Summary
Overview
Work History
Education
Skills
Timeline
Generic

Pramod Pawar

Melonba,NSW

Summary

I am Detail-oriented efficient and organised professional with extensive experience in Production,Customer services and Project field works. Possess strong analytical and problem solving skills, with the ability to make well thought out decisions. Highly trustworthy, discreet and ethical, resourceful in the completion of projects and effective at multi-tasking.

Overview

13
13
years of professional experience

Work History

Machine Operator, Machine Setting, Forklift Operator, Quality Checking

Rondo Building Services
01.2018 - 05.2019
  • Operate Dallan roll former machine
  • Machine setting, Operate power tools
  • Check all the parameter of raw material and finish material as per drawing
  • Make inspection report
  • Operate 2.50 Ton to 3.5 Ton LF Forklift
  • Loading and unloading the materials from Machine
  • Repetitively manual lifting 10Kg, Some manual lifting up to 20 kg
  • Keeping the Work area tidy and hazard free
  • Work in Safety
  • I have Australian driving license and my own car
  • I have LF forklift license

Machine Operator, Overhead crane Operator, Forklift, Side loader Truck operator and quality checking

BEST BAR INDUSTRIES
08.2013 - 01.2018
  • Operate MEP CNC OFF COIL machine
  • Operate power tools
  • Check the plan for manufacturing of cage
  • Give work to the person as per plan
  • Provide material as per plan to machine
  • Check all the parameter of raw material and finish material as per drawing
  • Make inspection report
  • Operate 2.50ton to 7.5 Ton LF Forklift, 7 Ton Side loader truck and manual pallet trolley
  • Loading and unloading the materials from Machine, warehouse and trucks with the help of overhead crane and forklift
  • Load empty container on truck
  • Some manual lifting up to 20 kg
  • Keeping the Store/Warehouse tidy and hazard free
  • I have Australian driving license and my own car.

Machine Operator and Forklift Operator

FOAMCO INDUSTRIES MINTO
09.2012 - 07.2013
  • Operate Carosel machine, do general maintenance of the machine
  • Operate Balling machine
  • Help to packing of materials
  • Operate power tools
  • Operate LF Forklift and manual pallet trolley
  • Loading and unloading the goods from Machine and warehouse
  • Some manual lifting up to 20 kg of the bun
  • Keeping the Store/Warehouse tidy and hazard free.

IRON MOUNTAIN
07.2023 - 09.2012
  • Operate paper shredding machine
  • Conveyor belt system, do general maintenance of the machine
  • Operate power tools
  • Operate LF Forklift and manual pallet trolley
  • Loading and unloading the goods from vehicles
  • Some manual lifting up to 20 kg of the boxes
  • Pick and pack orders in an accurate and timely manner
  • Sorting of papers, plastic, glass
  • Keeping the Store/Warehouse tidy and hazard free.

Causal on call

TMS GROUP PVT. LTD.
03.2012 - 07.2012
  • Make assembly of corrugated boxes for CD and DVD as per requirements
  • Operate power tools; operate LF forklift, electric pallet trolley and manual pallet trolley
  • Packing, Labeling, Loading and unloading the goods from vehicles
  • Taking delivery from couriers/freight companies unpacks & checks goods
  • Q.A of final Packaging
  • Pick and pack orders in an accurate and timely manner
  • Send pack order to customer with the allocated courier company using same day or overnight services
  • Put stock away in required reserve storage or pick face
  • Sorting of stock
  • Scanning and Cross Checking stock allocations and Packing
  • Keeping the Store/Warehouse tidy and hazard free.

Field Service Engineer

KOCH CHEMICAL TECHNOLOGY GROUP INDIA PVT. LTD.
06.2010 - 12.2011
  • Live by the Koch's MBM Guiding Principles and apply them to professional and personal life
  • Study the drawing & prepare column wise bar chart according to given time period by Client
  • Close coordination with Client, Contractor and Inspection Agency to monitoring various activities of installation for smooth execution
  • Supervision work at client site
  • Prepare daily progress report and distribute to Client & Inspection Agency
  • Brief about job, schedule, and safety requirement to contractor’s supervisors & Technicians for confined space, lifting, shifting and regarding installation
  • Carry out inspection & Prepare inspection report for all installed items & to offer Client /Inspection agency for Inspection
  • Validate proper installation of KG equipment
  • Prepare site Quality Plan where ever necessary
  • Quick response to client/ contractor for site related queries to get the job in time
  • Prepare final documents like Inspection Report, Job completion & Site closing certificate, getting No due certificate from client store & security dept
  • Contractor running bill, final bill certification
  • Work closely with KOCH Sales representative and customer to evaluate mass transfer internals condition, and find opportunities for KG to replace, with KG equipment
  • Conduct yourself and assist in a Safe work culture
  • Inspect existing KG equipment at customer location
  • Validate the condition of the equipment that has been in service
  • Coordinate inspection points with field service crews
  • Communicate errors and required corrections to the client during installation
  • Work with client to resolve any issues of shortages or delivery during the project
  • Work shoulder to shoulder with the installation crew, in order to make inspection points during the project
  • This requires working a minimum of 12 hour shifts, usually through weekends and holidays
  • Tunnel the column and make final inspection and buy-off as to the installation being with tolerance
  • Stay on site for duration of the project to support order entry, delivery, and equipment shake-out
  • Work for continues improvement for optimum results
  • Set an example through personal behavior that reflects the Koch’s MBM philosophy, vision and principles
  • Walk the Talk
  • Monitor progress of work against planned and take timely corrective actions to ensure timely completion of shutdown / project job
  • Continuously develop and emphasize safety’s being the most important component to KG business
  • Safety of self and all personal at site
  • On time completion of all shutdown jobs
  • Customer satisfaction of the installation supervision jobs
  • Site report on closure of every site activity.

