Summary
Overview
Work History
Education
Skills
Certification
Affiliations
Additional Information
Accomplishments
Software
Interests
Timeline
Generic

Ratu Ratu

Civil/Structural Engineer
Tuart Hill,WA

Summary

Experienced and dynamic Civil/structural engineer with deep understanding of engineering principles, theories, specifications, and standards. Bringing over five years of expertise, leadership, and drive to the table. A track record of successfully completing challenging projects on time and within budget. Familiar about the construction management process and project scheduling. Dedicated to expanding my knowledge and honing basic skills. I have completed Master of Civil Engineering at Edith Cowan University with distinction. Currently, I am working towards getting Chartered Engineer in the field of civil and structural engineering. Further, I am also working towards getting my Project Management Professional (PMP) Certification.

Overview

7
7
years of professional experience
6
6
years of post-secondary education
7
7
Certifications
1
1
Language

Work History

Civil/Structural Engineer

Logsys Power Services
02.2022 - Current
  • Completed accurate engineering calculations for loading analysis for utility poles (Steel & Wood) and towers such as wind, tension, axial in accordance with Australian Standards (AS 1170.2, AS/NZS 7000 & AS/NZS 4676, etc).
  • Designed Concrete Encased Composite Pole in accordance to Australian Standard and Euro Code and prepared calculation spreadsheet.
  • Evaluated the design capacity of reinforcing trusses for the utility wood pole using Australian Standards.
  • Completed accurate engineering calculations for weights, loads and other metrics using both manual and digital methods.
  • Assisted drafters in developing structural plans using drafting tools (Auto CAD).
  • Interpretation of the engineering drawings for civil/structural.
  • Designed and modeled the restoration solutions for steel tower and poles, which were affected by corrosion. Also, includes design of concrete foundation.
  • Attended professional training courses to maintain current knowledge and licensure.

Intern Civil Engineer

Westcom Groups
Malaga, WA
08.2021 - 01.2022
  • Reviewed tender documents to determine the scope of the work.
  • Estimation and quotation of all associated civil works as per the scope of work.
  • Evaluated specifications for facilities design to determine compliance with standards.
  • Interpretation of engineering drawings for civil and concrete tenders.
  • undertake material take-offs.
  • Prepare estimates of civil and concrete projects.
  • Develop construction methodologies and construction schedule and planning using MS projects.
  • Manage resources and labour.
  • Assisted with graphical representations of civil structural designs.

Civil Engineer

Bhutan Power Corporation Ltd
Thimphu, Bhutan
05.2014 - 07.2019


  • I was involved in preparing tender, contract documents, detail estimates, detail survey, project management, and Execution of the "Procurement of 132 kV Double Circuit Tower Type.
  • Distribution line from Motanga to Phuntshothang in Samdrup Jongkhar" and "Construction of 132 kV Double Circuit Transmission line from Kanglung to Phuntshothang and Motanga to Nganglam". The total contract price for this project was Nu 1098,019,331 (AUD 21,960,386.63)
  • Geotechnical Investigation of the proposed location of a project and determine the soil bearing capacity for the designing of foundation
  • Conducted Environmental Impact Assessment for "Procurement of 132 kV Double Circuit Tower Type Distribution line from Motanga to Phuntshothang in Samdrup Jongkhar"
  • Quality Inspection of the works in the contract i.e., conducted NDT for concrete
  • Visited project sites during construction to monitor progress and consult with contractor and on-site supervisor
  • Reviewed Calculations and analytical data to maintain accuracy of the technical reports
  • Designed retaining structure in accordance with international standards
  • Topographical Surveying, Designing, Cost Estimation, layout, execution and capitalization of "Construction of 6 Block (2 Units each) Semi-Permanent (Ekra) Staff Quarter at Gayzor, Samdrup Jongkhar
  • Estimated quantities and cost of materials, equipment, and labour to determine project feasibility
  • Advised Managerial staff about design, construction, and program modifications
  • Determined schedule and budget requirements for the projects under Transmission Projec Office, Samdrup Jongkhar.

Assistant Site Engineer (Intern)

Gayjur Construction Company Pvt. Ltd
Wangdue Phodrang, Bhutan
08.2013 - 01.2014
  • Supervision of the construction of infra-structure and other associated works for Punatsangchhu Hydro Project Authority-I Colony at Bjimthangkha, Wangdue Phodrang, Bhutan
  • Inspecting the quality of the works and assisting in preparation of bills
  • Assisting the site engineer with daily routine works

Education

Master of Science - Civil Engineering

Edith Cowan University
Joondalup, WA
07.2019 - 05.2021

Bachelor of Technology - Civil Engineering

K L University
Vijayawadha, India
08.2009 - 06.2013

Skills

Construction management

undefined

Certification

2022 PMP Certification Training Course

Affiliations

2019 – Present Member - Engineers Australia Ratu– Resume 7

Additional Information

  • Management and Construction Technology units. Applied AS5216, AS3850 and AS1012 series for researching the structural performance of cast-in anchors in Ultra-High Strength Concrete (UHSC) as part of Final Year Engineering Project. Aware of AS4000:1997 General Conditions of Contract Applied AS/NZS 7000:2016 Overhead Line Design for designing of transmission line towers, utility pole (steel), and to calculate sag and tension. Applied AS/NZS 4676:2000 Structural Design Requirements for utility Services Poles Ratu– Resume 2 AS/NZS 2327:2017 Composite Structures & AS 5100.6: 2017 Steel and Composite Construction for designing of concrete composite pole. Proficiency in using CHECKPOLE & CHECKWIND Used this in the current job to validate the calculate the windspeed of the transmission structures (Pole & tower) Proficiency in using AutoCAD, SPACEGASS and HEC-RAS Modelled and designed a two-storey steel structure building using Spacegass for an assignment in Steel Design and Civil Engineering Design and obtained high distinction marks. AutoCAD was used for drafting the plan for the same assignment. Modelled and design channel for Helena River at Ngangaguringguring, WA using HEC- RAS as a part of assignment in Hydrology and Hydraulics unit.

Accomplishments

  • Used Microsoft Excel to develop design calculation spreadsheets for steel design, composite encased pole design, wind load, sag & tension, timber pole design, truss design etc.
  • Successfully completed "construction of 132 kV D/C transmission line from Motanga to Phuntshothang in Samdrup Jongkhar"

Software

Spacegass

Staad Pro

Arc GIS

Interests

Basketball

Football

Timeline

Civil/Structural Engineer

Logsys Power Services
02.2022 - Current

Intern Civil Engineer

Westcom Groups
08.2021 - 01.2022

Master of Science - Civil Engineering

Edith Cowan University
07.2019 - 05.2021

Civil Engineer

Bhutan Power Corporation Ltd
05.2014 - 07.2019

Assistant Site Engineer (Intern)

Gayjur Construction Company Pvt. Ltd
08.2013 - 01.2014

Bachelor of Technology - Civil Engineering

K L University
08.2009 - 06.2013
2022 PMP Certification Training Course
2017 Certificate in Gas Insulated Substation (GIS) for Civil Engineer
Indonesia Professional Development Centre, Jakarta, Indonesia
2015 Certificate in Surveying of High Voltage Transmission Line
College of Science and Technology, Phuentsholing, Bhutan
2013 Participated in two-day workshop on ARC GIS
ESRI, India
Ratu RatuCivil/Structural Engineer