Summary

Dependable foreman recognised for consistency in productivity and attendance while showing a positive attitude in light of challenging situations. A site manager that brings strong leadership and experienced skills along with the respect for client standards and input. I have completed a number of RMS and Tfnsw jobs over the past 14 years. Willing to share and expand my knowledge and experience with a reputable company. Previous jobs I have helped deliver;

  • Port Botany (fulton hogan)
  • Sydney airport (Ward Civil)
  • Sydney airport (BMD)
  • M4 (CPB)
  • Richmond rd + Blacktown rd upgrade (Ward Civil).
  • M4 smart motorway (fulton hogan)
  • KGRIU (king George's rd integration upgrade) fulton hogan.
  • B-LINE (fulton hogan)
  • IMEX (fulton hogan)
  • M7 ramps @ lighthorse interchange (fulton hogan).
  • 26Km share path wagga wagga (fulton hogan)
  • Upper south creek (WRDT)
  • Multiple sydney water treatment plant maintenance (WRDT)
  • Prospect hwy upgrade (fulton hogan)

Overview

23
23
years of professional experience

Work History

Civil Foreman

Xsite Civil Pty ltd
02.2023 - Current
  • Carry out the daily pre-start.
  • Conduct tool-box talks upon site changes or injury to personnel.
  • Lead a large team on night shift to carry out slab replacements and asphalt placement confined to ROL times.
  • Plan & coordinate with contractors for water-main installations.
  • Oversee works for water-mains, gas & HV cut overs.
  • Plan, coordinate and oversee drainage installation RCP & FRC
  • Plan, coordinate & execute weekend shutdown works and traffic switches.
  • Lead a large crew (50+) workers on a daily basis to complete critical path works.
  • Coordinated with construction manager & engineers to manage project costs.
  • Carry out weekly shift planning and daily reporting.
  • Coordinate day-to-day activities of crew to satisfy project needs.
  • Organise plant & labour on a daily basis for project efficiency.
  • Planned and delegated work for multiple construction crews.
  • Enhanced project efficiency by implementing streamlined processes for construction tasks.
  • Planned & lead multiple crew to install M4 smart motorway utilities.
  • Maintain high standards of safety, productivity and quality for every job.
  • Working to RMS & Tfnsw specifications.
  • Reduced project delays by effectively managing and coordinating work crews on job sites.
  • Carry out daily site inspections

Project Superintendent

Fulton Hogan
01.2021 - 02.2023
  • Compile project construction methodology.
  • Review project contract and all other project documentation.
  • Coordinate site compound establishment & set up of offices, lunch rooms and ablution blocks.
  • Liaise with client to satisfy project requirements.
  • Engage and on-board contractors.
  • Liaise with relevant stakeholders.
  • Review & compare contractor rates.
  • Establish QMP for project.
  • Review P6 construction program.
  • Support construction manager with project costs.
  • Conducted site walks with client (WRDT) and other corporate parties.
  • Oversee selection, procurement and allocation of building materials and equipment.
  • Provided guidance and leadership to project team, fostering a positive work environment that encouraged collaboration & professional growth.
  • Support foreman and engineers with all issues.

Civil Foreman

Fulton Hogan
02.2014 - 03.2019
  • Involvement with weekly project cost reviews
  • Lead multiple crews to install infrastructure.
  • Planned & executed piling works for structural signs.
  • Enhanced communication between supervisors & engineers.
  • Lead large team's to complete multiple work fronts at the same time on critical path work.
  • Worked to quality standard and implemented safety requirements for individual tasks.
  • Review of HIDRA's
  • Review CEMP
  • Planned and coordinated material import (DGB,sandstone,stabilised & select material)
  • Carried out shift planning and reporting.
  • Resourcing materials,labour and machine requirements.
  • Organized and lead sub contractors to carry out project requirements.
  • Coordinated a number of crews to carry out environmental controls.
  • Conducted SWMS reviews.
  • Worked to a high safety standard.

Leading Hand

South west civil
08.2012 - 02.2014
  • Supervise small crew to install utilities.
  • Operate plant (excavators, posi track, dump trucks, rollers and dozers).
  • Help coordinate bulk earth work machinery (scrapers,graders,dozers)
  • Use of Rover (GPS)
  • Load up machines with construction design from surveyor.
  • Final trim with excavator and posi track GPS & UTS.
  • Concrete (footpath,kerb & gutter,approach slabs)
  • Install subsoil's & no-fines blocks
  • Help coordinate truck and dog movements on site & keep track of material dockets.
  • Install concrete pre cast units (culverts, kerb entry units,panels)
  • Install storm water pits & pipe.
  • Carry excavation permits and run through areas with operators.
  • Sign new workers onto SWMS

Labourer

South west civil
04.2009 - 08.2012
  • Performed general labouring tasks such as, site compound tidy up, site wide clean, installation of sediment controls, operate roller, operate jumping jack and DPU
  • Install ATF and crowd control barriers.
  • Pump out water after rain events.
  • Drill dowel holes and jackhammer concrete
  • Form and pour concrete.

Carpenter

Fairmont homes
10.2005 - 03.2009
  • Fit out of new houses (skirting & architraves)
  • Construct and stand frames and trusses.
  • Cut in roofs and install eaves.
  • Constructed pergola's and decks.
  • Safe use of hand and power tools.
  • Carried out extensions on older homes.
  • Constructed custom fireplaces.

Mechanical Engineer

Nepean Engineering
01.2001 - 10.2005
  • Performed machining jobs on manual milling machine.
  • Performed machining jobs on manual lathe.
  • Carried out fitting works (die mould works)
  • Use computer program to carry out work on automatic CNC milling machine, horizontal boring machine and lathe.
  • Complete jobs within 0.01 tolerance.
  • Machine aircraft components for Boeing.
  • Use of vernier calipers, micrometer, and other precise tooling.

Education

GED -

Eaglevale High School
Eaglevale, Nsw
0 2002

Mechanical Engineering - Fitting Machining

UNSW
Campbelltown, NSW
2 2005

Cert IV Building Construction - Building Construction

UNSW
Campbelltown, NSW
10 2008

Skills

  • Planning and resourcing
  • Effective communication skills
  • Organization of crews and subcontractors
  • Problem solving and change of management controls
  • Creating a good morale amongst the team
  • Cost control
  • Bulk earth works
  • Pavement and utilities
  • Finishing works
  • Bridge & structures
  • Water, Gas, HV installation
  • Work Planning and Prioritization
  • Subcontractor Management

Timeline

Civil Foreman

Xsite Civil Pty ltd
02.2023 - Current

Project Superintendent

Fulton Hogan
01.2021 - 02.2023

Civil Foreman

Fulton Hogan
02.2014 - 03.2019

Leading Hand

South west civil
08.2012 - 02.2014

Labourer

South west civil
04.2009 - 08.2012

Carpenter

Fairmont homes
10.2005 - 03.2009

Mechanical Engineer

Nepean Engineering
01.2001 - 10.2005

GED -

Eaglevale High School

Mechanical Engineering - Fitting Machining

UNSW

Cert IV Building Construction - Building Construction

UNSW
Robert Anderson