Crane Operator, Advanced Rigger and Scaffolder with a wide range of experience in Marine Construction, Bridge construction, Wharf construction, Demolition work, Gas plants, Power stations and Refineries.
Overview
26
26
years of professional experience
Work History
Rigger / Crane Operator
Fitzgerald Constructions
02.2021 - Current
Piling operations.
Jack up barge operation.
Lattice boom crane assembly.
Rigged for heavy lifts according to lift plan.
Improved lifting efficiency with proper selection of rigging equipment for specific tasks.
Increased workplace safety by conducting regular rigging inspections and equipment maintenance.
Worked at heights and in confined spaces without difficulty.
Leading hand/ Rigger
Brady Marine and Civil
10.2016 - 02.2021
Bridge and Wharf construction projects
Operated 300 tonne crawler on floating barge.
Enhanced team productivity by efficiently allocating tasks and closely monitoring progress.
Promoted safety awareness among the workforce, leading to reduced incidents and accidents on site.
Cultivated a positive work environment that fostered teamwork, collaboration, and continuous improvement.
Applied troubleshooting and diagnostics abilities to assess repair and maintenance needs.
Installation of bridge girders.
Installation of pre-cast deck panels.
Wharf demolition.
Rigger/ Crane operator
Bechtel
12.2013 - 07.2016
Continous night shift contract on LNG plant construction and commissioning.
Rigged for heavy lifts according to lift plan requirements.
Assisted in the development of lift plans.
Improved lifting efficiency with proper selection of rigging equipment for specific tasks.
Steel erection and gas turbine assembly.
Rigger
Waterway Construction
09.2013 - 12.2013
Leading hand for channel marker upgrade in Gladstone Harbour.
Working from floating barge.
Rigger / Crane Operator
Brady Marine and Civil
01.2012 - 09.2013
Construction on aggregate wharf, ferry terminals and main jetty piles for LNG project, from floating barge.
Piling works and hammer operations.
Floating barge operation.
Rigger/ Scaffolder
Bechtel
08.2009 - 05.2010
Refinery construction project.
Project steel erection boiler house.
Tube and coupler scaffold.
Swing stage scaffold.
Leading Hand / Rigger / Scaffolder
Golding Constructions
06.2008 - 08.2009
Construction of refinery wharf
Operated 20 tonne Kobelco crane on floating barge.