Hard, reliable and experienced tunnel/civil construction professional. I've Worked in these industries as laborer, heavy equipment operator, foreman and superintendent. I have experience in NATM, TBM, MTBM, EPB and road headers as well as concrete liner, grout, shotcrete (wet and dry) deep excavation, ground support and stabilization. Worked in both union and nonunion market supervising crews from 8 to 150 members in different crafts (laborers, operators, carpenters, pile drivers, welders and subcontractors)
Overview
27
27
years of professional experience
1
1
Certification
Work History
Civil Superintendent
Future Generation Joint Venture -FGJV
11.2024 - Current
Concrete operation at the Talbingo intake, Transition and TRT tunnel at the snowy 2.o project.
Optimized resource allocation by monitoring project progress and adjusting schedules as needed to minimize delays or disruptions.
Conducted site inspections to monitor progress, address issues, and ensure compliance with regulatory requirements.
Supervised a team of construction workers, providing guidance and mentoring for skill development.
Monitored work performance and productivity of subcontractors to comply with specifications, procedures, quality and safety requirements.
Tunnel Superintendent
Protecnium/Lane JV
06.2021 - 10.2024
Oversaw the entire adits excavation and connection process to ensure the highest level of quality, cost control, and efficiency.
In charge of preparation, execution, personnel, safety, and operations in all phases of [Type] project operations.
Ensured onsite safety and followed all OSHA regulations by [Action].
Met productivity, safety, and environmental control key performance indicators.
Client DC Water /Cost of project US$580,000.000
EPB Herrenknecht 25'
Site Supervisor
RC Concrete
09.2016 - 05.2021
Different clients throughout the 5 boroughs of New York and Long Island.
Projects cost from US$1,250,000 to US$65,000,000
Jobs consisted of demolition, concrete (Foundation and flat), shoring and lagging, tie backs, caissons, sheet piles and ground support and stabilization as well as concrete repairs via shotcrete application (wet and dry) and installation of FRP (Fiber Reinforced Polymer).
Ensured that projects were completed on time, within budget, and according to approved quality and cost estimates.
Conducted interviews, hired, and trained new employees.
Tunnel/Shaft Walker
IHP JV
08.2015 - 08.2016
Client DC Water/Cost of the project US$630,000,000
Led crews on the excavation and construction of shafts. oversaw the installation of sheet piles, walers, tie backs and surface excavation while training new employees.
Maintained a high level of professionalism and calmness with all personnel even in high-stress situations.
Tunnel Superintendent
Michels Corp
01.2014 - 06.2015
Client MTA/LIRR - Cost of the project part of US$12 Billion CMO-005.
Oversaw the entire lining process of the tunnel to ensure the highest level of quality, cost control, and efficiency.
Oversaw the excavation of the micro tunnel.
In charge of preparation, execution, personnel, safety, and operations in all phases of tunnel/liner project operations.
Reviewed plans and inspected ongoing construction to keep work on track with project goals.
Shaft/Tunnel Walker
S J Louis Construction-Tx Ltd
06.2012 - 11.2013
Client City of Austin/ Cost of the project US$135,000,000
Shaft sinking and tunneling with a road header , applying wet shotcrete, ground support and training new employees.
Tunnel Shifter
Obayashi
03.2011 - 06.2012
Client City of Austin/ Cost of the project US$145,000,000
Worked closely with tunnel walker training and supervising the crew while excavating and lining the tunnel.
Ran heavy equipments as well.
Tunnel/Shaft Walker
MOLE JV
08.2007 - 03.2010
Client City of Snellville/Cost US$95,000,000
Led crews on the excavation and construction of shafts and tunnel on hard rock. oversaw the sheet piles and caissons and the application of dry and wet shotcrete.
Provided support and mentoring to new team members as they learned various navigational duties, such as mining and running heavy equipment.
Tunnel Shifter/Shotcrete Walker
Gunther Nash
06.2005 - 07.2007
Client City of Atlanta/Cost US$105,000,000
Led crews on the excavation and construction of the shaft and tunnel/cavern to be connected to an existing CSO tunnel. Oversaw sheet piles installation and ran the shotcrete crew once the drilling and blasting was completed.
Trained crews on shotcrete application and running heavy equipment.
Heavy Equipment Operator/Tunnel Shifter
Obayashi
02.2003 - 05.2005
Maintained and cleaned the equipment, as well as inspecting it after each job.
Was in charge of operating excavators, loaders, muckers, forklifts, skid steers, man lifts and bobcats in order to complete work in a safe and efficient manner.
Led with the walker the crew while tunneling.
Tunnel Laborer/Shotcrete Laborer
Kiewit
04.1998 - 01.2003
Client City of Rio Piedra/ cost US$300,000,000
Started as a laborer then moved to heavy equipment operator to then became the person in charge of the shotcrete crew.
Worked with the sheet piles and caissons crews as well in the time there.