Maxwells - Airleg Bolter / All Rounder
- Airleg bolting
- Development and production charging
- Mag keeping and stock takes
- Bogging decline and ore drive
- Sandvik Jumbo training bolting and rehab
Fosterville / Olympic dam - Shaft Sinker
- Airleg operations, vertical development
- Strip bolt mesh shaft and shaft rehab
- Prep and charging shaft bench
- Install of Ground support split sets, Gewi and cables
- Boring bench (sinker)
- Vent rises (Shrinks)
- Set up and dismantled head frame
- Rope change outs
Leinster - Project crew
- Welding and oxy works underground
- Fan Installation and removal - primary and secondary
- Brattice and blast walls and dry mix shotcrete
- Concreting pads workshop and jumbo service bays
- Vent door installs and bogger / truck stops
- Telehandler and IT operations
- Paste pipe install and rise and main