowerPoint)
  • Worked on InfoLease, Info view ,I- portal
  • Operations Management
  • Verbal and Written Communication
  • Project Ma
  • Project Management
  • Procedure Development
  • Process Enhancements and Revisions
  • Quality Control Analysis
  • Issue Researching and Resolution
  • Process Improvements
  • Worked on software like Inventor, Solid works, Solid Edge, Bricks cad
  • Basic knowledge of Catia, Unigraphics and AutoCAD
  • Confident verbal communication skills Experienced in organizing and conducting training sessions for team members and other colleagues
  • Excellent written communication skills
  • Superior command of English Fluent in Hindi and Marathi
  • Experienced in leading a team for different projects
  • Experienced with assigning duties to team members as well as ensuring quality of work
  • Capable of sound decision making as well as working alone if needed
  • Capable of collaborating with different stakeholders to resolve issues using analytical thinking and problem-solving skill
  • Accustomed to working as a part of a larger team Following directions and accomplishing assigned tasks efficiently and accurately
  • Experience in interacting with different clients and achieving problem resolution as efficiently as possible
  • Experienced in collaborating with team members and different teams for certain projects

Languages

English
Full Professional
Hindi
Native/ Bilingual
Marathi
Native/ Bilingual

Timeline

ASSISTANT MANAGER

PENTA DESIGNERS & ENGINEERS PVT.LTD.
01.2018 - 07.2019

INTERN

FAURECIA INTERIORS PVT.LTD.
11.2015 - 06.2017

OPERATIONS ASSOCIATE

BANKING AND FINANCIAL SERVICES, BFS

BACHELOR OF MECHANICAL ENGINEERING -

UNIVERSITY OF PUNE
Prachi Bag