Sr. Project Engineer

ROHDEEP ENGG.
04.2007 - 05.2010
  • Responsible for preparation & documentation of engg
  • Drawings
  • Key core team member in implementation of Projects work
  • Conducting internal safety training
  • Data analysis of Incoming materials, In-process and customer satisfaction
  • Preparation and review of Quality Assurance Plan & Control Plan
  • Responsible for Quality issue
  • Coordinate in Quality improvement projects, pneumatic testing and hydro testing of pipes, Heat exchangers and reactors
  • Quality inspection of Electro-Mechanical Tools like Drilling Machine, Welding machines, Hand grinding machine, Welding Cables, Proper Earthing, Argon torch, Chop saw cutter, Gas cutting set, Chain pulley blocks etc
  • I have golden experience in erection and installation of Static equipments Boilers (FBD,BAGAS,FO), Thermicfluids Boilers,Chimney 10mtr to 60mtr, Fermantors, Heat Exchanger (1ton to 30ton), HP Separator(up to 180 Ton), Receivers ,D.M.Plants, N2Plants, ETP Plants, R
  • O
  • Plants, DCS Systems, Extruder machines, Press machines etc
  • I have golden experience in erection and installation Rotary equipments like Pumps, Moters1.5HP to 3200HP, vacuum pumps, Air compressors, Generator sets, Gear box etc
  • I have golden experience in Fabrication, erection and installation of Heavy structures (MADE FROM ISMB 100 to ISMB 650, ISMC 75 to ISMC 300, ISA 25 to ISA 120), Pipe supports, Pipe racks, Pump & motor base frames
  • I have golden experience in Fabrication, erection and installation of M.S Piping 0.5 inch dia to 48inch dia,S.S piping 0.5 inch dia to 14inch dia,P.P piping 1inch dia to 12inch dia,HDPE piping 1 inch dia to14inch dia
  • I have work experience in Sabic Industries, Gulbrandson Chemicals, NovadigamChemicals,ZydusCadilaPharmashutical,AlembicChemicals,Exechon ePharmashuticals,Mangalore refinery and petrochemicals ltd.,Indian oil and corporation ltd.,Reliance Industries, Indian petrochemical ltd., Samsung Engineering, and L&T Engineering
  • I have good knowledge to read GA drawing, P&I diagram, Isometric Drawing and work as per drawing on site and workshop
  • I have good knowledge of the motor gear assembly, pump assembly, valve assembly as per drawing on site and workshop
  • I have good Experience to handling Projects and Shutdown job and to be completed within time period.

Senior Technician

CLIFTON PACKAGING PLC
04.2006 - 04.2007
  • To carry out Goods Inward Inspection of Incoming Raw Materials preparation and Review of Incoming Inspection standard & Incoming Inspection Plan
  • Analyzing the areas of improvement in process and incorporating Analyzing of production line complaints, abnormality reports and taking preventive actions to avoid reoccurrence of problems
  • Operate high speed slitting Machine (Titan SR 6, Titan SR 7, and HCI)
  • Operate rewinding machine, Operate doctoring machine
  • Interface with departments such as Quality Assurance, and maintenance of machines.

Education

Diploma in Mechanical -

Maharaja Sayajirao University
Vadodara, Gujarat
01.1996

Skills

  • Report Generation
  • Customer Success Management
  • Equipment monitoring
  • Heavy industrial equipment
  • Materials handling
  • Safety standards and protocols
  • Assembly and production
  • Forklift Operation

Timeline

IRON MOUNTAIN
07.2023 - 09.2012

Machine Operator, Machine Setting, Forklift Operator, Quality Checking

Rondo Building Services
01.2018 - 05.2019

Machine Operator, Overhead crane Operator, Forklift, Side loader Truck operator and quality checking

BEST BAR INDUSTRIES
08.2013 - 01.2018

Machine Operator and Forklift Operator

FOAMCO INDUSTRIES MINTO
09.2012 - 07.2013

Causal on call

TMS GROUP PVT. LTD.
03.2012 - 07.2012

Field Service Engineer

KOCH CHEMICAL TECHNOLOGY GROUP INDIA PVT. LTD.
06.2010 - 12.2011

Sr. Project Engineer

ROHDEEP ENGG.
04.2007 - 05.2010

Senior Technician

CLIFTON PACKAGING PLC
04.2006 - 04.2007

Diploma in Mechanical -

Maharaja Sayajirao University
Pramod Pawar