Summary
Overview
Work History
Education
Skills
Timeline
Generic
Riemil Usi

Riemil Usi

Sydney,Australia

Summary

Riemil is a Digital Engineer with 10+ years of experience in delivering detailed engineering models and drawings for major infrastructure projects across New South Wales. Highly skilled in Autodesk Civil 3D and 12D Synergy, with proven ability to develop road, stormwater drainage, and earthworks models aligned with Australian design standards and client requirements. Recognized for effective project coordination, teamwork, and clear communication with stakeholders, authorities, and contractors. Detail-oriented problem solver dedicated to smart, sustainable, and innovative engineering solutions.

Overview

2026
2026
years of professional experience

Work History

Project Drafting Lead

MU Group
05.2025 - Current

Summary: Leading and supporting drafting teams for detailed design packages across multiple road infrastructure projects. Responsibilities include managing and coordinating deliverables, quality control, ensuring compliance with design standards, collaborating with multi-disciplinary teams, and driving efficient drafting workflows. This role involves both local and offshore resource management to meet project goals, with high-quality output.

Projects:

  • Mildura Rise Estate - Bruce Highway Upgrade and Entry Promenade Detailed Design (AUG 2025 - Present)
  • Bylong Valley Way - Road Safety Improvement Works (OCT 2025 - Present)
  • Mamre Road Upgrade - Detailed Design (JUN 2025 - AUG 2025)
  • Easing Sydney's Congestion Program (ESC) - Multiple road infrastructure improvement packages (APR - NOV 2024)
  • Parramatta Light Rail Stage 2 - Early Works (JAN - MAR 2024)
  • John Gorton Drive Molonglo River Bridge (MAR 2023 - OCT 2024)

Digital Designer and Coordinator

GHD
01.2023 - 01.2024
  • Managed and modified road design and associated outputs to accommodate various vehicles using the internal roads at the Upper South Creek Advanced Water Recycling Center.
  • Coordinated multidisciplinary inputs, and ensured design compliance with client standards and project specifications.
  • Played a key role in delivering sustainable wastewater services infrastructure, contributing to a greener urban environment.

Projects:

  • Upper South Creek Advanced Water Recycling Centre (JAN 2023 - JAN 2024)
  • Prospect Dam Profile Development (FEB 2023 - MAY 2023)

Civil Technician

WSP and ARCADIS
01.2016 - 06.2021

Executed detailed design drafting and technical duties in support of major road and rail infrastructure projects. Tasks included the preparation of road geometry, drainage, signage, pavement, traffic staging, and safety improvements while adhering to relevant government and client standards. Coordinated draft versions and maintained documentation for the audit and construction phases.

Projects:

  • M12 Motorway West and East Detailed Design (2020-2021)
  • Appin Road Safety Improvement Design (2020)
  • Parramatta Light Rail Stage 1 - Supply, Operate and Maintain Contract (2019)
  • Sydney Gateway Project Concept Design (2018)
  • Pacific Highway Upgrade Project (Woolgoolga to Ballina, Portion A and B) (2016 - 2018)
  • Sydney Metro Underground Station Design and Technical Services (2017)

Site Engineer

Transport for NSW
2015 - 2015
  • Overseeing construction activities on-site, ensuring compliance with design specifications, and safety standards.
  • Coordinating between project managers, subcontractors, and engineers to resolve site issues, monitor progress, and ensure timely delivery.
  • Conducting quality inspections, and maintaining communication with stakeholders, for smooth project execution.

Project

  • Asia Enclaves (2015)

Headworks Unit Manager

Manila Water Company Incorporated
2013 - 04.2015
  • Managed the Headworks Unit responsible for planning, designing, and delivering infrastructure headworks, including water, sewer, and stormwater systems.
  • Led the coordination of teams in project delivery, budgeting, resourcing, and stakeholder engagement.
  • Ensured regulatory compliance and timely completion of unit objectives, aligned with organizational goals.

Projects:

  • Angat-Ipo-La Mesa Dam Daily Operations (2013–2015)
  • Headworks Flow Meter Upgrades (2014)

Education

Bachelor of Science - Civil Engineering

University of The Philippines
Diliman, Quezon City, Philippines
04-2013

Skills

  • Digital design
  • Design coordination
  • Project management
  • Quality control
  • AutoCAD Civil 3D, 12D Synergy, Navisworks, AutoCAD
  • Road, stormwater, and earthworks design to Australian Standards
  • Project documentation and data management (ProjectWise, 12D Synergy)
  • Cross-disciplinary team coordination (onshore and offshore)
  • Civil drafting, scripting, and design model QA
  • Strong verbal and written communication
  • Problem solving, attention to detail, and analytical thinking

Timeline

Project Drafting Lead

MU Group
05.2025 - Current

Digital Designer and Coordinator

GHD
01.2023 - 01.2024

Civil Technician

WSP and ARCADIS
01.2016 - 06.2021

Site Engineer

Transport for NSW
2015 - 2015

Headworks Unit Manager

Manila Water Company Incorporated
2013 - 04.2015

Bachelor of Science - Civil Engineering

University of The Philippines
Riemil Usi