With a broad career range from several years in the construction industry as a contract carpenter and business owner, contracting within multiple fields including Rail construction and maintenance, Formwork and steel fixing, fencing, bathroom/kitchen construction and internal fitout, I strive to excel in any and all fields that I am responsible for. With a proven record in contract carpentry and trade procurement and organization, great communication skills, plan interpretation and execution and ensuring works carried out are within Australian Industry Standards, maintaining budgets and problem solving being some of the few aspects of being a business owner and contractor in the construction industry. With a hunger to continuously learn and stay in touch with an ever evolving industry, I relish in the challenges that come with branching out and embarking on my next challenge and pride myself on my ability to learn quickly in real time.
Pre-starting workers at separate locations from Supervisor
Running multiple crews and subcontractors across multiple sites
Organising plant and equipment for work groups
Speaking with engineers to ensure targets are met
From site setup to FRP tunnel works, Paving the blinding slab for the @grade, Claremont Shaft works, Rail in the tunnels to now rail works on the viaducts, I have been apart of alot of the Parklife Metro project
Construction of the rail network from Chatswood to Marrickville Including SMTF SOUTH.(Laying sleepers, spacing sleepers, threading rail, clipping up and alignment of rial, checking and fixing gauge defects and height and super corrections, EDILONG construction for track slab at SMTF South) Towards the end of the project I was a crucial key to the finishing process and demob, Prestarting and running multiple crews mainly on Nightshift being the main point of contact to complete Re-certification of track after testing, along with running the profile grinding and prep for it, to clearing all defects including the re ferreling of the diamond at Barangaroo, all walkway defects including installing new ones over the bonds cables to meet the standards from the Fire Safety, Tunnel Leaks with Crack Injection And clearing all rail defects ready for handover for Metro.
General Carpentry and 2nd floor constructions and renovations